SER requests railway board to reconsider halt of 20817/18 and shift it to Purulia.
CASE REOPENED.
The scheduled halt at ANR creates total freight instability throughout the section. On 10th February, 2018, 12 UP freight in the section had to be transferred to DN line to clear for Rajdhani. This left a huge mess behind. The halt even added to the misery. SER has suggested the board to reconsider and chage the whole timetable of 20817/18.
-