Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Sep 12 05:18:46 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Description/Uses/Merits of this ΣChain
Jaipur to Nagercoil via Mumbai

2089/Σ JP-DR-MDU-NCJ Route Tue, Wed, Thu, Sat ΣChain


Created: Jan 19 2012 (11:53) by Ruchir Gupta

Change Departure Station:
Change Arrival Station:

03
PNR    Forum    Time-Table    Availability    Fare Chart    Trips    Gallery    

ΣChain Blog

Page#    Showing 1 to 5 of 1548 blog entries  next>>
29 Glorius And Sucessful Years Of Ncj Csmt Express Via Katpadi
Translate to English
Translate to Hindi

14469 views
1

Sep 01 (21:54)
Lens77
Lens77   55 blog posts
Re# 6124720-1              
One of the worst train to be handled in SR, extreme slack time in this era of VB. Mission raftaar gone for a toss. Halts at kadiri and samalpatti are intentionally given to slow it down.better to run it as a passenger train or cancel it permanently. CR can provide better train to connect NCJ via KjM.
Translate to English
Translate to Hindi

12277 views
0

Sep 02 (21:53)
RailfanSPE
RailfanSPE   191 blog posts
Re# 6124720-2              
This train should go back via SWR and KJM.

Extremely corrupt staff (read bus mafia influence) who purposely diverted this train via DMM-PAK skipping KJM and removing another connection between Mumbai and Bangalore.
Translate to English
Translate to Hindi
General Travel
100968 views
0

May 02 (15:10)   16339/Mumbai CSMT - Nagercoil Express (via Katpadi) (PT)
AkhileshSrilal1   34 blog posts
Entry# 6050926            Tags  
Train is rescheduled to leave to 10:40pm
Please update

Thanks

What
...
more...
has happened in this route many trains are rescheduled?

Translate to English
Translate to Hindi

9194 views
0

Sep 01 (21:55)
Lens77
Lens77   55 blog posts
Re# 6050926-1              
Despite giving a lot of Slack time in SR it's gets delayed. Old TT and route was more suitable to this train. After covid SR has completely screwed up.
Translate to English
Translate to Hindi
Rail Fanning
30987 views
11

Aug 15 (18:56)   16339/Mumbai CSMT - Nagercoil Express (via Katpadi) (PT) | GTL/Guntakal Junction (7 PFs) | ED/WAG-7/27480
ForeverRailfan^~
ForeverRailfan^~   57553 blog posts
Entry# 6158436            Tags   Past Edits
5 compliments
Great Great Great Great:Nice video & pic captures..👍👍 Great
Three Train Journeys in One: A Triple Adventure [1]
click here
1. 16339 Mumbai CSMT - Nagercoil Express (via Katpadi)
2. 11021 Dadar Central - Tirunelveli Chalukya Express (Via SMVT Bengaluru)
3. 22102 Madurai
...
more...
- Mumbai LTT Weekly SF Express

Translate to English
Translate to Hindi

8 Posts

21050 views
1

Aug 16 (11:02)
kjmwag9hc^~
kjmwag9hc^~   3123 blog posts
Re# 6158436-9              
1 compliments
Thanks
👌👌🔥🔥
Translate to English
Translate to Hindi

More Posts
Info Update
1027724 views
2

Aug 01 (17:29)   12958/Swarna Jayanti Rajdhani Express | MMCT/Mumbai Central (5 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   556 blog posts
Entry# 6143019            Tags   Past Edits
2 compliments
Agree Agree
In my opinion railways should make future train sets with this coach composition 6 general class coaches including luggage loading capacity , 6 sleeper coaches , 8 ac class coaches ( which can include third ac or second ac or first ac or can be a mixture of these coaches ) and ( either 1 ac coach or 2 ac coaches can be removed to add pantry car coach and extra luggage coach ) so 6+6+8 total 20 and 2 electric locos ( 1 at front side of whole trainset and 1 at back side of the whole trainset ) so 20 +2 total 22 coaches , so that instead of giving lhb rakes to some trains which runs on a longer path railways should directly convert those mail or express or superfast express trains into these trains sets and cost of making lhb coaches will also be reduced or...
more...
saved due to directly conversion of mail or express train into train sets and rake reversal time of many trains will be reduced cost of doing rake reversal of a train will also be reduced ( due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) and speed of all trains can be increased (due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) . Please give your opinion on this but please don't give any argument related to politics so that i can save my post from getting archived.

Or either railways can apply this coach composition in in some upcoming amrit bharat express trains so that we can get see that whether this coach composition for train sets will become a successful idea or will become waste idea.

Translate to English
Translate to Hindi

More Posts
General Travel
27334 views
0

Aug 05 (14:47)   16339/Mumbai CSMT - Nagercoil Express (via Katpadi) (PT)
RajMhamane^~
RajMhamane^~   7584 blog posts
Entry# 6146972            Tags  
A memorable day, when kalyan 4d brought down nagercoil
Translate to English
Translate to Hindi
Page#    Showing 1 to 5 of 1548 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy