Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Aug 19, 2017 11:30:54 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Aug 19, 2017 11:30:54 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Page#    307282 Blog Entries  next>>
  
Rail News
0 Followers
228 views
IR AffairsNER/North Eastern  -  
Yesterday (21:49)   ट्रेनों की तरह रेलवे की योजनाएं भी लेट, ऐशबाग से सीतापुर के अमान परिवर्तन की गति सबसे तेज

☆गोंडा इलेक्ट्रिक शेङ ■☆*^~   6385 news posts
Entry# 2384039   News Entry# 312195         Tags   Past Edits
मंजूरी होने के बावजूद कई महत्वपूर्ण प्रोजेक्ट की गति सुस्त
- सुलतानपुर से भी सुस्त गति से रायबरेली रूट का दोहरीकरण
जागरण संवाददाता, लखनऊ :
यात्री सुविधाएं बेहतर करने के लिए रेलवे के कई महत्वपूर्ण प्रोजेक्ट ग्रीन सिग्नल मिलने के बावजूद रेंग रहे हैं। आलम यह है कि रेल दोहरीकरण का जो काम सुलतानपुर और रायबरेली रेलखंड पर चल रहा है। उस काम में
...
more...
भी प्राथमिकता सुलतानपुर रेलखंड को दी जा रही है। जबकि रायबरेली रेलखंड के दोहरीकरण की गति बहुत ही धीमी है।
दरअसल रेलवे की निर्माण इकाई के पास चारबाग स्टेशन की यार्ड री-मॉडलिंग, रूट रिले इंटरलाकिंग, मल्हौर में मेमू कार शेड जैसे महत्वपूर्ण प्रोजेक्ट हैं। जबकि आरवीएनएल उतरेटिया से सुलतानपुर होकर वाराणसी, उतरेटिया से रायबरेली रेलखंड के दोहरीकरण और ऐशबाग से सीतापुर का अमान परिवर्तन का काम कर रहा है। इनमें ऐशबाग से सीतापुर के अमान परिवर्तन की गति सबसे तेज है। इस साल अक्टूबर में इस रेलखंड पर ट्रेन संचालन शुरू हो जाएगा। वहीं उतरेटिया से सुलतानपुर के बीच 18 किलोमीटर लंबे रेलखंड का अमान परिवर्तन 15 सितंबर तक पूरा हो जाएगा। जबकि 24 किलोमीटर का काम पूरा करने के लिए डेढ़ महीने का और समय लगेगा। उतरेटिया से ही रायबरेली रेलखंड के दोहरीकरण का काम भी चल रहा है। इस रेलखंड पर काम इतनी धीमी गति से चल रहा है कि रेलवे सुलतानपुर रेलखंड के जिस 24 किमी. के काम को डेढ़ माह में पूरा करेगा। वहीं रायबरेली रेलखंड पर 36 किमी. दोहरीकरण का लक्ष्य सात महीने का रखा गया है। इसी तरह शेष 36 किमी. के काम को पूरा करने के लिए एक साल और लगेंगे।
-----------------
इनकी तारीख भी बीती
चारबाग स्टेशन पर लिफ्ट : यहां प्रथम श्रेणी प्रवेश हाल से पैदल पुल को लिफ्ट से जोड़ा जाना है। जबकि शेष अन्य प्लेटफार्मो के लिए तीन लिफ्ट और चार एस्केलेटर लगाने का लक्ष्य मार्च 2017 तक किया गया था। रेलवे ने अब इसका काम शुरू किया है। प्लेटफार्म चार और पांच पर एस्केलेटर लगाए जा रहे हैं।
यार्ड री-मॉडलिंग : इस प्रोजेक्ट के तहत चारबाग स्टेशन पर दो अतिरिक्त प्लेटफार्म और दो नई रेल लाइन बिछाई जाएगी। इसकी टेंडर प्रक्रिया अक्टूबर 2016 से लंबित है।
रूट रिले इंटरलाकिंग : चारबाग स्टेशन पर ट्रेनों की क्षमता बढ़ाने के लिए रूट रिले इंटरलाकिंग का प्रोजेक्ट पिछले साल मंजूर हुआ था। इस काम को यार्ड री-मॉडलिंग के साथ शुरू किया जाना था। लेकिन अब तक इसकी टेंडर प्रक्रिया ही फाइनल नहीं हो सकी है।
मल्हौर मेमू कार शेड : लखनऊ से कानपुर के बीच चलने वाली मेमू ट्रेनों के रखरखाव के लिए अब तक उनको गाजियाबाद मेमू कार शेड भेजा जाता है। वर्ष 2010 में मल्हौर में मेमू कार शेड बनाने के लिए 80 करोड़ रुपये स्वीकृत हुए थे। अब तक मेमू कार शेड बनाने का काम शुरू नहीं हो सका।
-------------
रेलवे की निर्माण इकाई के पास इस समय बहुत सारे प्रोजेक्ट हैं। यही कारण है कि अब आरवीएनएल और राइट्स को भी रेलवे के महत्वपूर्ण प्रोजेक्ट दिए जा रहे हैं। जल्द ही लंबित प्रोजेक्टों के कार्य में तेजी आएगी।
सतीश कुमार, डीआरएम

  
Manaknagar

  
332 views
Yesterday (23:33)
©shuk™ RAILWAY My 1st crush~   774 blog posts   322 correct pred (56% accurate)
Re# 2384039-2            Tags   Past Edits
Bhai ASH-STP Oct;2017 me possible he nahi hai. Paper wale kuch bhi chap deten hain

  
79 views
Today (10:51)
Abhinav Srivastava   18 blog posts
Re# 2384039-3            Tags   Past Edits
Sahi kaha bhai apne oct 2018 b mujhe mushkil lag raha hai..itna imp track k gc ko itna lambit rakhna sharm ki baat hai rvnl k liye ..

  
24 views
Today (11:23)
©shuk™ RAILWAY My 1st crush~   774 blog posts   322 correct pred (56% accurate)
Re# 2384039-4            Tags   Past Edits
Bhai itni bhi kaya narajgi. Maximum 01-Jan-2018 tak commencement ho gayega. Fir 2018 se electrification chalu hoga.
  
Rail Fanning
0 Followers
34 views
Today (11:18)   12197/Bhopal Gwalior InterCity Express | SUW/Sukhisewaniyan (3 PFs) | JHS/WDG-3A

Simranjeet~   515 blog posts   1201 correct pred (65% accurate)
Entry# 2384362            Tags   Past Edits
Three back to back actions on triple line Stretch!
1) Bhopal Gwalior Intercity Express.
2) Udhyogkarmi Express.
3) Punjab mail.
Watch here :- click here
Subscribe
...
more...
for more :- click here
  
Rail News
0 Followers
357 views
New Facilities/TechnologyNR/Northern  -  
Yesterday (22:55)   Do you want to destroy the Taj Mahal: Supreme Court asks govt

Prakhar*^~   225 news posts
Entry# 2384060   News Entry# 312225         Tags   Past Edits
Supreme Court was hearing an application which has sought its nod to cut around 450 trees there in an around 80 km stretch near Taj Mahal in Agra, on which the additional railway track would be laid between Mathura and Delhi.
.
INDIA Updated: Aug 17, 2017 20:35 IST
Press Trust of India, New Delhi
.
...
more...

The plea has said that in order to clear the bottleneck of train movement, it was necessary to lay down the additional track in the stretch. The court would hear the matter next month.
The plea has said that in order to clear the bottleneck of train movement, it was necessary to lay down the additional track in the stretch. The court would hear the matter next month.(Reuters File Photo)
“Do you want to destroy” the world famous Taj Mahal, the Supreme Court asked the government on Thursday.
.
The scathing remarks by the apex court came during the hearing of an application seeking its nod to cut over 400 trees to lay down an additional railway track between Mathura in Uttar Pradesh to Delhi.
.
“This (Taj Mahal) is a world famous monument and you (government) want to destroy it? Have you seen the recent pictures of Taj? Go to the internet and have a look at it,” a bench comprising Justices Madan B Lokur and Deepak Gupta said.
.
“If you want, then file an affidavit or application and say that the Union of India wants to destroy the Taj,” the bench said.
.
The apex court, which is dealing with a petition filed by environmentalist M C Mehta, has been monitoring development in the area to protect the historic Taj Mahal, built by Mughal emperor Shah Jahan in memory of his wife Mumtaz in 1631 and which is a UNESCO World Heritage Site.
.
The court was hearing an application which has sought its nod to cut around 450 trees there in an around 80 km stretch on which the additional railway track would be laid between Mathura and Delhi.
.
The plea has said that in order to clear the bottleneck of train movement, it was necessary to lay down the additional track in the stretch. The court would hear the matter next month.
.
Mehta, in his PIL, has sought protection of the Taj from the ill effects of polluting gases and deforestation in and around the area.
.
The apex court had earlier passed a slew of directions on the issue of protecting the iconic monument.

21 posts - Yesterday

9 posts - Today

  
339 views
Today (01:35)
Agumbe – World’s only King Cobra Sanctuary~   591 blog posts
Re# 2384060-31            Tags   Past Edits
But somehow many politicians seem to be going strong well past 90 ;)

  
338 views
Today (01:35)
iR railfan~   1973 blog posts   475 correct pred (86% accurate)
Re# 2384060-32            Tags   Past Edits
We have a decline in Total Fertility Rate(average children a woman has in lifetime) from 3.2 in 2000 to 2.2 in 2016.
So continuing with this trend we may attain stagnation and then further decline in population post 2050.

  
323 views
Today (01:56)
©THE DARK LORD™~   394 blog posts
Re# 2384060-33            Tags   Past Edits
China India se 3 guna bada hai, China se tulna kerna wyartha hai. Agar indian government is Intejaar me baithi rahi ki Ageing population kabhi badhegi or Mortality rate Natality rate se jyada hoga tab tak to lanka kag chuki hogi. Hume ye nahi bhulna chahiye ki Economic development k sath life expediency badhegi, buddhe log or jyada jienge. Jindagi nark ban jayegi, Baccha Kindergarten k sath hi IIT or Medical ki coaching lena shuru ker dega. Maa Baap baacho ko Birthday per TMH or resnick halliday walker ki books diya karenge. Log shadio me gift k taur per Bisleri ki 20 lit. Waali bottle denge. Kitna Bhayanak hoga wo sab😨😨

  
307 views
Today (02:13)
iR railfan~   1973 blog posts   475 correct pred (86% accurate)
Re# 2384060-34            Tags   Past Edits
I support the decision of the SC bench and anybody would favour it have they visited TAJ in the recent past. I visited Taj Mahal about a month ago and found work of re-polishing being done to bring back the glamour of old days. The comparison of the polished and unpolished parts made a lot of difference. The government must also ensure to protect these world renowned monuments.

  
0 views
Today (11:30)
Prakhar*^~   4310 blog posts   414 correct pred (81% accurate)
Re# 2384060-35            Tags   Past Edits
Kya topic tha kahan puch gya.
.
Waise suna hai aaj kal trees displace ho jaate hai.
  
★  Rail Fanning
0 Followers
842 views
Yesterday (09:44)   12108/Lucknow Jn. - Mumbai LTT SF Express (PT) | BPL/Bhopal Junction (6 PFs) | CNB/WAP-4/22545

VaRuन⛱   2341 blog posts
Entry# 2383337            Tags   Past Edits
Today's लिंक
CNB/WAP-4/22545

40 posts - Yesterday

4 posts - Today

  
77 views
Today (10:31)
VaRuन⛱   2341 blog posts
Re# 2383337-45            Tags   Past Edits
Apka Wednesday Ka pakka hai?

  
28 views
Today (11:23)
Maddy~   871 blog posts   580 correct pred (78% accurate)
Re# 2383337-46            Tags   Past Edits
Tuesday ko confirm hoga.. I will let u know on tuesday aaj to back to delhi.

  
18 views
Today (11:25)
VaRuन⛱   2341 blog posts
Re# 2383337-47            Tags   Past Edits
Will be in झाँसी soon..

  
9 views
Today (11:28)
Maddy~   871 blog posts   580 correct pred (78% accurate)
Re# 2383337-48            Tags   Past Edits
Shifting to jhansi??

  
0 views
Today (11:30)
VaRuन⛱   2341 blog posts
Re# 2383337-49            Tags   Past Edits
No no,
Just for railfanning session..
Train Status: 16m late
Last Update: 1 km after PNVL/Panvel Junction @ Today (02:41)
Next Station: KKW/Kankavali
Next Halt: KKW/Kankavali


Blog  Time-Table

1 posts - Today - are hidden. Click to open.

  
262 views
Today (02:12)
SUNIT C~   1940 blog posts   202 correct pred (71% accurate)
Re# 2382951-2            Tags   Past Edits
at TPND/Taloje Panchnand
Crossed
WDG4D leading....

  
243 views
Today (02:28)
SUNIT C~   1940 blog posts   202 correct pred (71% accurate)
Re# 2382951-3            Tags   Past Edits
at PNVL/Panvel Junction
Arrived
Dept TNA 20 min late....slack effect...

  
239 views
Today (02:41)
SUNIT C~   1940 blog posts   202 correct pred (71% accurate)
Re# 2382951-4            Tags   Past Edits
1 km after PNVL/Panvel Junction
Left

  
135 views
Today (09:06)
SUNIT C~   1940 blog posts   202 correct pred (71% accurate)
Re# 2382951-5            Tags   Past Edits
Arrived RN

  
72 views
Today (10:41)
⭐ ⭐ ⭐ Telangana Express Oops AP Express ⭐ ⭐ ⭐^~   2599 blog posts   1005 correct pred (65% accurate)
Re# 2382951-6            Tags   Past Edits
शुभ यात्रा
Page#    307282 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Aug 29
Trains with ARP 15 Dep on: Sun Sep 3
Trains with ARP 30 Dep on: Mon Sep 18
Trains with ARP 120 Dep on: Sun Dec 17

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.