A small description of the journey phase 2. After KOTA spewd was not uptobthe mark. Lots of cautiona and speed restriction and Reached BRC at 22.30 . At BRC 12953 was on opposite platform as usual. Before BRC the dinner was served. Train deaprted BRC at 23.00 lead by ED aloco twins. And reached BSR on time and arrived PNVL with a delay of 5 mins. In KR ed twins were in full trotle and reached RN at 8.55. And sawanthavadi road and 11.40 and MAO at 12.40 post . There was a amall delay in.Karvar and udupi. And handed pver to SR at Thokkur pn time and reacjwd MAJN at 18.00 and departwd at 18.20 . Reached CAN CLT and SRR before scheduled time and same at TCR and ERSAlso.