As SC-CCT is 3 days it needs a dedicated rake and will not have any RSA with existing trains. SC-SHM will get LHB rake but the timing is not great with good speed and LHB is purely wasted, SC-NZM raj run by northern railway and mioxing of so many rakes is difficult and config wont match properly