Timeline UpdatesTrip UpdatesNews PostsPvt PostsTravel TipsAdmin PostsConv PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Tue Sep 2, 2014 00:11:44 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Post a Comment/Question/Picture/VideoPost a Comment/Question/Picture/Video    Post a Train TipPost a Train Tip **new    Post a Station TipPost a Station Tip **new    Super Search
Topics:    Filters:

Blog Posts by chanchal
Page#    Showing 1 to 10 of 200 blog entries  next>>
Predictions: 14
confirm: 9
rac: 4
wl: 1
Journey: Fri Oct 18, 2013 @ 10:20
12722/Dakshin SF Express
Entry# 879057
   Posted by: chanchal   8 blog posts   2110 correct pred (84% accurate)
PNR: 225-xxxxxxx    |   Sleeper - SL   |   Tot Seats: Avbl >48   |   Charting: < 06:18   |   Similar PNRs
BPL/Bhopal Junction   to   HYB/Hyderabad Deccan Nampally   |   973 km / 1668 km
Original Status as of: Oct 16 2013 (9:21PM)
Passenger 1: Waitlist# 8 (Booking Status: W/L 33,RLGN)
Passenger 2: Waitlist# 9 (Booking Status: W/L 34,RLGN)
Passenger 3: Waitlist# 10 (Booking Status: W/L 35,RLGN)
Passenger 4: Waitlist# 11 (Booking Status: W/L 36,RLGN)
Passenger 5: Waitlist# 12 (Booking Status: W/L 37,RLGN)
Passenger 6: Waitlist# 13 (Booking Status: W/L 38,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Oct 17 2013 (9:04PM)
Passenger 1: RS5 63/Coach Position:10 (Booking Status: W/L 33,RLGN)
Passenger 2: RS5 63/Coach Position:10 (Booking Status: W/L 34,RLGN)
Passenger 3: Waitlist# 1 (Booking Status: W/L 35,RLGN)
Passenger 4: Waitlist# 2 (Booking Status: W/L 36,RLGN)
Passenger 5: Waitlist# 3 (Booking Status: W/L 37,RLGN)
Passenger 6: Waitlist# 4 (Booking Status: W/L 38,RLGN)
Chart PREPARED

444 views
Oct 17 2013 (10:47PM)        

KMonIRI**   2063 blog posts   39122 correct pred (71% accurate)     Ph:+919330451736
Re# 879057-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
6 passenger or 1 berth
Predictions: 63
confirm: 48
rac: 15
wl: 0
Journey: Tue Oct 15, 2013 @ 19:20
12627/Karnataka Express
Entry# 830746
   Posted by: chanchal   8 blog posts   2110 correct pred (84% accurate)
PNR: 435-xxxxxxx    |   Sleeper - SL   |   Tot Seats: Avbl >366   |   Charting: < 11:29   |   Similar PNRs
SBC/Bangalore City Junction   to   NDLS/New Delhi   |   2409 km / 2409 km
Original Status as of: Aug 18 2013 (6:26PM)
Passenger 1: RAC 59 (Booking Status: RAC 69,GNWL)
Passenger 2: RAC 60 (Booking Status: RAC 70,GNWL)
Passenger 3: RAC 61 (Booking Status: RAC 71,GNWL)
Passenger 4: RAC 62 (Booking Status: RAC 72,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Oct 15 2013 (6:24PM)
Passenger 1: RS13 39 (Booking Status: RAC 69,GNWL)
Passenger 2: RS13 39 (Booking Status: RAC 70,GNWL)
Passenger 3: RS13 47 (Booking Status: RAC 71,GNWL)
Passenger 4: RS13 47 (Booking Status: RAC 72,GNWL)
Chart PREPARED

353 views
Oct 15 2013 (6:22PM)        

ºMr Suspectº**   3040 blog posts   18978 correct pred (89% accurate)  
Re# 830746-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Dearest KK Express screwed up prediction accuracy today :P
Predicted for 4 PNRs to confirm and all 4 landed in RAC :P
/pnr/post/829114
/pnr/post/829117
/pnr/post/829118
Predictions: 35
confirm: 26
rac: 9
wl: 0
Journey: Fri Oct 11, 2013 @ 19:23
12630/Karnataka Sampark Kranti Express (Via Hubli)
Entry# 847958
   Posted by: chanchal   8 blog posts   2110 correct pred (84% accurate)
PNR: 215-xxxxxxx    |   Sleeper - SL   |   Tot Seats: Avbl >44   |   Charting: < 14:23   |   Similar PNRs
BPL/Bhopal Junction   to   YPR/Yesvantpur Junction   |   1919 km / 2615 km
Original Status as of: Sep 10 2013 (9:52AM)
Passenger 1: Waitlist# 4 (Booking Status: W/L 4,RLGN)
Passenger 2: Waitlist# 5 (Booking Status: W/L 5,RLGN)
Passenger 3: Waitlist# 6 (Booking Status: W/L 6,RLGN)
Passenger 4: Waitlist# 7 (Booking Status: W/L 7,RLGN)
Passenger 5: Waitlist# 8 (Booking Status: W/L 8,RLGN)
Passenger 6: Waitlist# 9 (Booking Status: W/L 9,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Oct 11 2013 (5:35PM)
Passenger 1: S4,9/Coach Position:9 (Booking Status: W/L 4,RLGN)
Passenger 2: S4,10/Coach Position:9 (Booking Status: W/L 5,RLGN)
Passenger 3: S4,14/Coach Position:9 (Booking Status: W/L 6,RLGN)
Passenger 4: S4,18/Coach Position:9 (Booking Status: W/L 7,RLGN)
Passenger 5: S4,19/Coach Position:9 (Booking Status: W/L 8,RLGN)
Passenger 6: S4,22/Coach Position:9 (Booking Status: W/L 9,RLGN)
Chart PREPARED

377 views
Oct 11 2013 (4:32PM)        

chanchal   8 blog posts   2110 correct pred (84% accurate)  
Re# 847958-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
my all friends this will be 100% confirm
already note seat will allotted in S4,
31,39 etc

367 views
Oct 11 2013 (4:33PM)        

Konkan Kanya Express**   8216 blog posts   14378 correct pred (74% accurate)     Ph:+919819754110
Re# 847958-2               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
HO ke liye apply kiya hai kya..
Predictions: 36
confirm: 36
rac: 0
wl: 0
Journey: Mon Jul 22, 2013 @ 20:37
15013/Ranikhet Express
Entry# 803939
   Posted by: chanchal   8 blog posts   2110 correct pred (84% accurate)
PNR: 234-xxxxxxx    |   Sleeper - SL   |   Tot Seats: Avbl >40   |   Charting: < 12:45   |   Similar PNRs
DEE/Delhi Sarai Rohilla   to   KGM/Kathgodam   |   281 km / 1263 km
Original Status as of: Jul 09 2013 (4:29PM)
Passenger 1: Waitlist# 3 (Booking Status: W/L 15,RLGN)
Passenger 2: Waitlist# 4 (Booking Status: W/L 16,RLGN)
Passenger 3: Waitlist# 5 (Booking Status: W/L 17,RLGN)
Passenger 4: Waitlist# 6 (Booking Status: W/L 18,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jul 25 2013 (12:45PM)
Passenger 1: SE,9 (Booking Status: W/L 15,RLGN)
Passenger 2: SE,12 (Booking Status: W/L 16,RLGN)
Passenger 3: SE,10 (Booking Status: W/L 17,RLGN)
Passenger 4: SE,11 (Booking Status: W/L 18,RLGN)
Chart PREPARED

858 views
Jul 22 2013 (11:04AM)        

Ankit**   2500 blog posts   78555 correct pred (77% accurate)  
Re# 803939-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.

2 posts - Tue Jul 23, 2013 - are hidden. Click to open.

1 posts - Thu Jul 25, 2013 - are hidden. Click to open.
Predictions: 31
confirm: 7
rac: 17
wl: 7
Journey: Wed Jun 05, 2013 @ 19:30
12187/Jabalpur - Mumbai CST Garib Rath Express
Entry# 774295
   Posted by: chanchal   8 blog posts   2110 correct pred (84% accurate)
PNR: 871-xxxxxxx    |   AC 3-tier - 3A   |   Tot Seats: Avbl >799   |   Charting: < 11:51   |   Similar PNRs
JBP/Jabalpur Junction   to   CSTM/Mumbai CST   |   994 km / 994 km
Original Status as of: Jun 04 2013 (5:24PM)
Passenger 1: Waitlist# 94 (Booking Status: W/L 378,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 06 2013 (9:46AM)
Passenger 1: G15,69/Coach Position:18 (Booking Status: W/L 378,GNWL)
Chart PREPARED

807 views
Jun 05 2013 (2:38PM)        

amitvalunj   692 blog posts   15105 correct pred (65% accurate)  
Re# 774295-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Superbbbbbbbbbbb ... 100 + cancellation in just 21 hours .

646 views
Jun 06 2013 (9:30AM)        

amitvalunj   692 blog posts   15105 correct pred (65% accurate)  
Re# 774295-2               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Great GR rockssss . . .
Predictions: 11
confirm: 6
rac: 2
wl: 3
Journey: Thu Jun 13, 2013 @ 19:20
12920/Malwa Express
Entry# 775194
   Posted by: chanchal   8 blog posts   2110 correct pred (84% accurate)
PNR: 244-xxxxxxx    |   Sleeper - SL   |   Tot Seats: Avbl >184   |   Charting: < 14:18   |   Similar PNRs
NDLS/New Delhi   to   BINA/Bina Junction   |   564 km / 1544 km
Original Status as of: Jun 05 2013 (5:25PM)
Passenger 1: Waitlist# 17 (Booking Status: W/L 24,RLGN)
Passenger 2: Waitlist# 18 (Booking Status: W/L 25,RLGN)
Passenger 3: Waitlist# 19 (Booking Status: W/L 26,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 06 2013 (9:39AM)
Passenger 1: Can/Mod (Booking Status: W/L 24,RLGN)
Passenger 2: Can/Mod (Booking Status: W/L 25,RLGN)
Passenger 3: Can/Mod (Booking Status: W/L 26,RLGN)
Chart NOT Prepared

445 views
Jun 05 2013 (5:27PM)        

rakeshsoni334   6 blog posts   1 correct pred (25% accurate)  
Re# 775194-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
100% no chance confirm this ticket , please cancil your ticket urgentlly
Predictions: 11
confirm: 11
rac: 0
wl: 0
Journey: Fri May 31, 2013 @ 10:45
04012/New Delhi - Sai Nagar Shirdi Weekly SF AC Special
Entry# 769471
   Posted by: chanchal   8 blog posts   2110 correct pred (84% accurate)
PNR: 224-xxxxxxx    |   AC 1st Class - 1A   |   Similar PNRs
BPL/Bhopal Junction   to   BSL/Bhusaval Junction   |   399 km / 1368 km
Original Status as of: May 30 2013 (2:12PM)
Passenger 1: Waitlist# 4 (Booking Status: W/L 11,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 30 2013 (8:14PM)
Passenger 1: H1,D/Coach Position:16 (Booking Status: W/L 11,GNWL)
Chart PREPARED

1048 views
May 30 2013 (2:14PM)        

ºMr Suspectº**   3040 blog posts   18978 correct pred (89% accurate)  
Re# 769471-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
are u aware of quota of Samta Express from bhopal?
Predictions: 13
confirm: 8
rac: 5
wl: 0
Journey: Wed May 29, 2013 @ 09:40
13026/Bhopal-Howrah (Weekly) Express
Entry# 762605
   Posted by: chanchal   8 blog posts   2110 correct pred (84% accurate)
PNR: 821-xxxxxxx    |   Sleeper - SL   |   Tot Seats: Avbl >256   |   Charting: < 07:00   |   Similar PNRs
BINA/Bina Junction   to   HWH/Kolkata Howrah Junction   |   1318 km / 1457 km
Original Status as of: May 23 2013 (4:33PM)
Passenger 1: Waitlist# 4 (Booking Status: W/L 30,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 28 2013 (8:56PM)
Passenger 1: EX1,45 (Booking Status: W/L 30,GNWL)
Chart PREPARED

984 views
May 28 2013 (8:35PM)        

rdb**   20412 blog posts   249947 correct pred (77% accurate)  
Re# 762605-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Predictions: 4
confirm: 0
rac: 0
wl: 4

[overstamped]
Journey: Tue May 28, 2013 @ 15:05
12646/Millennium Express
Entry# 766630
   Posted by: chanchal   8 blog posts   2110 correct pred (84% accurate)
PNR: 224-xxxxxxx    |   AC 2-tier - 2A   |   Charting: < 09:39   |   Similar PNRs
BINA/Bina Junction   to   ED/Erode Junction   |   1944 km / 2807 km
Original Status as of: May 27 2013 (3:28PM)
Passenger 1: Waitlist# 16 (Booking Status: W/L 78,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 28 2013 (1:22PM)
Passenger 1: Waitlist# 3 (Booking Status: W/L 78,GNWL)
Chart PREPARED

842 views
May 28 2013 (2:12AM)        

Guest: 7fc0eae7   show all posts
Re# 766630-4               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
Wow!!
Stamping Stamping game chal raha hai kya?

3 posts - Tue May 28, 2013 - are hidden. Click to open.
Predictions: 6
confirm: 4
rac: 0
wl: 2
Journey: Wed May 22, 2013 @ 01:35
12923/Indore - Nagpur Express
Entry# 760102
   Posted by: chanchal   8 blog posts   2110 correct pred (84% accurate)
PNR: 850-xxxxxxx    |   Sleeper - SL   |   Tot Seats: Avbl 150   |   Charting: < 17:50   |   Similar PNRs
HBJ/Bhopal HabibGanj   to   NGP/Nagpur Junction   |   383 km / 606 km
Original Status as of: May 21 2013 (1:58PM)
Passenger 1: Waitlist# 14 (Booking Status: W/L 33,CK)
Passenger 2: Waitlist# 15 (Booking Status: W/L 34,CK)
Passenger 3: Waitlist# 16 (Booking Status: W/L 35,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: May 22 2013 (9:43AM)
Passenger 1: Can/Mod (Booking Status: W/L 33,CK)
Passenger 2: Can/Mod (Booking Status: W/L 34,CK)
Passenger 3: Can/Mod (Booking Status: W/L 35,CK)
Chart PREPARED

748 views
May 21 2013 (6:09PM)        

Rodrock   821 blog posts   22652 correct pred (66% accurate)  
Re# 760102-1               Tags   Past Edits
This is a new feature showing the full history of past edits to this Blog Post. All members will now be able to Edit and refine their past and future Blog Posts with NO time limit.
c
Page#    200 blog entries  next>>

ARP Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Sep 12, 2014
Trains with ARP 30 Dep on: Thu Oct 2, 2014
Trains with ARP 60 Dep on: Sat Nov 1, 2014

  
  

Rail News

New Trains

Site Announcements

  • Entry# 1193896
    Aug 21 (10:23PM)


    The new IRI logo can now be seen. Actually, we are reluctant to make changes to the logo (for the sake of recognizability and consistency), but some very slight modification was done this time. Here is the post-facto rationalization of the logo: . 1. The Chakra is the Wheel symbolizing Transportation/Travel which...
  • Entry# 998985
    Feb 17 2014 (09:34PM)


    There was some persistent glitch, requiring us to stop and restart all the servers. This led to a 30 minute outage. Really sorry about that. Thanks for everyone's patience.
  • Entry# 996949
    Feb 15 2014 (09:22PM)


    There have been some reports that the IRI Atlas is not visible. This seems to be some problem at the Google Maps end. To resolve this, please log out and log back in, and everything should start working. Thanks.
  • Entry# 952669
    Jan 02 2014 (10:20AM)


    This is to notify all members that hereafter, topics on the subject of "Train xyz Running Empty ... # Seats Vacant ..." will be PROMPTLY DELETED. . Members of IRI need not worry themselves and lose sleep over "IR making losses". IR will take care of it. IR is, in all probability, monitoring their...
  • Entry# 932140
    Dec 12 2013 (01:34AM)


    Over the last month, several enhancements have been made to the IRI Atlas. Following are the salient points: . 1. Previously, the tracks were crude with many straight line segments. Only on clicking on the individual tracks, it would assume a finer form. Now, the tracks are refined even on the overview...
  • Entry# 914135
    Nov 22 2013 (09:32PM)


    -@all: There's been this recent concern raised by many about the so-called "race blogs", and how they are congesting the Forum. As per our long-standing policy, members are allowed to blog freely, so long as their posts are not offensive or of a repetitive spam nature. . Accordingly, the following changes are being...
Scroll to Top
Scroll to Bottom