Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon Oct 14 16:56:54 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Description/Uses/Merits of this ΣChain
No Direct Train...Sufficient Buffer Time...Daily Connectivity...

988/Σ Vasco-Nanded ΣChain


Created: Jan 08 2012 (11:26) by Msg_For_Train_Bookings^~

Change Departure Station:
Change Arrival Station:

01
PNR    Forum    Time-Table    Availability    Fare Chart    Trips    Gallery    

ΣChain Blog

Page#    Showing 6 to 10 of 2039 blog entries  <<prev  next>>
General Travel
235268 views
13

★★
Apr 17 2023 (11:30)   12779/Goa Express (PT) | SVM/Sanvordem (Kudchade) (3 PFs)
LHB_for_18047~
LHB_for_18047~   11312 blog posts
Entry# 5696672            Tags   Past Edits
5 compliments
Useful Great Useful Useful Useful
Few updates from my recent trip in 12779 on 13.04.2023.
1. 12779 CC is exactly reversed by SWR except the 2 parcel vans.
2. Spotted 8 brand new LHB coaches consisting of 6 GS and 2 3ACE coaches most probably for Goa express at Kalem.
3. SVM to Kalem FEDL updates Total 10 kms. SVM outers ground works going on at good pace and
...
more...
the bridge outside SVM ready too, ground works at good progress for around 1km, further around 2 kms no works done most probably some land issue, then for around 7kms double line fully laid till Kalem. Regarding electrification the existing line is electrified and on the new line poles are laid. If the work on the middle 2 kms start immediately now the section can be doubled in next 6 months.
4. Kalem to Kulem existing single line already electrified and doubling works have just begun from Kulem railway station.
5. Kulem to Castle Rock no doubling work, but electric poles have been or are being put up at all places except the tunnels.
6. Castle Rock to Tinaighat doubling update: from CLR for around 30% of the section no work but for remaining around 70% ground fully levelled now ballast laying to commence. Electric poles have but put up besides the area levelled for double line. At CLR I think only the mainline is under wires (not fully sure) but other tracks only poles have been put up wiring still left.
7. LD to Kudachi if fully doubled now and Kudachi to Vijaynagar doubling almost done can be commissioned in next 2 to 3 months. could not notice electrification coz of darkness but poles are definitely there entire route could not or did not see the wiring though.
8. Vijaynagar to MRJ doubling going at slower pace compared to Kudachi Vijaynagar. My trip ended at MRJ.

Translate to English
Translate to Hindi

14 Posts

33580 views
0

Apr 18 2023 (13:07)
LHB_for_18047~
LHB_for_18047~   11312 blog posts
Re# 5696672-15              
Only solution is now Railways reduce the WL they allow and strict action on unauthorised pax penalise them and then shift them to GS.
Translate to English
Translate to Hindi

34379 views
0

Apr 18 2023 (13:08)
LHB_for_18047~
LHB_for_18047~   11312 blog posts
Re# 5696672-16              
Those two parcel vans should be replaced with pax coaches.
Translate to English
Translate to Hindi

35290 views
2

Apr 18 2023 (13:13)
Yusuf_Azhar^   52858 blog posts
Re# 5696672-17              
I will say better to start a clone express of every popular train and leave it.

Khel khatam , But no, India needs more Vande Bharat now.
:-(
Translate to English
Translate to Hindi

33291 views
0

Apr 18 2023 (13:24)
LHB_for_18047~
LHB_for_18047~   11312 blog posts
Re# 5696672-18              
I seriously miss the VSG NZM Clone Humsafar ЁЯе▓
Translate to English
Translate to Hindi

1 Posts
General Travel
12140 views
0

Sep 29 (21:34)   12779/Goa Express (PT) | VSG/Vasco-da-Gama (3 PFs)
LHB_for_18047~
LHB_for_18047~   11312 blog posts
Entry# 6204845            Tags  
Two more coaches of 3AC should be added to this train as demand is definitely there for AC travel in this.
CC should be 20 LHB+ 2 LVPH.
Translate to English
Translate to Hindi

11192 views
1

Sep 29 (21:38)
DrSwaroop^~
DrSwaroop^~   111598 blog posts
Re# 6204845-1              
1 compliments
Useful
Restriction on Braganza Ghat. Only 20 LHB is allowed.
Translate to English
Translate to Hindi

9713 views
0

Sep 30 (01:19)
LHB_for_18047~
LHB_for_18047~   11312 blog posts
Re# 6204845-2              
I don't think there are such restrictions before reduction in AC coaches in June SWR had already added two additional GS coaches to this train in May itself and it was running with 20+2 LVPH CC already. Check these
click here

click here
Translate to English
Translate to Hindi
General Travel
15380 views
2

Sep 27 (16:36)   12779/Goa Express (PT) | KOV/Kirloskarvadi (2 PFs)
RailFansnehashish^~   28737 blog posts
Entry# 6202769            Tags   Past Edits
Stoppages Provided of Trains
Karnataka Sampark Kranti Express at Sangli & Goa Express at Kirloskarwadi
Translate to English
Translate to Hindi
General Travel
21877 views
2

Sep 12 (19:35)   12779/Goa Express (PT) | VSG/Vasco-da-Gama (3 PFs)
IRFCAV
IRFCAV   49 blog posts
Entry# 6188187            Tags   Past Edits
1 compliments
Useful
Train No. 12779 Vasco Da Gama - Hazrat Nizamuddin Express journey commencing on 12.09.2024 is diverted via Madgaon, Roha, Panvel, Pune, Daund Chord Line and Manmad stations.
Translate to English
Translate to Hindi

15173 views
0

Sep 12 (19:37)
LHB_for_18047~
LHB_for_18047~   11312 blog posts
Re# 6188187-1              
This monsoon was the worst for Braganza Ghat section too many train cancellations due to landslide or derailments.
Translate to English
Translate to Hindi
Rail News
74850 views
1

IR Affairs
NCR/North Central
Sep 04 (19:33)   Train Services Disrupted Between Agra and Delhi Due to Railway Work

Exynos9611~   21617 news posts
Entry# 6178922         Tags   Past Edits
рдзреНрдпрд╛рди рджреЗрдВ: рдЗрд╕ рд░реВрдЯ рдкрд░ рджрд┐рд▓реНрд▓реА рдХрд╛ рд╕рдлрд░ рд╣реБрдЖ рдореБрд╢реНрдХрд┐рд▓, 52 рдЯреНрд░реЗрдиреЗрдВ рдирд┐рд░рд╕реНрдд... 42 рдХрд╛ рдмрджрд▓рд╛ рд░реВрдЯ; рджреЗрдЦ рд▓реЗрдВ рдкреВрд░рд╛ рдЪрд╛рд░реНрдЯ

Traveling from Agra to Delhi will be difficult for the next few days due to pre-non and non-interlocking work starting at Palwal railway station on Wednesday. This will affect the operation of 118 passenger trains passing through the Agra division, including the Gatiman, Shatabdi, and Taj Express trains. These trains will...
more...
be cancelled. The Chhatrapati Shivaji Maharaj Terminus-Firozpur Punjab Mail (up and down) will operate on a changed route via Mathura-Alwar-Rewari-Asthal Bohar from September 5 to September 16.

Agra se Delhi ka safar aage aane waale kuchh dino tak aasaan nahin hoga. Budhvaar se Palwal railway station pe pre-non aur non-interlocking ka kaam shuru ho raha hai. Isse Agra mandale se hoke guzarne waali 118 yaatri trains ka chalana prabhavit hoga. Gatiman, Shatabdi aur Taj Express jaisi trains nirst...
more...
ho jayengi. Chhatrapati Shivaji Maharaj Terminus-Firozpur Punjab Mail (up aur down) apne shuruati station se 5 September se 16 September tak badla hua route via Mathura-Alwar-Rewari-Asthal Bohar se chalengi.
Page#    Showing 6 to 10 of 2039 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy