Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Jul 23, 2017 12:31:46 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Jul 23, 2017 12:31:46 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 1683779-0
Details Edit
Large Station Board;
Entry# 2106479-0
Details Edit
Large Station Board;
Entry# 2107864-0

CRJ/Chittaranjan (3 PFs)
চিত্তরঞ্জন     चित्तरंजन

Track: Double Electric-Line

Jamtara-Chittaranjan Road, Mihijam Pin: 815354 , Dist - Jamtara
State: Jharkhand

Elevation: 182 m above sea level
Zone: ER/Eastern   Division: Asansol
No Recent News for CRJ/Chittaranjan
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 3
Number of Halting Trains: 104
Number of Originating Trains: 0
Number of Terminating Trains: 0
Rating: 4.2/5 (71 votes)
cleanliness - good (9)
porters/escalators - average (9)
food - good (9)
transportation - excellent (9)
lodging - good (8)
railfanning - excellent (9)
sightseeing - excellent (9)
safety - excellent (9)

Nearby Stations

RNPR/Rupnarayanpur 5 km     BM/Bodma 5 km     SLS/Salanpur 12 km     JMT/Jamtara 14 km     STN/Sitarampur Junction 17 km     ULT/Kulti 19 km     BCQ/Barachak Junction 21 km     KEE/Kaseetar Halt 22 km     BRR/Barakar 22 km     CCR/Chinchuria 25 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 209 blog entries  next>>
  
★★★  Info Update
Jan 27 2015 (18:42)   CRJ/Chittaranjan (3 PFs) | KYN/WAG-9/31364
 

MAA DURGA   5897 blog posts   4979 correct pred (62% accurate)
Entry# 1353010            Tags   Past Edits
#railwayengineering
THIS BLOG IS BEING UPDATED IN EVERY MONTH AND WILL ALSO BE UPDATED IN FUTURE IN THIS MANNER so long the "Ongoing Project of 3 Phase Ac Locomotives" carried On by Center for Design and Development(C-D&D) of Chittaranjan Locomotive works in Future. (Project Updates from Jan 2015 to Sept 2015 and Targets of Oct 2015 has been shared so far in the Replies of this BLOG )
------- Some important facts taken from the Official Website of Chittaranjan Locomotive Works regarding the "Ongoing Project of 3 Phase Ac Locomotives" carried On
...
more...
by Center for Design and Development(C-D&D) of Chittaranjan Locomotive works --------
************Progress of Ongoing Projects regarding 3 Phase AC Electric Locomotives carried on by C-D&D of CLW**********
Achievements in the month of December 2014
1. 1st WAP-5 locomotive 30082 fitted with IGBT based
Traction converter, Auxiliary converter and TCN VCU of M/s. BHEL and dispatched to ELS/BRC.
2. Commissioning of 2nd set of IGBT based Propulsion system of M/s Medha completed on Loco No. 31549.
3. 1st WAG 9H locomotive 31563 with Prototype unit of IGBT based Auxiliary converter of M/s HIRECT and dispatched to ELS/GMO.
4. Field trial of M/s. Medha make Hotel Load Converter fitted in loco no. 30375 (WAP-7) completed successfully on NDLS-Kalka Shatabdi alongwith RDSO representatives.
5. IGBT based Traction converters & Auxiliary Converter provided on 13 locomotives & 14 locomotives respectively during Dec.’14 at CLW.

Targets for the month of January 2015
1. Commissioning of Hotel load converter supplied by M/s Siemens on Loco No. 30406.
2. Commissioning of Hotel load converter supplied by M/s BHEL on Loco No. 30426.
3. Commissioning of 3rd & 4th set of IGBT based Propulsion systems supplied by M/s Medha on Loco No. 31557 and 31559.
4. Finalisation of new software version for WAG9/WAP7 locomotives incorporating driver display, VCU redundancy and other reliability improvement features.
5. STRs of Auxiliary Converter, VCU & Transformer for 3-Ph locomotives to be finalized after receipt of comments from RDSO.
6. Finalisation of specification for IGBT based Traction, Auxiliary converter and VCU.
For more details of the progress of this project please visit: click here
A total number of 191(One Hunderd Ninety One)IGBT Loco turned out from CLW during the period (01.04.2012 to 31.12.2014). For all the details of these 191 3 Phase AC Electric Locomotives( Like: Serial Number, Type of the Loco, CLW No of Each Loco, Loco No of each loco,Rail Zone where allotted, Sheds where allotted, Despatch date of each loco from CLW etc) please visit the following link:
click here
Only 4 IGBT Locos are despatched from CLW prior to 01.04.2012. For details of these 4 Locos(Like: Serial Number, Type of the Loco, CLW No of Each Loco, Loco No of each loco,Rail Zone where allotted, Sheds where allotted, Despatch date of each loco from CLW etc) please visit the following link:
click here
Attached Image:
1 AJNI WAP 7 30315(CLW NO of this loco: TPP-115 Despatch Date from CLW: 30.06.12)
Source: click here
IGBT Loco Issues:
As IGBT Traction Converters used in 3 Phasers are built by three firms namely ABB, BHEL and BTIL and assembled by CLW in the 3 Phase Locomotives so the issues have been addressed to the specific firm whose "IGBT Traction Converter" is being installed in the Loco.Please see the three attached "Excel Spreadsheets" to know about the Issues regarding IGBT Locomotives(3 Phaser specially WAP7,WAG 9, WAG 9H & WAG 9i). You can see the "Comment of RDSO" against "Each Issue" addressed to "ABB"in the last column of first Excel Spreadsheet and in other two excel spreadsheets you can see the "status of the issue" and "Firm's Comment about the issue" in the last column of the Excel Spreadsheet .
Attached Excel Worksheets:
3 IGBT LOCO ISSUES WITH ABB.xls(Extracted from the Official Website of CLW)
4 IGBT LOCO ISSUES WITH BHEL.xls(Extracted from the Official Website of CLW)
5 IGBT LOCO ISSUES WITH BTIL.xls(Extracted from the Official Website of CLW)
*** Please download the "Excel Spreadsheets" for seeing the issues of IGBT Locos.
This is "A Compact Information" about 3 Phase Locos(Specially: WAP 7, WAG 9, WAG 9H & WAG 9I) presented here from the Official Website of CLW.
Thanks

1 posts - Jan 2015

1 posts - Feb 2015

1 posts - Mar 2015

1 posts - Apr 2015

1 posts - May 2015

1 posts - Jun 2015

1 posts - Jul 2015

1 posts - Aug 2015

2 posts - Sep 2015

33 posts - Oct 2015

5 posts - Nov 2015

1 posts - Dec 2015

  
Jan 07 2016 (00:23)
MAA DURGA   5897 blog posts   4979 correct pred (62% accurate)
Re# 1353010-74            Tags   Past Edits
Position of Ongoing Project regarding 3 Phase AC Electric Locomotives carried on by C-D&D of CLW(Chittaranjan Locomotive Works)
In the last reply I described the Achievements in the month of November 2015 and Targets for the month of December 2015. In this reply I will describe the Achievements in the month of December 2015 and Targets set for the month of January 2016 :
chievements in the month of December’15
1.
...
more...
1st Loco No. 30445 fitted with dual hotel windings alongwith Hotel load converter of M/s Siemens dispatched to ELS/GZB in Dec’15.
2. Successful implementation of feeding arrangement of double hotel load windings through single hotel load contactor, thereby, leading to direct saving of about Rs. 8 lacs per loco.
3. Agreement signed for Transfer of Technology of TCN compliant vehicle control system with CGL and C-DAC.
4. IGBT propulsion system of M/s Medha commissioned on Loco Nos. 30441, 31652, 31654 & 31671 in Dec’15.
Targets for the month of January’16

1. Uploading of EOI for development of Alternate Gear Drive System for WAP-5 locomotives.
2. Commissioning of 3rd set of Alternate Drive Gear Arrangement for 160 Kmph supplied by M/s Henschel/Germany commissioned on Loco no. 30090.
3. Commissioning of Hotel load converters supplied by M/s Siemens on Loco No. 30453, 30454 & 30455 alongwith 7775kVA double winding transformers.
4. Prototype inspection of DPWCS for AC tap changer locos developed by M/s Medha.
5. STR of IGBT based Traction Converter for 3-Ph locomotives to be finalized after incorporating comments from RDSO.
6. Finalisation of revision of specifications of Traction and Aux. Converter as per RDSO suggestions.
7. Complete redundancy of one more WAP-7 locomotive 30451.
8. Release of software modified for incorporation of fail safe mode in Master Controller after field validation.
For more details :click here
Image Link: click here

  
Feb 02 2016 (15:25)
MAA DURGA   5897 blog posts   4979 correct pred (62% accurate)
Re# 1353010-77            Tags   Past Edits
******** More & More 3-Phase Locos are Fitted with Hotel Load Converters(HOG System) *******
Position of Ongoing Project regarding 3 Phase AC Electric Locomotives carried on by C-D&D of CLW(Chittaranjan Locomotive Works)
In the last reply I described the Achievements in the month of December 2015 and Targets for the month of January 2016 . In this reply I will describe the Achievements in the month of January 2016 and Targets set for the month of February 2016:
Achievements
...
more...
in the month of January’16
1. Expression of interest (EOI) for development of Alternate Gear Drive System for WAP-5 locomotives uploaded on CLW website.
2. 3rd set of Alternate Drive Gear Arrangement for 160 Kmph supplied, by M/s Henschel/Germany, commissioned on Loco no. 30090. Loco sent to ELS/BRCY.
3. Prototype inspection of DPWCS for AC tap changer locos, developed by M/s Medha, carried out by CLW/RDSO from 11.01.2016 to 19.01.2016.
4. 2nd loco No. 30446 fitted with dual hotel windings alongwith Hotel load converter of M/s Siemens dispatched to ELS/GZB in Jan’16.
5. IGBT propulsion system of M/s Medha commissioned on Loco Nos. 31646, 31653, 31718, 30448, 30450 & 31672 in Jan’16.
Targets for the month of February’16
1. Commissioning of Hotel load converters supplied by M/s Siemens on Loco No. 30453, 30454 & 30455 alongwith 7775kVA double winding transformers.
2. 4th set of Alternate Drive Gear Arrangement for 160 Kmph supplied by M/s Henschel/Germany to be commissioned on Loco no. 30100.
3. Capacity-cum-Capability assessment of M/s ARC/Bangalore and M/s Trolex/Bangalore for the development of TCN compliant vehicle control system to be carried out by CLW/RDSO.
4. STR of IGBT based Traction Converter for 3-Ph locomotives to be finalized after incorporating comments from RDSO.
5. Finalisation of revision of specifications of Traction and Aux. Converter as per RDSO suggestions.
6. Complete redundancy of one more WAP-7 locomotive 30451.
7. Release of software modified for incorporation of fail safe mode in Master Controller after field validation.
Source : click here
Image Link : click here
So, Loco Number 30446 is now have HOG Facility(In Jan 2016) and in this Month Loco Nos 30423,30454 & 30455 will be fitted with HOG Facility with 7775kVA double winding transformers. It's a really good news that HOG Facility is now fitted in 3-Phase Locos so in Future demand of EOG will be decreased.

  
1748 views
Feb 02 2016 (16:16)
❤️ ⚡ WAP5™ ⚡ ❤️   6738 blog posts   278 correct pred (91% accurate)
Re# 1353010-78            Tags   Past Edits
"4th set of Alternate Drive Gear Arrangement for 160 Kmph supplied by M/s Henschel/Germany to be commissioned on Loco no. 30100."
That's WAP5 #101 for you :D. Waiting for its numbers to cross 100...

  
1862 views
Mar 04 2016 (22:10)
MAA DURGA   5897 blog posts   4979 correct pred (62% accurate)
Re# 1353010-79            Tags   Past Edits
******* Conference for Development of Dual Mode Locomotive will be held at CLW on 19.03.2016 ********
Position of Ongoing Project regarding 3 Phase AC Electric Locomotives carried on by C-D&D of CLW(Chittaranjan Locomotive Works)
In the last reply I described the Achievements in the month of January 2016 and Targets for the month of February 2016 . In this reply I will describe the Achievements in the month of February 2016 and Targets set for the month of March 2016:
Achievements
...
more...
in the month of February’16
1. Preparation of detailed specification and floating of Expression of Interest (EOI) for development of Dual Mode Locomotive on CLW website.
2. Incorporation and validation of complete redundancy of VCU processors with additional I/O cards on WAP-7 locomotive No. 30451.
3. 3rd loco No. 30454 fitted with dual hotel windings alongwith Hotel load converter of M/s Siemens dispatched to ELS/GZB in Feb’16.
4. Software modification for incorporation of fail safe mode in Master Controller implemented in WAP-7 locomotive No. 30451. Regular cut-in after successful field validation.
5. IGBT propulsion system of M/s Medha commissioned on Loco Nos. 30452, 31720, 30098, 31696, 31694 and 31747 in Feb’16.
Targets for the month of March’16
1. Commissioning of Hotel load converters supplied by M/s Siemens on Loco No. 30453, 30455, 30457, 30458, 30468, 30469 and 30471 alongwith 7775kVA double winding transformers.
2. 4th set of Alternate Drive Gear Arrangement for 160 Kmph supplied by M/s Henschel/Germany commissioned on Loco no. 30100.
3. Evaluation/Scrutiny of offers against Expression of interest (EOI) for the development of Alternate Gear Drive System for WAP-5 locomotives.
4. A pre-application conference to be conducted on 19.03.2016 at CLW with different firms for the development of Dual Mode Locomotive.
5. STR of IGBT based Traction Converter for 3-Ph locomotives to be finalized after incorporating comments from RDSO.
6. Finalisation of revision of specifications of Traction and Aux. Converter as per RDSO suggestions.
For more details please refer : click here

  
1717 views
Mar 04 2016 (23:58)
Aditya Immortal ™ ©~   3134 blog posts   186 correct pred (54% accurate)
Re# 1353010-80            Tags   Past Edits
Nice..
  
Poll
1 Followers
6181 views
64 votes
Jun 13 2017 (08:50)   13403/Vananchal Express | DHN/Dhanbad Junction (8 PFs)

May i have your attention plzz~   876 blog posts   3 correct pred (100% accurate)
Entry# 2318079            Tags   Past Edits
1 compliments
I'm following
Recently due to closure of DHN CRP route, a lot of trains has been cancelled, which train do u think would have the most adverse effect on passenger and hence should be restored as soon as possible
13403/04 Vananchal exp38%24
13425/26 MLDT ST Exp (via RNC)13%8
18603/04 RNC BGP Exp (via Kiul)3%2
18605/06 RNC JYG Exp0%0
18627/28 HWH RNC Intercity Exp (via ASN)2%1
18629/30 RNC NJP Exp (via BJU)2%1
12831/32 BBS DHN Garib Rath Exp5%3
13025/26 HWH BPL Exp16%10
15661/62 RNC KYQ Exp (via DGR)2%1
17005/06 HYB RXL Exp11%7
17007/08 SC DBG Exp3%2
19413/14 KOAA ADI Exp (via BRKA)2%1
19607/08 KOAA AII Exp (via BRKA)3%2
58013/14 HWH BKSC Passenger (via ADRA)2%1
53335/36 DHN RNC Passenger2%1
53339/40 DHN CRP Passenger0%0
53341/42 DHN MURI Passenger0%0
68019/20 Jhargram DHN MEMU0%0
68079/80 CRP BJE MEMU0%0

7 posts - Tue Jun 13, 2017

12 posts - Wed Jun 14, 2017

5 posts - Thu Jun 15, 2017

  
4512 views
Jun 15 2017 (18:33)
Sunil Kumar Bhardwaj   5158 blog posts   5030 correct pred (76% accurate)
Re# 2318079-29            Tags   Past Edits
Those trains will run via BKSC after stopping trains on ADRA-GMO section.

  
4454 views
Jun 15 2017 (18:37)
RF19 GOAT   658 blog posts   6 correct pred (52% accurate)
Re# 2318079-30            Tags   Past Edits
Lekin OSK will skip bokaro..

  
4449 views
Jun 15 2017 (20:28)
Sunil Kumar Bhardwaj   5158 blog posts   5030 correct pred (76% accurate)
Re# 2318079-31            Tags   Past Edits
* It will not matter as we have Jharkhand Sampark Kranti in that slot.
* Moreover, Bokaro-Delhi is well connected with trains. So, one OSK will nor be a big deal.
* HLZ-ANVT and SRC-ANVT will be better.

  
4137 views
Jun 16 2017 (16:53)
jamesss143   148 blog posts
Re# 2318079-32            Tags   Past Edits
IR can run kolkata-ajmer/ahmedabad and hwh- bpl via asn-joc-bksc(loco rev) then phusro - barkakana.. so that bksc will get more train to serve..

  
4033 views
Jun 16 2017 (21:46)
RF19 GOAT   658 blog posts   6 correct pred (52% accurate)
Re# 2318079-33            Tags   Past Edits
Kaash!
  
★  General Travel
0 Followers
2107 views
Apr 05 2017 (23:16)   15271/Howrah - Muzaffarpur JanSadharan Express (UnReserved) | CRJ/Chittaranjan (3 PFs)

LHBfy Himgiri SF~   702 blog posts   23 correct pred (69% accurate)
Entry# 2224062            Tags   Past Edits
15271 ready to go ahead..after scheduled stop at CRJ
  
General Travel
0 Followers
953 views
Mar 25 2017 (10:39)   CRJ/Chittaranjan (3 PFs)

LHBfy Himgiri SF~   702 blog posts   23 correct pred (69% accurate)
Entry# 2210113            Tags   Past Edits
Water dispenser installed at CRJ
  
★  General Travel
0 Followers
4943 views
Jun 12 2017 (19:17)   13351/Dhanbad - Alappuzha Express (PT) | DHN/Dhanbad Junction (8 PFs)

Sunil Kumar Bhardwaj   5158 blog posts   5030 correct pred (76% accurate)
Entry# 2317660            Tags   Past Edits
1 compliments
A very big chunk of pop on loss
The final list by MOR arrived. Biggest blow to DHN and BKSC.
* Cancellation of 13 Mail/Express trains.
* No trains via PRR-ASN
* Only 4 trains via GMO-DHN
* BKSC to suffer heavily because
...
more...
if DHN-CRP section.
* BKSC's overnight connection with HWH lost.
* Connection with Bhagalpur, Gujarat, Hyderbad , Guwahati, lost.

18 posts - Mon Jun 12, 2017

  
4708 views
Jun 12 2017 (19:52)
Sunil Kumar Bhardwaj   5158 blog posts   5030 correct pred (76% accurate)
Re# 2317660-19            Tags   Past Edits
Only the elite class will afford it and those who want to arrive Kolkata in morning have no option left. Now bus will be only option.

  
4704 views
Jun 12 2017 (19:55)
Sunil Kumar Bhardwaj   5158 blog posts   5030 correct pred (76% accurate)
Re# 2317660-20            Tags   Past Edits
Ye sab ECR ka plan hai, saaf dikh raha. Newspaper ki ek news sahi hui jo 4 trains ECR ne maang liya that MOR se. Ye 4 daily trains aur most heavy weight trains hai jinme bahut crowd hota hai. Baaki 58013/14 BKSC-HWH Passenger ko cancel krne ka proposal ECR ne kaise bhej diya ?
Uske cancellation ka decision wapas lena hoga MOR ko warna yaha bahut protest hoga.

  
4683 views
Jun 12 2017 (20:01)
Ideologies Matters More~   617 blog posts
Re# 2317660-21            Tags   Past Edits
58013/4 k bare me mujhe bhi kuch samajh m Nehi a Raha.. MOR ka khud ka Kiya Dhara hoga shayad yet itna bekar decision kaise le Sakta hai

  
4666 views
Jun 12 2017 (20:19)
Sunil Kumar Bhardwaj   5158 blog posts   5030 correct pred (76% accurate)
Re# 2317660-22            Tags   Past Edits
DHN ko loss hua but BKSC ko heavy loss hua wo bhi DHN ki wajah se. BBS-DHN Garib Rath cancel kyu ki , wo to pehle BBS=HTE Garib Rath thi, uska extension hua tha aur ye 34 kms k liye jaha halt bhi nahi usko cancel kiya. Ye kaisa decision, ek DHN k wajah se sara BKSC-BBS section wale stations suffer kare, RNC ki Garib Rath bhi chali gayi. Ye MOR ne kuch soch samajh kar decision nahi liya hai.
DHN-CRP k passenger trains cancel karne the to BKSC-RNC k bi kar diye.
Ab
...
more...
to protest hna chahiye aise bekar k decisions k liye.
Ranchi-Dumka Express ko divert kiya , wo kitni important train hai ? Ukso cancel karte to koi kuch kehta bhi nahi but ue DHN-CRP section ki wajah se Malda, North Bihar sab log suffer karenge.

  
4532 views
Jun 12 2017 (21:45)
LHBfy Himgiri SF~   702 blog posts   23 correct pred (69% accurate)
Re# 2317660-23            Tags   Past Edits
yup shyamoli and royal cruiser already running from Bokaro to Kolkata..few more will start
Page#    Showing 1 to 5 of 209 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.