Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Aug 17, 2017 09:39:48 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Aug 17, 2017 09:39:48 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Page#    308744 Blog Entries  next>>
0d 5h 15m remaining for Trip Start.
Live logging for this trip will be enabled Today @ 12:55.
Blog  Time-Table
  
General Travel
0 Followers
60 views
Today (08:55)   02913/Bandra Terminus - Patna Humsafar Inaugural Special | BSR/Vasai Road (8 PFs) | BRC/WAP-5/30070

22913 Bandra Patna Humsafar Express*^~   32204 blog posts   70209 correct pred (81% accurate)
Entry# 2382414            Tags   Past Edits
Humsafar Crossing with Two Duronto at Vasai Road Back to Back
.
Newly Inaugurated 02913 Bandra Patna Humsafar Inaugural Special Skipping Vasai road where 2 surprise waiting for us first one 12284 Delhi Nizamuddin Ernakulam Duronto Express Standing on Main Line ie PF 5 of Vasai Road as PF 6 occupied by Panvel Bound memu and 7 by Freight and other one was 22210 New Delhi Mumbai Central Duronto Waiting on Main Line at Vasai Outer normally 22210 Overtakes 12284 Before Surat but that day 22210 running late so no Overtake Happens
12284
...
more...
NZM ERS Duronto Hauled by ERS WDm 3A 14126 and 22210 Hauled by BRC HOG WAP 7 30526
Enjoy uncut video of Hamsafar Skipping Vasai Road and Crossing with 2 Duronto
  
New Delhi, Aug 16: In order to make the rail journey more comfortable and remarkable, Indian Railways has been launching various services and projects. In this direction, Minister of Railways Shri Suresh Prabhakar Prabhu in a programme held today at Rail Bhawan, through video-conferencing launched and dedicated following services to the nation : -
1. Laying of foundation stone for Gaya Byepass (At Gaya, Bihar).
2. Dedication to the Nation- Electrification of Bakhtiarpur-Rajgir Section (at Bakhtiarpur, Bihar).
3.
...
more...
Dedication to the Nation- Electrification of Meralgram-Renukut Section (at Renukut, Jharkhand & UP).
4. Inauguration of following facilities at Bihta Station(Bihar): -
a) Extension of Platforms Nos. 1 & 2 for accommodation of 24 coaches, extension of Platforms shed-4 nos.
b) Provision of benches-12 nos.
c) Provision of water booth-1 no.
d) Improvement of circulating area (south side).
5. Inauguration/Dedication of following facilities at Chhapra(Bihar):
a) Dedication to the Nation - ISS at Chhapra station.
b) Inauguration of works of escalators (02 nos) and
improvements to platforms of Chhapra station.
c) Laying of foundation stone for second entry gate of Chhapra station.
d) Inauguration of Water Vending Machines (02 nos.) at Chhapra.
e) Dedication to the Nation-Wi-fi at Chhapra station.
6. Dedication to the Nation-newly constructed Goods Sheds
and 6 lines station at Chhapra Gramin Station.
7. Dedication to the Nation - Green Corridor in Bhagalpur- Banka section (Bihar) of Malda Division.
Minister of State for Railways Shri Rajen Gohain was specially present to grace the occasion. Chairman, Railway Board, Shri A. K. Mital, other Railway Board Members, several other dignitaries and senior officials were among those present on the occasion.
Speaking on the occasion, Minister of Railways Shri Suresh Prabhakar Prabhu said that the unfortunate floods in Bihar & Assam has caused distress. Indian Railways is extending all possible help to the victims. Inaugurations of various passenger amenities in different parts of Bihar will help the people of Bihar for comfortable journey experience.
SERVICES LAUNCHED : -
1) Laying of Foundation Stone for Gaya Bypass
Benefits:
● Provides Direct Connectivity from 3rd Line between Gaya & Manpur(for movement to Kiul) to Gaya Patna Line.
● Avoids Reversal at Gaya Station and will improve the movement of COAL,STEEL,CEMENT & FOOD GRAINS to Patna.
2) Electrification of Bakhtiarpur-Rajgir
Benefits
•Manpur - Tilaiya - Bakhtiyarpur is a missing link between two electrified corridors of Mughalsarai - Patna - Bakhtiyarpur -Sitarampur - Howrah (Delhi-Howrah main line) and Mughalsarai-Gaya-Dhanbad-Sitarampur-Howrah (Grand Chord).
•The proposed section is a shorter route for transportation of coal to National Thermal Power Corporation's Barh thermal power plant.
•Coal will be fed through this route from Tori-Shivpuri collieries of Central Collieries.
•Apart from Coal, this section also carries Fertilizers, Food Grains, Cement , Salt etc.
'•After electrification of entire section, there will be seamless flow of electric trains in this section as traction changes/detentions at Manpur and Bakhtiyarpur ends would be eliminated.
3) Electrification of Meralgram-Renukut section.
Benefits:
● Garwa Road-Chopan-Singrauli including Karaila Road-Shaktinagar single line section of East Central Railway covering 257 route kilometers passes through the states of Jharkhand and Uttar Pradesh.
● Electrification of Garwa Road-Chopan-Singrauli with a view to ultimately connect Eastern and Central parts of India seamlessly through Garwa Road - Chopan - Singrauli - Katni- Bina - Kota.
● The electrification of the mentioned route of ECR is necessary from strategic perspective for increase in traffic, operational flexibility and better utilization of assets in electrified section.
● Electrification of this route will also avoid traction change at Garwa Road.
4) Inauguration of Passenger Amenities at Bihta Station
● Extension of PF Sheds (4 Nos.).
● Benches (12 Nos.), Water Booth (1 No.).
● Improvement of Circulating Area (South Side).
● Extension of PF Nos. 1 & 2 for accommodation of 24 coaches.
5) Inauguration of Passenger amenities at Chhapra Station
● Foundation stone for second entry gate- Estimated cost for Second Entry Gate is Rs. 24.62 Crores.
● Wi Fi Facility at Chhapra Station- The facility for the visitors & rail users of Chhapra Railway Station is being provided by RailTel in partnership with Google with no cost to Railway for providing high speed state of the art world class internet experience to the commuters. The Railwire wi-fi service is currently available at 127 stations.
● The facility will offer high-speed broadband like experience to users Wi-Fi facility is being provided at A1 & A category Railway station.
● Provision of escalators and modification of platforms at Chhapra station.
● Chhapra station is an 'A-1' category station on Gorakhpur cantt. and Chhapra Katcheri section of Varanasi Division, NER.
● The estimated cost of provision of escalators at Chhapra station is Rs. 7277052/- each escalator (total Rs.7277052X2= Rs. 14554104/-).
6) Inauguration of New Goods Shed at Chhapra Gramin Station
● Chhapra Gramin is a crossing station having 6 running lines. 2 lines are electrified and rest are in progress.
● New goods shed opened from Feb. 16.
● Mainly I/W traffic of cement, fertilizer and food grain. Average 23 rakes per month.
● Good sheds has one full rake replacement capacity, pucca platform, adequate light arrangement and round the clock working.

  
380 views
Today (00:52)
©THE DARK LORD™~   340 blog posts
Re# 2382318-1            Tags   Past Edits
Bihar k sabhi station per passenger amenity imprisonment ki ghoosna ki to SEE or SPJ ko kyu choor diye. unke liye pandit ne alag waqt diya hai kya?

  
6 views
Today (09:35)
BJ~   2385 blog posts
Re# 2382318-2            Tags   Past Edits
SOUNDS NICE. Happy that my Home station is now under wires which has been commissioned.
But RNQ CPU bhi jaldi karke khatam karen matter..so that Shaktipunj can be benifitted. and Hatia Chopan can be benifitted.
Hatia chopan ko to abhi abhi ye log Electric loco se chal sakte hain...thoda TT aur agresive kar dete.. aur Loco change RNQ mein hi karte... RNQ CPU bahut slack hai.
Diesel
...
more...
ki kafi bachat hoti
Train Status: 23m late
Last Update: BGSF/Bisugir Sharif 1 km<-->7 km PTKP/Potkapalli @ Today (09:35)
Next Station: PTKP/Potkapalli
Next Halt: RDM/Ramagundam


Blog  Time-Table

9 posts - Today - are hidden. Click to open.

  
97 views
Today (08:27)
17255 NS HYB EXP with GYWDP4D   811 blog posts   180 correct pred (72% accurate)
Re# 2382349-10            Tags   Past Edits
GNP/Ghanpur 4 km<-->2 km NSKL/Nashkal: 1m late
Crawling

  
85 views
Today (08:40)
17255 NS HYB EXP with GYWDP4D   811 blog posts   180 correct pred (72% accurate)
Re# 2382349-11            Tags   Past Edits
PQL/Pindial 6 km<-->1 km KZJ/Kazipet Junction: 1m late
Crossing e-loco shed

  
61 views
Today (08:54)
17255 NS HYB EXP with GYWDP4D   811 blog posts   180 correct pred (72% accurate)
Re# 2382349-12            Tags   Past Edits
at KZJ/Kazipet Junction
Departing frm pf1 bbs cstm Konark on pf 3

  
27 views
Today (09:25)
17255 NS HYB EXP with GYWDP4D   811 blog posts   180 correct pred (72% accurate)
Re# 2382349-13            Tags   Past Edits
at JMKT/Jammikunta: 18m late
3rd line works going on over taken 12761 Karimnagar sf with LGD wap4

  
6 views
Today (09:35)
17255 NS HYB EXP with GYWDP4D   811 blog posts   180 correct pred (72% accurate)
Re# 2382349-14            Tags   Past Edits
BGSF/Bisugir Sharif 1 km<-->7 km PTKP/Potkapalli: 22m late
At full mps
Blog  Time-Table

  
90 views
Today (08:42)
दानापुर वाले रेलफैन^~   12368 blog posts   486 correct pred (77% accurate)
Re# 2382409-1            Tags   Past Edits
Long journey starts...

  
60 views
Today (09:05)
दानापुर वाले रेलफैन^~   12368 blog posts   486 correct pred (77% accurate)
Re# 2382409-2            Tags   Past Edits
at DNR/Danapur: on time
22406 Departed with GZB WAP4 in lead

  
44 views
Today (09:17)
दानापुर वाले रेलफैन^~   12368 blog posts   486 correct pred (77% accurate)
Re# 2382409-3            Tags   Past Edits
at DNR/Danapur: on time
SPJ WDG3A 13611 'Shakti' in lead

  
29 views
Today (09:28)
दानापुर वाले रेलफैन^~   12368 blog posts   486 correct pred (77% accurate)
Re# 2382409-4            Tags   Past Edits
at DNR/Danapur: 8m late
Departed
Page#    308744 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Aug 27
Trains with ARP 15 Dep on: Fri Sep 1
Trains with ARP 30 Dep on: Sat Sep 16
Trains with ARP 120 Dep on: Fri Dec 15

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.