Thats correct, trains like 22965/66 are having a slack of minimum 1 hr with diesel engine. If it is being hauled by eloco then there should be a saving of 1.5 hrs to 2 hrs. This train can easily do BGKT-Ju run in less than 13 hrs which will increase the patronage of this train.