Timeline UpdatesTrip UpdatesNews PostsPvt PostsAdmin PostsFollowed PostsChat RequestsBlog PostsPNR Posts

Disclaimer
Search
 
 
Tue May 21, 2013 15:16:16 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsMembersLoginFeedback
Post a Comment/Question/Picture/VideoPost a Comment/Question/Picture/Video    Super Search
Topics:  **new   Filters:

Rail News

New Trains

Site Announcements

  • Entry# 736067
    Apr 27 (09:18PM)


    As already observed by our Admins Jay Shah & Nazeer in prior posts [/blog/post/735925|http://indiarailinfo.com/blog/post/735925] and [/blog/post/735925|http://indiarailinfo.com/blog/post/734351] , the Seat Availability Check, Search and Availability Calendar have now been implemented. The feature is an amalgamation of numerous suggestions put forward by our members/Admins over the past few months. Hearty thanks to...
  • Entry# 731613
    Apr 23 (06:29PM)


    A new class of members called "Forum Monitor" has been introduced. These members will have free rein to Delete Posts, Suspend Members and Archive Blogs. The defining characteristics of these members is: 1. They are a subset of the Admin group. 2. They are NOT active bloggers, and so not emotionally involved. 3....
  • Entry# 716180
    Apr 07 2013 (01:30PM)


    The following modifications are being made in the Forum: . 1. The Opinion box will now show a detailed list of Members who provided the rating. When you click on Great, Thanks, Useful or Agree, a box will open up beneath displaying the names. When you hover over the respective member names,...
  • Entry# 655923
    Jan 30 2013 (10:16AM)


    Further elucidation on UnAnswered and Popular tabs. UnAnswered: Only posts tagged with "Travel Question" within the last 7 days are candidates for the UnAnswered tab. Other general comments may not necessarily deserve a reply. If members miscategorize their genuine questions as something else - Rail/Travel, etc. - they will have to...
  • Entry# 637916
    Jan 11 2013 (08:47AM)


    Members mark your calendars. The first online IRI Quiz Contest will be held on Sunday, Feb 3 @ 8pm IST. Some points: 1. You would need a modern mobile or desktop browser. No Opera Mini. You would need to ensure that you have good internet connectivity. . 2. NO easy questions. 20 medium...
  • Entry# 617169
    Dec 21 2012 (09:38AM)


    As per the suggestion presented [here|http://indiarailinfo.com/blog/post/615661] , a new experimental feature is being introduced today. . At the top of the member profile, you will see a new link "Block Member" (see pic). If you block any member, they will NOT be able to reply within Blog Entries started by you, OR...
Page#    1 blog entries  
0 Followers
2174 views
Dec 17 2011 (1:30PM)   BRC/Vadodara Junction (7)        
  

ɯɐɥᴚɐ   392 blog posts   10785 correct pred (72% accurate)  
Entry# 305554                  
65204746195c1a15ac23b.jpgFirst look of both BRC wap5(30044,30045) at BRC SHED
Source: Flicker
Pic Taken by: Suraj Gangber
Uploaded by: aseem30031
we can see PROUDLY written BRC logo on the side of the Loco. :-D

29 posts are hidden. Click to open.

Dec 18 2011 (12:13PM)        

Guest: 33bcb825   show all posts
Re# 305554-30                  
FOR ALL RAILFAN GUYZZ AND LOCO PILOTS... U MUST READ THIS..
As per the attached document
*#BRC will be homing upto 15 WAP-5s, which is under consideration.
#Also, get ready for KYN WAP-7s, March 2012 onwards.*
*_Some tit-bits from the document:_*
#The new loco link arrangement after Mumbai area goes AC(WR), initially would be,
12951/12952 Rajdhani Express- WAP-7/GZB - end-to-end
12953/12954 August Kranti Rajdhani Express- WAP-5/GZB - end-to-end
12909/12910 Garib Rath Express- WAP-5/GZB - end-to-end
...
Read more...
12955/12956 BCT JP Express- WAP-4/ED - BCT-SWM
12925/12926 Paschim Express- WAP-7/GZB
12583/12584 BL PURI Express- WAP-4/BRC BL-ET
19019/19020 BDTS DDN Express- WAP-4/BRC
19023/19024 Janata Express- WAP-4/BRC
#Requirement after AC conversion is 112 locos
#Coaching loco position of WR at present is,
Type of loco-Population-Available for link
WCAM-1-------46------------41
WCAM-2-------20------------18
WAP-4---------57------------51
WAM-4--------20------------18
Total-----------143----------128
#20 WCAM-1s are completing their codal life by this yearend, and they will be considered for condemnation according to their condition.
#16 WAM-4s have already completed their codal life.
#New WAP-5s may be allotted to WR to meet the requirements of further 12 locos. This will be an alternate shed to home WAP-5s beside GZB.
#WR should utilize existing coaching locos on condotion basis till new locos are received and commissioned.
#8 WAP-4 links will be available by transfer of links as stated above for the 8 trains.
#Transfer of WCAM-2 locos to CR shall be planned after successfully taking over of trains on AC. This include stabilizing of loco links upto BCT and receive of new locos.
#5 pairs of weekly trains on BSR-KYN-PUNE section will be taken over by WCAM-1s after charging in WR, which are currently worked with diesels.
# For CR, WCAM-2 are being planned for 3 trains:
12187/12188 CSTM-JBP Garib Rath Express- CSTM-ET
12111/12112 CSTM-AMI Express- CSTM-AMI
12289/12290 CSTM-NGP Duronto Express- CSTM-NGP
*And, last but not the least, BRC will serve as the 3-phase loco shed homing WAP-5s along with GZB. And, as per need of extensions, the conventional locos will be transferred to another sheds.*
*And Mumbaikars, party time....:) Two 3-phase sheds in a quick span(BRC- WAP-5s and KYN- WAP-7s)...:)*
*******************************************
Copied for Dr.Dhawal Mavani's update in Rajdhani Shatabdi Express Fan Club
*******************************************

6 posts are hidden. Click to open.
Page#    1 blog entries  

Scroll to Top