Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri May 26, 2017 13:23:39 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri May 26, 2017 13:23:39 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by tigerkir
Page#    24 Blog Entries  next>>
TRIP HAS ENDED.
Blog  Time-Table

5 posts - Fri Aug 05, 2016 - are hidden. Click to open.

  
3806 views
Aug 05 2016 (17:37)
tigerkir   21 blog posts   11 correct pred (39% accurate)
Re# 1944115-6            Tags   Past Edits
at PTB/Pattambi
Pattambi

  
3660 views
Aug 05 2016 (18:33)
tigerkir   21 blog posts   11 correct pred (39% accurate)
Re# 1944115-7            Tags   Past Edits
at TCR/Thrissur (Trichur)
Reached Trichur

  
3645 views
Aug 05 2016 (18:43)
tigerkir   21 blog posts   11 correct pred (39% accurate)
Re# 1944115-8            Tags   Past Edits
at OLR/Ollur
Ollur

  
3630 views
Aug 05 2016 (19:01)
tigerkir   21 blog posts   11 correct pred (39% accurate)
Re# 1944115-9            Tags   Past Edits
at IJK/Irinjalakkuda
Irinjalajjuda

  
Aug 05 2016 (19:11)
tigerkir   21 blog posts   11 correct pred (39% accurate)
Re# 1944115-10            Tags   Past Edits
at CKI/Chalakkudy
Chalakkudi
TRIP HAS ENDED.
Blog  Time-Table

  
3137 views
Aug 05 2016 (14:54)
tigerkir   21 blog posts   11 correct pred (39% accurate)
Re# 1952602-1            Tags   Past Edits

  
3109 views
Aug 05 2016 (15:08)
tigerkir   21 blog posts   11 correct pred (39% accurate)
Re# 1952602-2            Tags   Past Edits

  
3083 views
Aug 05 2016 (15:17)
tigerkir   21 blog posts   11 correct pred (39% accurate)
Re# 1952602-3            Tags   Past Edits
TRIP HAS ENDED.
Blog  Time-Table

  
4033 views
Jul 29 2016 (18:47)
tigerkir   21 blog posts   11 correct pred (39% accurate)
Re# 1945343-1            Tags   Past Edits
വടകര

  
3718 views
Jul 30 2016 (06:43)
tigerkir   21 blog posts   11 correct pred (39% accurate)
Re# 1945343-2            Tags   Past Edits
TRIP HAS ENDED.
  
Rail News
0 Followers
1557 views
New Facilities/TechnologySR/Southern  -  
Mar 17 2016 (07:48)   Electric Train വൈദ്യുത തീവണ്ടി പരീക്ഷണഓട്ടം വിജയം; ഈ മാസം ഓടിത്തുടങ്ങിയേക്കും
 

MCPNBR~   400 news posts
Entry# 1770657   News Entry# 261495         Tags   Past Edits
ചെറുവത്തൂര്‍: വൈദ്യുതീകരണം പൂര്‍ത്തിയായ കല്ലായി-ചെറുവത്തൂര്‍ റെയില്‍പ്പാതയിലൂടെ ബുധനാഴ്ച വൈദ്യുത തീവണ്ടി ഓടി. പരീക്ഷണ ഓട്ടം രാവിലെ 9.55-ന് കല്ലായില്‍ നിന്നാണ് ആരംഭിച്ചത്. കണ്ണൂരില്‍ അര മണിക്കൂര്‍ നിര്‍ത്തിയിട്ടു. വൈദ്യുത എന്‍ജിന്‍ ഘടിപ്പിച്ച ടവര്‍ വാഗണ്‍ പരീക്ഷണാടിസ്ഥാനത്തില്‍ 140 കിലോമീറ്റര്‍ ഓടി ഉച്ചയ്ക്ക് 1.40-ന് ചെറുവത്തൂരിലെത്തി. ചെറുവത്തൂരിലേക്ക് ആദ്യമായെത്തിയ വൈദ്യുതതീവണ്ടിയെയും ജീവനക്കാരെയും സ്വീകരിക്കാന്‍ സ്റ്റേഷന്‍ മാസ്റ്റര്‍ ഉള്‍പ്പെടെയുള്ള റെയില്‍വേ ജീവനക്കാരും നാട്ടുകാരും ഒന്നാമത്തെ പ്ലാറ്റ് ഫോമില്‍ എത്തി.
കണ്ണൂര്‍ ഡെപ്യൂട്ടി ചീഫ് ഇലക്ട്രിക്കല്‍ എന്‍ജിനീയര്‍ വി.കെ.മനോഹരന്‍, കോഴിക്കോട് ഡെപ്യൂട്ടി ചീഫ് ഇലക്ട്രിക്കല്‍ എന്‍ജിനീയര്‍ ജോണ്‍സണ്‍, സീനിയര്‍ ഡിവിഷണല്‍ ഇലക്ട്രിക്കല്‍ എന്‍ജിനീയര്‍ ജയകൃഷ്ണന്‍ എന്നിവരുടെ നേതൃത്വത്തിലുള്ള പത്തോളം എന്‍ജിനീയര്‍മാരടങ്ങുന്ന സംഘമാണ് വണ്ടിയിലുണ്ടായിരുന്നത്.
അരമണിക്കൂര്‍ ചെറുവത്തൂരില്‍ നിര്‍ത്തിയിട്ട ടവര്‍ വാഗണ്‍ 2.10-ന് കല്ലായിലേക്ക് തിരിച്ചു. പരീക്ഷണ ഓട്ടം വിജയിച്ച സാഹചര്യത്തില്‍ മാര്‍ച്ച് അവസാനം സുരക്ഷാ കമ്മീഷണര്‍ പാതയില്‍ പരിശോധന നടത്തും. നടപടിക്രമങ്ങള്‍ പൂര്‍ത്തിയായ ഉടന്‍തന്നെ വൈദ്യുത
...
more...
എന്‍ജിന്‍ ഘടിപ്പിച്ച പാസഞ്ചര്‍ വണ്ടികളുടെ സര്‍വീസ് ഷൊറണൂര്‍ മുതല്‍ ചെറുവത്തൂര്‍വരെ തുടങ്ങുമെന്ന് റെയില്‍വേ അധികൃതര്‍ അറിയിച്ചു.

2 posts are hidden.

  
2231 views
Mar 18 2016 (10:16)
tigerkir   21 blog posts   11 correct pred (39% accurate)
Re# 1770657-3            Tags   Past Edits
Cheruvathoor: Kallai-Cheruvathoor line electrification was completed, the electric test train ran on Wednesday. The test run was started in the morning at 9.55 from Kallai. At Kannur the train stopped for half an hour. The tower wagon connected to the electrical testing engine ran 140 kilometers and reached Cheruvathoor at 1.40 pm. The railway station master and crew, came to the first platform at Cheruvathoor to receive the first electric test train.
The train stopped for half an hour and made its way back to Kallai at 2.10. The test run was successful and security commissioner will check the route at the end of March. Railway officials said the passenger trains will begin the service to Cheruvathoor after the Security
...
more...
commissioner approved the electrification has been be completed.
  
General Travel
0 Followers
1586 views
May 22 2015 (08:41)   56665/Kasaragod - Byndoor Mookambika Road Passenger (UnReserved)
 

tigerkir   21 blog posts   11 correct pred (39% accurate)
Entry# 1479492            Tags   Past Edits
Train started its service from Kannur today morning 04:15

  
896 views
May 22 2015 (09:17)
MCPNBR~   2062 blog posts   101 correct pred (88% accurate)
Re# 1479492-1            Tags   Past Edits
What time it left from Cannanore? Not seen any news. What is the time table?

2 posts are hidden.

  
1263 views
May 23 2015 (13:35)
MCPNBR~   2062 blog posts   101 correct pred (88% accurate)
Re# 1479492-4            Tags   Past Edits
The inaugural picture - Manorama.
click here
  
Predictions: 53
confirm: 53
rac: 0
wl: 0
Journey: Fri Apr 10, 2015 @ 18:05
Class: AC 2-tier - 2A   |   Tot Seats: Avbl 15   |   Charting: < 15:30
Travel: CAN/Kannur Main (Cannanore)   to   YPR/Yesvantpur Junction   |   661 km / 661 km
16528/Kannur - Yesvantpur (Via Salem) Express (PT)
Entry# 1399342

Posted by: tigerkir   21 blog posts   11 correct pred (39% accurate)
PNR: 482-xxxxxxx   |   Similar PNRs
Posted Status as of: Mar 17 2015 (15:23)
Passenger 1: Waitlist# 1 (Booking Status: W/L 4,GNWL)
Passenger 2: Waitlist# 2 (Booking Status: W/L 5,GNWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 10 2015 (15:22)
Passenger 1: A1,45 [LB]/Coach Position:4 (Booking Status: W/L 4,GNWL)
Passenger 2: RA1 1/Coach Position:4 (Booking Status: W/L 5,GNWL)
Chart PREPARED

  
2135 views
Apr 10 2015 (15:14)
Indian Railways Railfan~   386 blog posts   18623 correct pred (68% accurate)
Re# 1399342-1            Tags   Past Edits

  
Apr 10 2015 (15:18)
DJ™^~   15470 blog posts   185410 correct pred (77% accurate)
Re# 1399342-2            Tags   Past Edits
  
Predictions: 37
confirm: 29
rac: 5
wl: 3
Journey: Fri Mar 27, 2015 @ 17:55
Class: AC 3-tier - 3A
Travel: CAN/Kannur Main (Cannanore)   to   UD/Udupi   |   196 km / 3151 km
22659/Kochuveli - Dehradun SF Express
Entry# 1389188

Posted by: tigerkir   21 blog posts   11 correct pred (39% accurate)
PNR: 430-xxxxxxx   |   Similar PNRs
Posted Status as of: Mar 07 2015 (16:48)
Passenger 1: Waitlist# 6 (Booking Status: W/L 6,RSWL)
Passenger 2: Waitlist# 7 (Booking Status: W/L 7,RSWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Mar 30 2015 (15:15)
Passenger 1: BE1,3 [UB] (Booking Status: W/L 6,RSWL)
Passenger 2: BE1,4 [LB] (Booking Status: W/L 7,RSWL)
Chart PREPARED

  
2602 views
Mar 24 2015 (01:18)
I Love India   17 blog posts   369 correct pred (77% accurate)
Re# 1389188-1            Tags   Past Edits
its one of the worst train in india.......only 5 sleeper coaches in a long distance journey

  
2390 views
Mar 27 2015 (09:49)
सजन रेडियो बजाईयो जरा*^~   31447 blog posts   69892 correct pred (81% accurate)
Re# 1389188-8            Tags   Past Edits

1 posts are hidden.
  
Predictions: 21
confirm: 19
rac: 0
wl: 2
Journey: Sat Sep 14, 2013 @ 19:05
Class: Sleeper - SL   |   Charting: < 09:30
Travel: CAN/Kannur Main (Cannanore)   to   MMR/Manmad Junction   |   1200 km / 2761 km
12617/Mangala Lakshadweep SF Express
Entry# 845786
 

Posted by: tigerkir   21 blog posts   11 correct pred (39% accurate)
PNR: 445-xxxxxxx   |   Similar PNRs
Posted Status as of: Sep 07 2013 (12:15)
Passenger 1: Waitlist# 29 (Booking Status: W/L 76,PQWL)
Passenger 2: Waitlist# 30 (Booking Status: W/L 77,PQWL)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Sep 14 2013 (09:17)
Passenger 1: S3,33 (Booking Status: W/L 76,OS)
Passenger 2: Waitlist# 7 (Booking Status: W/L 77,PQWL)
Chart PREPARED

  
1598 views
Sep 13 2013 (23:25)
SHRI BANKE BIHARI TRAVELS FIROZABAD^~   1407 blog posts   4252 correct pred (69% accurate)
Re# 845786-1            Tags   Past Edits
os koun sa quota hota h

1 posts are hidden.
TRIP HAS ENDED.
Blog  Time-Table

  
9498 views
Jun 01 2012 (19:53)
tigerkir   21 blog posts   11 correct pred (39% accurate)
Re# 437259-1            Tags   Past Edits
at PAY/Payyanur
Left PAY Payyannur

  
9530 views
Jun 01 2012 (19:54)
Warrier is BACK*^~   6075 blog posts   113 correct pred (51% accurate)
Re# 437259-2            Tags   Past Edits
which is the loco today? ERS WDM3aonly?
  
Predictions: 12
confirm: 3
rac: 0
wl: 9
Journey: Sun Jun 03, 2012 @ 20:40
Class: Sleeper - SL
Travel: BSR/Vasai Road   to   CAN/Kannur Main (Cannanore)   |   1024 km / 2261 km
19260/Bhavnagar - Kochuveli Express
Entry# 439767
 

Posted by: tigerkir   21 blog posts   11 correct pred (39% accurate)
PNR: 830-xxxxxxx   |   Similar PNRs
Posted Status as of: May 30 2012 (14:32)
Passenger 1: Waitlist# 41 (Booking Status: W/L 57,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 03 2012 (17:14)
Passenger 1: Can/Mod (Booking Status: W/L 57,RLGN)
Chart PREPARED
Page#    24 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Jun 5
Trains with ARP 15 Dep on: Sat Jun 10
Trains with ARP 30 Dep on: Sun Jun 25
Trains with ARP 120 Dep on: Sat Sep 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site