Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  

Mandovi Express - the best 5-Star Restaurant in the world

Full Site Search
  Full Site Search  
 
Fri Oct 30 07:27:51 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Topics
Gallery
News
FAQ
Trips/Spottings
Login
Advanced Search

BIJR/Bijoor (2 PFs)
ಬಿಜೂರು     बिजूर

Track: Single Electric-Line

Show ALL Trains
Tel. 08254-256461, Uppunda - Bijoor, Udupi Dist
State: Karnataka

Elevation: 9 m above sea level
Zone: KR/Konkan   Division: Karwar

No Recent News for BIJR/Bijoor
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 6
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 3.9/5 (8 votes)
cleanliness - excellent (1)
porters/escalators - average (1)
food - average (1)
transportation - good (1)
lodging - good (1)
railfanning - excellent (1)
sightseeing - excellent (1)
safety - good (1)
Show ALL Trains

Station Forum

Page#    Showing 1 to 5 of 37 blog entries  next>>
Rail Fanning
66133 views
Aug 24 (20:10)   12134/Mangaluru Jn. - Mumbai CSMT SF Express (PT) | MAJN/Mangaluru Junction (Mangalore) (3 PFs) | KYN/WDG-3A/13360
LHB for TN Express
AV12621~   1322 blog posts
Entry# 4695027            Tags   Past Edits
In Feb 2019, my Friend Anirudh & I went on a trip; a part of which was this Journey from Mangaluru to Mumbai by the 12134 Mangaluru - Mumbai CSMT SF Express. Initially this train wasn't there in the plan at all. But after many changes; we finally decided that we had to reach Mumbai early in the morning to explore some local train routes that we hadn't seen till then. Two of them were - Mumbai CSMT Panvel & Panvel Thane routes. It all began well enough, as against the late departures of all the days preceding this journey, our train left Mangaluru on time and in spite of delays at intermediate stations; we managed to reach Panvel on time.
...
more...

Panvel Jn. → Now, that is where everything went wrong. If train was anywhere close to on time, we would have made it to Mumbai CSMT by 5, bought tickets and went our way. But no; our train didn't budge from pf-7 of Mumbai CSMT till 04:15, it stayed there for a good 1.5 hrs and still didn't make it to Mumbai CSMT before us. We were on local trains, mind you. Why? What happened?

Enjoy the Journey compilation and watch out for the explanation towards the end. Do let me know how you felt about our comical misadventures. 😄

A Journey that didn't complete as intended
12134 Mangaluru - Mumbai SF (Mangaluru Jn. - Panvel Jn.)

Link - click here
General Travel
★★★
Mar 12 (15:30)   BIJR/Bijoor (2 PFs)
Rohan
rohanpaul^~   2333 blog posts
Entry# 4590549            Tags   Past Edits
Inspection of newly Electrified section between Thokur & Bijoor station of Konkan Railway done by Shri A K. Jain, CRS/Central Circle along with Shri Sanjay Gupta, CMD/KRCL and other Officials.#electrification
💥RPM 30319 WAP7 Used for CRS Inspection
Video:VS-Konkan Railway
KRCL Twitter:click here

3839 views
Mar 12 (16:02)
Hala Madrid 🇪🇸
promethsuresh^~   2832 blog posts
Re# 4590549-2            Tags   Past Edits
#Atlasmonitors kindly update the same

2633 views
Mar 12 (19:16)
BWN RF
Soumik_BWN^~   4912 blog posts
Re# 4590549-4            Tags   Past Edits
Great that CRS inspection done today....Electric loco now soon in this route😍😍

2653 views
Mar 12 (20:54)
Rohan
rohanpaul^~   2333 blog posts
Re# 4590549-5            Tags   Past Edits
Yess

2400 views
Mar 13 (08:08)
Guest: 74ce17d0   show all posts
Re# 4590549-6            Tags   Past Edits
Grt to see that this beautiful route will be free from carbon emission led by numerous diesel engines ..

2606 views
Mar 13 (08:33)
knkprasad956
krishnaprasad^~   2859 blog posts
Re# 4590549-7            Tags   Past Edits
Thanks for the update
General Travel
Jan 27 (21:56)   70105/Madgaon - Mangaluru Central DEMU | UD/Udupi (2 PFs)
Deepak ulli^~   2918 blog posts
Entry# 4551036            Tags   Past Edits
Madgaon - Mangalore Electrification update:
1.BTN Madgaon - Gokarna RdWork not started.
2.BTN Gokarna Rd - kumta Only OHE foundation holes can be seen at few places
3. Kumta - Murudeshwar OHE poles are fixed but wiring not yet started.
4.
...
more...
Murudeshwara to Bijoor RE completed waiting for CRS inspection I think
5. Bijoor -majn RE CRS INSPECTION completed recently . .
some of TSS i have seen at Murudeshwara,Barkur &other stations..

11082 views
Jan 28 (14:52)
PEEYUSH29129   686 blog posts
Re# 4551036-2            Tags   Past Edits
Whats the status of ROHA-Madgaon ?
Pic Upload
3383 views
Jan 28 (12:53)   BIJR/Bijoor (2 PFs)
Deepak ulli^~   2918 blog posts
Entry# 4551446            Tags   Past Edits
Small Sb pic
General Travel
8301 views
Jan 13 (19:17)   BIJR/Bijoor (2 PFs)
Senthil   1850 blog posts
Entry# 4539237            Tags   Past Edits
KR - Electric Loco trial
Thokur to Bijoor
click here
Page#    Showing 1 to 5 of 37 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy