And Shatabdi to RNC. But, resources should not be destroyed for future use. Now, IR will not spend fund on re-construction of pit line. In short, forget BKSC as a terminal.
Another point, leave mail/exp trains. Stations of ADRA division aren't connecte properly by local tains with BKSC, not even Divisional HQ ADRA. This alone tells the situation. BKSC gets 90% of its trains from RNC division