Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon Aug 5 23:06:55 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Description/Uses/Merits of this ΣChain
SBC/Bangalore City to LJN/Lucknow Xfer @ MAS/Chennai Central Buffer: 02h 30m Connecting Bangalore to Lucknow with 1xfer at Chennai with enough buffer time.

7182/Σ Bangalore to Lucknow via Chennai Link Chain ΣChain


Created: Jul 31 2012 (11:09) by shuk^~

Change Departure Station:
Change Arrival Station:

00
PNR    Forum    Time-Table    Availability    Fare Chart    Trips    Gallery    

ΣChain Blog

Page#    Showing 1 to 5 of 1075 blog entries  next>>
Rail Fanning
25617 views
5

Jul 29 (09:50)   12512/Kochuveli - Gorakhpur Rapti Sagar SF Express (PT) | BV/Babhnan (2 PFs)
kirk781^~   3847 blog posts
Entry# 6139269            Tags  
4 compliments
Great Great Great Great
This also happened nearly two decades ago.We used to go from LJN to home station BV via LJN-BJU Express. That train today has RSA with LJN-JBP Express [though it is not strictly needed given double electrified tracks all along]. But back in the day, it was diesel tracks, much of it single line with a honking WDM-3D/A in tow and worst of all, no RSA. So the rake that used to come, same rake used to reverse from LJN.The turn around time was 2.5 hours but the train used to come terribly late and of course, would need easily ~1 hr for rakes to reverse and more importantly, passengers to board from souce. It didn't help that all trains then coming to NER used to undergo LR at LJN and almost all got higher priority than this crawler.
...
more...

This train often used to depart couple of hours late from source itself and would reach my destination much later in the night. So, what we did was board the Rapti Sagar Express [which doesn't stop at Babhnan], assumed it would over take the GD-GKP passenger somewhere b/w GD and Mankapur and we'll deboard at Mankapur and board the passenger upto our destination 30 kms away. Well, that didn't happen. The Rapti Sagar was slightly late and the passenger wasn't overtaken after Mankapur station had crossed. We OT the passenger and after that had an unscheduled halt ~10 kms before our destination. But of course, Rapti Sagar's next stop was Basti, so we deboarded the train and were then in the middle of two stations at ~2000 hrs. One was "Parsa Tewari", 1 km ahead and other was "Babhan Jyotia", 1 km before. We decided to walk/run with our luggage towards "Babhan Jyotia" since the previous station was newly built and we didn't knew if the passenger will halt there or not. We reached there in ~10 mins or so. Waited a few mins for the passenger and then boarded it. Reached our destination after 20 minutes more.

Translate to English
Translate to Hindi

22116 views
1

Jul 29 (10:32)
kjmwag9hc
kjmwag9hc   846 blog posts
Re# 6139269-1              
Quite an adventure. :D
Translate to English
Translate to Hindi

11639 views
1

Aug 01 (09:43)
kirk781^~   3847 blog posts
Re# 6139269-2              
1 compliments
Useful
It was weird in those days with no double tracks meaning most stations had only 1 main platform and no PF #2 to speak of [and no FOB as well]. I remember another case where Avadh Express was to come at 'Babhnan' . The third , loop line was taken by a goods train. Since it was a single line section, a non stopping train was looped at the FIRST track[main platform] and the train which had the actual stoppage [Avadh Express] came at the middle one. What were the passengers supposed to do? We deboarded on the rail tracks. After waiting for a minute sandwiched b/w two stationery trains, both of them started moving in opposite directions and we were now sandwiched for a minute between 2 MOVING trains, which was worse.
...
more...

The conditions are much better now. With dual platforms, it means the train will always arrive at a proper platform, no matter how bad the station is and there will be a proper FOB to guide you home[ except for at halt stations]. That being said, many people don't bother to use the FOB and would rather still risk the rail tracks in the dead of the night for saving couple of minutes.

Translate to English
Translate to Hindi
General Travel
41059 views
9

Jul 21 (16:39)   12512/Kochuveli - Gorakhpur Rapti Sagar SF Express (PT) | KRLA/Koratla (2 PFs) | RPM/WAP-7/30783
Srikar_lucky^~
Srikar_lucky^~   3181 blog posts
Entry# 6132094            Tags   Past Edits
3 compliments
Great Great Great
PDPL-NZB Route Temporarily Diverted Trains (Part-1)
12512 Kochuveli - Gorakhpur Raptisagar SF Express skipping Korutla
Link :- click here
Please do Watch, Like, Share and Subscribe ЁЯЩПЁЯП╗
Translate to English
Translate to Hindi

More Posts
Rail Fanning
12118 views
1

Jul 17 (19:46)   12640/Brindavan Express | SBC/KSR Bengaluru City Junction (Bangalore) (10 PFs)
Train.ka.diwana^~
Train.ka.diwana^~   2614 blog posts
Entry# 6128157            Tags  
1 compliments
Great
Erode/ED WAP7 30725 with 12640 KSR Bengaluru-MGR Chennai Central/SBC-MAS Brindavan express
Translate to English
Translate to Hindi
0
updating ...
3 wishes
рд╢реБрдн рдпрд╛рддреНрд░рд╛ рд╢реБрдн рдпрд╛рддреНрд░рд╛ Happy Journey
Day 3 Trip 2 : Journey To Thiruvananthapuram after having great darshan of Lord Tirupati Balaji тЬЕтЩея╕П

17 Posts

FmtBlog
12237 views
0

Jul 16 (18:26)
JudgeSahab^~
JudgeSahab^~   39779 blog posts
Re# 6127078-18            Tags  
@KVN: Kavanur   20km/h   30m late
@KVN: Kavanur &20 km/h #12640: Brindavan Express cross
Translate to English
Translate to Hindi

More Posts
Info Update
461404 views
0

Jun 20 (16:41)   20103/Mumbai LTT - Gorakhpur SF Express (Via Kanpur) (PT) | TH/Tinich (2 PFs)
Kumaon_Tiger^~
Kumaon_Tiger^~   40639 blog posts
Entry# 6101088            Tags   Past Edits
Cancelation, Regulation, Short Termination, Diversion of Trains due to pre-non-interlock from 21st to 24th June, 2024 for NMCL Gatishakti siding connectivity work and non-interlock work on 25th and 26th June, 2024 at Tinich station of Lucknow division for upgradation of passenger facilities and operational ease.
Translate to English
Translate to Hindi
Page#    Showing 1 to 5 of 1075 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy