Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Tue May 28 16:38:17 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Filters:

Page#    676999 Blog Entries  <<prev  next>>
General Travel
424 views
0

Today (16:23)   TATA/Tatanagar Junction (6 PFs) | BNDM/WDG-4/12842
_V_K_^~
_V_K_^~   59258 blog posts
Entry# 6078039            Tags   Past Edits

2 pics

BNDM WDG 4 Twins -- 12842 & 70750 coming out of TATA DTS and going towards Tatanagar Yard.
Translate to English
Translate to Hindi

More Posts
General Travel
7301 views
3

Today (11:23)   13287/South Bihar Express (PT) | ARA/Ara Junction (4 PFs)
inviteskr
inviteskr   128 blog posts
Entry# 6077815            Tags   Past Edits
1 compliments
Agree
जब से 13287/13288 का एक्सटेंशन आरा हुआ है ये ट्रेन दक्षिण मध्य रेलवे में दुर्ग से टाटा आते आते काफी लेट हो जा रही है जिस कारण आरा तक आते आते ट्रेन और लेट हो जा रही इस कारण वापसी में ये ट्रेन कई दिन री सिड्यूल हुई। इस ट्रेन के लेट होने का ठीकरा आरा पर फोड़ा जा रहा है। ट्रेन टाटा नगर आते आते क्यों लेट हो जा रही है इसका निदान खोजने के बजाए विस्तारी करण को दोष देना मेरे समझ से उचित नहीं है। रेलवे को ट्रेन के लेट होने के कारण को दूर कर यात्रियों को हो रही परेशानी को दूर करना चाहिए।
Translate to English
Translate to Hindi

8 Posts

3140 views
0

Today (13:28)
Nirbhaysingh
Nirbhaysingh   93 blog posts
Re# 6077815-9              
Ye sbh baat board ko na sochna chahiye tha extension ke pahle
Translate to English
Translate to Hindi

2986 views
1

Today (13:32)
Aranyadham_Express~
Aranyadham_Express~   354 blog posts
Re# 6077815-10              
/blog/post/5806813
The train (RJPB-HWH) you mentioned and some other trains were also proposed for extension upto Ara. But it was the final decision of RB for extension of South Bihar. So it's better for you to use your 'dimag' before talking anything gibberish.
Translate to English
Translate to Hindi

1997 views
0

Today (15:13)
Kanhawrs~
Kanhawrs~   131 blog posts
Re# 6077815-11               Past Edits
Bro 1st you check avarage delay departure this train from ARA. this can save time for maintenance if run from RJPB and you also check before extansion maximum time same as delay arrival in RJPB bt departure on time. Everyone know this train 90% deley between RAIPUR to TATA. If run from RJPB than minimum save time 5-6 hrs for maintenance in same racks.
This is not any logic this real truth if RUN from ARA than need 1 extra rack . This or any train extension from ARA bcz there have powerfull politician bcz ARA is not a terminal or rank of top 5 city in bihar. Bt you see there maximum train stopping and always demanding
...
more...
extansion.
Think you 1st if i write in wrong word than i am so sorry.

Translate to English
Translate to Hindi

1206 views
0

Today (15:52)
Shrivastavkranti2393
Shrivastavkranti2393   338 blog posts
Re# 6077815-12              
Railway board kya krega. Politics hoga to. Dimag use kar k hi bol rha hu. Ser mein train phle v chalti thi lekin patna side se reschedule nhi hui. Jab se extension hua hai ho rhi hai. Main kya kah rha hu smjhe nhi. Main kah rha huu. Late jo aa rhi hai phle v aati thi. Lekin. Rjpb ara ko up down cover karne mein usko 3 to. 4Hr lagta hai. Wo time bchta tha to reschedule nhi hota tha. Ye bol rha huu main. Aur rake swap v ho jata tha necessary hone pe lekin ab to ... Politics hai sirf.
Translate to English
Translate to Hindi

1175 views
0

Today (15:54)
Shrivastavkranti2393
Shrivastavkranti2393   338 blog posts
Re# 6077815-13              
Rjbp ara jane mein up down 4 ghanta bdh gya is train ka. Isiliye jyada reschedule ho rhi hai. TAT km hua. Lekin ye ara wla sb smjh hi nhi rha hai
Translate to English
Translate to Hindi
General Travel
10163 views
6

May 24 (18:40)   PNBE/Patna Junction (10 PFs)
Vijayawada
Vijayawada   70 blog posts
Entry# 6074731            Tags  
3 compliments
Useful Useful Useful
Pitlines in various Coaching Depots in East Central Railway Zone:

1. Patna Coaching Depot - 2 Pitlines
• Pitline-1 550m 24 ICF/22 LHB
• Pitline-2 337m 16 ICF/13 LHB
...
more...

2. Rajendranagar(T) Coaching Depot - 5 Pitlines
• Pitline-1 514.5m 23 ICF/21 LHB
• Pitline-2 550m 24 ICF/22 LHB
• Pitline-3 550m 24 ICF/22 LHB
• Pitline-4 535m 24 ICF/22 LHB
• Pitline-5 490m 21 ICF/20 LHB

3. Danapur Coaching Depot - 3 Pitlines
• Pitline-1 550m 24 ICF/22 LHB
• Pitline-2 550m 24 ICF/22 LHB
• Pitline-3 550m 24 ICF/22 LHB

4. Ara Coaching Depot - 1 Pitline
• Pitline-1 600m 26 ICF/24 LHB

5. Rajgir Coaching Depot - 1 Pitline
• Pitline-1 550m 24 ICF/22 LHB

6. Jhajha Coaching Depot - 2 Pitlines
• Pitline-1 400 16 ICF
• Pitline-2 Under Construction

7. Gaya Coaching Depot - 2 Pitlines
• Pitline-1 540m 24 ICF/22 LHB
• Pitline-2 540m 24 ICF/22 LHB

8. Dhanbad Coaching Depot - 4 Pitlines
• Pitline-1 385m 17 ICF/15 LHB
• Pitline-2 495m 22 ICF/20 LHB
• Pitline-3 555m 24 ICF/22 LHB
• Pitline-4 540m 24 ICF/22 LHB

9. Barkakana Coaching Depot - 1 Pitline
• Pitline-1 315m 13 ICF

10. Gomoh Coaching Depot - 1 Pitline
• Pitline-1 370m 15 ICF

11. Chopan Coaching Depot - 1 Pitline
• Pitline-1 650m 28 ICF/26 LHB (Under Construction)

12. Muzaffarpur Coaching Depot - 3 Pitlines
• Pitline-1 540m 24 ICF/22 LHB
• Pitline-2 496m 22 ICF/20 LHB
• Pitline-3 Under Construction

13. Barauni Coaching Depot - 2 Pitlines
• Pitline-1 572m 25 ICF/23 LHB
• Pitline-2 572m 25 ICF/23 LHB

14. Raxaul Coaching Depot - 2 Pitlines
• Pitline-1 600m 26 ICF/24 LHB
• Pitline-2 538m 23 ICF/21 LHB

15. Darbhanga Coaching Depot - 2 Pitlines
• Pitline-1 596m 26 ICF/24 LHB
• Pitline-2 541m 24 ICF/22 LHB

16. Jaynagar Coaching Depot - 1 Pitline
• Pitline-1 580m 25 ICF/24 LHB

17. Saharsha Coaching Depot - 2 Pitlines
• Pitline-1 550m 24 ICF/22 LHB
• Pitline-2 Under Construction

18. Samastipur Coaching Depot - 1 Pitline
• Pitline-1 575m 25 ICF/23 LHB

Source: RTI filed by me

Translate to English
Translate to Hindi

6827 views
1

May 24 (18:46)
sohamkir~
sohamkir~   97 blog posts
Re# 6074731-1              
1 compliments
Agree
Seriously only 2 pitlines in Barauni and it handles so many trains maintenance.Dhanbad is underutlilised here.
Translate to English
Translate to Hindi

4514 views
1

May 25 (06:17)
RohitBiharSharif~
RohitBiharSharif~   7278 blog posts
Re# 6074731-2              
1 pitline is under construction at Jiwdhara (Motihari).
I think 4 more pitlines are proposed at Ara (1 by DNR div and 3 more by DDU division at Udwant Nagar)
Translate to English
Translate to Hindi

3162 views
0

May 25 (08:24)
RohitBiharSharif~
RohitBiharSharif~   7278 blog posts
Re# 6074731-3              
3rd pitline is under construction at Barauni.
4th pitline is also approved.
Translate to English
Translate to Hindi
General Travel
7843 views
11

May 24 (19:02)   CNB/Kanpur Central (10 PFs)
Vijayawada
Vijayawada   70 blog posts
Entry# 6074740            Tags  
4 compliments
Useful Useful:info. Useful:info Useful
Pitlines in various Coaching Depots in North Central Railway Zone:

1. Agra Cannt Coaching Depot - 2 Pitlines
• Pitline-1 26 ICF/24 LHB
• Pitline-2 26 ICF/24 LHB
...
more...

2. Agra Fort Coaching Depot - 1 Pitline
• Pitline-1 22 ICF/20 LHB

3. Mathura Coaching Depot - 1 Pitline
• Pitline-1 13 ICF Coaches

4. Jhansi Coaching Depot - 5 Pitlines
• Pitline-1 322m 15 ICF/14 LHB
• Pitline-2 560m 26 ICF/24 LHB
• Pitline-3 210 10 ICF
• Pitline-4 255 12 ICF
• Pitline-5 24 ICF/22 LHB (Under Construction)

5. Gwalior Coaching Depot - 4 Pitlines
• Pitline-1 460m 21 ICF/20 LHB
• Pitline-2 480m 21 ICF/20 LHB
• Pitline-3 385 17 ICF
• Pitline-4 645m 26 ICF/24 LHB (Under Construction)

6. Khajuraho Coaching Depot - 1 Pitline
• Pitline-1 540m 24 ICF/22 LHB

7. Prayagraj Coaching Depot - 6 Pitlines
• Pitline-1 24 ICF/22 LHB
• Pitline-2 26 ICF/24 LHB
• Pitline-3 24 ICF/22 LHB
• Pitline-4 23 ICF/21 LHB
• Pitline-5 23 ICF/21 LHB
• Pitline-6 25 ICF/23 LHB

8. Subedarganj Coaching Depot - 2 Pitlines
• Pitline-1 26 ICF/24 LHB
• Pitline-2 26 ICF/24 LHB

9. Kanpur Central Coaching Depot - 6 Pitlines
• Pitline-1 27 ICF/25 LHB
• Pitline-2 27 ICF/25 LHB
• Pitline-3 27 ICF/25 LHB
• Pitline-4 14 ICF
• Pitline-5 14 ICF
• Pitline-6 12 ICF

Source: RTI filed by me

Translate to English
Translate to Hindi
General Travel
34568 views
15

★★
May 25 (08:17)   12393/Sampoorna Kranti Express (PT) | ARA/Ara Junction (4 PFs)
RohitBiharSharif~
RohitBiharSharif~   7278 blog posts
Entry# 6075141            Tags  
4 compliments
Useful Agree Useful Useful
All trains halting at Ara Junction will have a halt duration of 5 minutes soon - DRM Danapur.

Bhagwaan bachaye ab DNR mainline ko. 🥱
Translate to English
Translate to Hindi

40 Posts

5521 views
1

May 26 (21:42)
ItzAbhi^~
ItzAbhi^~   1954 blog posts
Re# 6075141-41              
1 compliments
Great:😂😂😂😂
Oo Mai to dar gya . Mere seat par baith jaiye aap ara se hai
Translate to English
Translate to Hindi

5007 views
0

May 26 (22:09)
Shrivastavkranti2393
Shrivastavkranti2393   338 blog posts
Re# 6075141-42               Past Edits
Haa shi bole aara ka log ticket lete hai. Ac mein khade hone ka ticket aur gate par v Dikh rha hai na upper mein dekh lo. Aur Ye wla ticket sirf ara buxar walo ko hi milta hai ac mein khade hokar jane wla bolte sharm v nhi aa rha hai.
Translate to English
Translate to Hindi

3252 views
1

Today (11:15)
AmitJha^~   18342 blog posts
Re# 6075141-43              
1 compliments
Agree
agar possible hai to banaye New Jamalpur.. coz seriously problem to hai. BGP me bhi PF 6 ki side terminal banane ki baat hai aur ab MDLE DUMK line me New Bhagalpur banane ki sun rahe hain. Don't know kya plans hain
Translate to English
Translate to Hindi

2097 views
0

Today (12:29)
ItzAbhi^~
ItzAbhi^~   1954 blog posts
Re# 6075141-44              
Space to Bhagalpur side near Ratanpur/Jamalpur new Quarry siding hi milega new Jamalpur station ke liye.
Translate to English
Translate to Hindi

715 views
0

Today (16:08)
ItzAbhi^~
ItzAbhi^~   1954 blog posts
Re# 6075141-45              
Jagdishpur ke pass banega new Bhagalpur station in BGP- Barahat section
Translate to English
Translate to Hindi
Page#    676999 Blog Entries  <<prev  next>>

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

3619297 ★★★ 391HBR~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy