Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Wed May 1 15:31:12 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 2047292
Posted: Nov 03 2016 (23:07)

16 Responses
Last Response: Nov 07 2016 (17:14)
Poll
6215 views
20 votes
0

Nov 03 2016 (23:07)  
ps14003
ps14003   238 blog posts
Entry# 2047292              
According to Financial express, Talgo, the Spanish manufacturer of high-speed trains, is all set to lease out 2-5 trains to Indian Railways in less than a year’s time. Sources with knowledge of the matter told FE Online, that Suresh Prabhu-led Indian Railways is awaiting a final approval of Niti Aayog, before officially telling Talgo to lease out its trains to India. Once the contract is signed, it will take Talgo less than a year to supply anywhere between 2-5 trains. “The train is likely to be of around 26 coaches each, so that the total capacity matches that of the existing Shatabdis,” sources told FE Online.
Possible routes ------
Translate to English
Translate to Hindi
NO vote
Delhi - Mumbai
65%
13
Delhi - Amritsar
0%
0
Mumbai - Ahemdabad
10%
2
Delhi - Lucknow/Jaipur/Bhopal/Chandigarh
25%
5

11 Posts

2240 views
0

Nov 06 2016 (15:00)
Subrat Shrivastava   29709 blog posts
Re# 2047292-12              
Talgo to india impossible hai ye baat saaf hai.Agar tracks ka mps har section ka increase kar de to LHB coach se hi high speed train chala sakte hai aur ye succesful bhi hogi
Translate to English
Translate to Hindi

2748 views
0

Nov 06 2016 (15:30)
SingleTraveller^~
SingleTraveller^~   3247 blog posts
Re# 2047292-13              
So many have voted for NDLS-BCT.
-
If I am not wrong, doesn't Talgo have only sitting arrangements? So will people, who can afford to travel by this costly train, prefer 12 hours of sitting or would they take the shorter duration flight?
Translate to English
Translate to Hindi

2112 views
1

Nov 06 2016 (16:05)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 2047292-14              
The interior seating arrangements can be altered easily enough. All that matters is the ability to run these rakes at higher speeds on our tracks. Interior systems and other cosmetic changes do not matter much to the train's operations.
Most important thing is that Talgo operations will cost lesser than normal LHB coach trains. It is very crucial that IR follow this and price the Talgo on the same rates as the Raj or Shatabdi class ( without the flexi fare) or a marginal increase to recover initial rake costs. If IR prices them too high, it will defeat the whole purpose of getting the rakes here in the first place.
...
more...
If they guarantee an overnight travel, then they can attract quite a bit of crowd. Many premier still have a good rush for AC 1st class and between major cities even though it costs as much as a flight ticket simply because people prefer traveling overnight with a comfortable sleep than waking up early morning to catch an early morning flight. I've regularly experienced this with SBC Raj between SBC and SC. A lot of passengers take Raj as they prefer having a comfortable sleep rather than waking up at 4 AM and catching a morning flight.

Translate to English
Translate to Hindi

2603 views
1

Nov 07 2016 (16:24)
I.R.needrejuvenation~
I.R.needrejuvenation~   1946 blog posts
Re# 2047292-15              
IR shall lose money if they convert 21 LHB coached (500M long) Mum/HWH Rajs into 26 Talgo coached (340M long) rake or replace LHB with Talgo in shatabdies.
It will be better if Raj/Shat with LHB coaches are operated at 160kmph.
IF current MUM raj is operated at 130kmph and given overriding priority which was given to Talgo train during trials, it can easily save 1-1.5 hrs i.e. do journey in 14.5- 15 hrs. And if speed is kept 160kmph like Gatiman, 12-13 hrs seems possible.
Huge
...
more...
expenditure in Talgo rake at this juncture, with IR in severe cash crunch is not justified when the job can be done without any capital expenditure.

Translate to English
Translate to Hindi

2055 views
0

Nov 07 2016 (17:14)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 2047292-16              
It will be a rather fine line when it comes to the earnings. The train capacity may decrease by moving to a Talgo rake. But at the same time there would be considerable savings in Energy and maintenance costs ( Talgo is projecting about 30%, but it will be less that that). With that included, the earnings may not take a big hit.
Talgo may not be a viable alternative at the outset for the Mumbai Raj, or the Bhopal Shatabdi due to the loss in capacity. But it will be a better alternative for many of the Shatabdi's running on non-high speed routes like MYS/SBC-MAS, Pune-SC etc.
...
more...
Actually a huge capital investment would be required for upgrading routes to run the Mumbai raj at 160kmph. For the HWH and Mumbai routes alone, IR has projected an estimate of 10,000 cr for upgrading the routes to be 160kmph fit as it would require actual relaying of tracks, changes in alignment in some places and many more large scale works to enable the long, heavy rakes to run at high speeds. It is not a short term project.
On the contrary, Talgo rakes will require a much smaller expenditure ( for initial rake purchase and setup of maintenance facilities) and can be used on any of the trunk routes and most of the important non-high speed routes with very minor modifications on these routes. They can run at higher speeds on existing routes and will reduce maintenance and energy costs considerably.
But Talgo is only a short term solution.More importantly, the LHB technology itself is now over 25 years old and stainless steel coaches worldwide have been replaced with more efficient, lighter aluminum and alloy coaches. By the turn of the decade, IR will have to move to these newer ones to reduce operational costs ( and the savings it would get are considerable). Trying out Talgo rakes would go a long way to help IR to transition in to the next generation.

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

4466128 ★★★ 104AvishekRay~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy