Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Aug 22, 2017 18:34:46 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Aug 22, 2017 18:34:46 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Page#    318404 Blog Entries  next>>
  
General Travel
0 Followers
179 views
Today (01:42)   GSQ/Guir Saranga (1 PFs)

Howrah Rajdhani with GZB HOG WAP7😍~   382 blog posts   138 correct pred (61% accurate)
Entry# 2387005            Tags   Past Edits
Guir Saranga SB.
Source-Google Maps.

  
92 views
Today (11:01)
Anupam Sarkar   6150 blog posts   42395 correct pred (87% accurate)
Re# 2387005-1            Tags   Past Edits
Give credits to owner

  
10 views
Today (18:31)
Howrah Rajdhani with GZB HOG WAP7😍~   382 blog posts   138 correct pred (61% accurate)
Re# 2387005-2            Tags   Past Edits
Forgot who was the owner.

  
0 views
Today (18:34)
Anupam Sarkar   6150 blog posts   42395 correct pred (87% accurate)
Re# 2387005-3            Tags   Past Edits
You have to search and find out his name and put up on display, otherwise post will be deleted.
Trip is in progress. Status not available.
Live logging has already been enabled for this trip.
Blog  Time-Table

  
51 views
Today (18:10)
Mr Wayne😎©®🍺~   2584 blog posts   127 correct pred (74% accurate)
Re# 2387542-1            Tags   Past Edits
new rake today which has no train no. just suhaildev express.....

  
33 views
Today (18:20)
Mr Wayne😎©®🍺~   2584 blog posts   127 correct pred (74% accurate)
Re# 2387542-2            Tags   Past Edits
2009 made NR coaches....with new TB of my coach...

  
26 views
Today (18:22)
Mr Wayne😎©®🍺~   2584 blog posts   127 correct pred (74% accurate)
Re# 2387542-3            Tags   Past Edits
haldia on pf-2.... Suhaildev via Lko on pf-1

  
1 views
Today (18:33)
Mr Wayne😎©®🍺~   2584 blog posts   127 correct pred (74% accurate)
Re# 2387542-4            Tags   Past Edits
Loco TKD 4B 40076 incharge.... out of gen coaches one Antodya ECR...one normal NR GS....4 DDU SR...
7 SL (ER-2016, NR-2015, TOURISM NR-2013, NR-2015, NR-2016, ECR-2015, ER-2016)....3 3A (NR-2016-14-15) 1 2A NR-2009 1A-2A NR-2016 1A NR-2010 rugged one..
  
General Travel
0 Followers
152 views
Today (17:10)  

Gaurav Sharma   8871 blog posts   434 correct pred (59% accurate)
Entry# 2387578            Tags   Past Edits
Indian Railway ko Bullet or Talgo train ka sapna chhod kar pahle sab traino ko #LHB fied karna cahiye.

6 posts - Today

  
36 views
Today (18:21)
HA1 Naani Ka sher~   678 blog posts   80 correct pred (68% accurate)
Re# 2387578-7            Tags   Past Edits
Mai Aapse 100% Sehmath hu ki bullet se pehle hame purey Coaches ko Lhbfied krna chahiye kyoki humara infrastructure shi nhi h bullet k liye or kuch haam .Lekin Lhbification ka Drawback khud LHB coaches h .LHB coaches self Generating coach nhi h to alag se Generator Car. Phir Diesel consumption bhi Ek factor h. Railway ko khi na khi Apne R&D sector ko lagana chahiye ki hum lhb Coaches ko self Generating Coaches Bana sake Like ICF .
Baki LHB coaches Bhut safe h.
Thanks And Correct me if I am
...
more...
wrong.
Thanks.

  
30 views
Today (18:25)
Shivam~   4666 blog posts   1173 correct pred (87% accurate)
Re# 2387578-8            Tags   Past Edits
Vo bahut hi low interest ka loan hai, aur passenger fares se chuka hoga, uska bhugtan tax se directly nahi hoga. Uska relation bhi nahi h IR se, independent project h.

  
22 views
Today (18:26)
Waiting of Placement 😍^~   1305 blog posts   5479 correct pred (77% accurate)
Re# 2387578-9            Tags   Past Edits
Delhi Metro ka karza to desh nhi chuka rha ...

  
16 views
Today (18:27)
Awes Khan*^~   45828 blog posts   2173 correct pred (78% accurate)
Re# 2387578-10            Tags   Past Edits
Fir bhi Mumbai - ADI bahot saturated section hai. Bahot sari high speed trains hai to passenger low fare chhod ke bullet train se kyu travel karenge? Aur daily ki 1-2 up down trip se kya 1 lakh crore +interest chukaya jasakta hai?

  
13 views
Today (18:31)
Addicted To IRI®♔®~   16068 blog posts   632 correct pred (62% accurate)
Re# 2387578-11            Tags   Past Edits
FM ho aap kisi bhi controversy bache
tatsam tarah ki post karke Vivado me Na Uljhe
  
Info Update
0 Followers
199 views
Aug 20 2017 (17:59)   G/Gondia Junction (7 PFs)

HA1 Naani Ka sher~   678 blog posts   80 correct pred (68% accurate)
Entry# 2385759            Tags   Past Edits
VISION 2020 –For Mechanical Department of SECR
Salient Features
1 ) New Diesel Shed at Raipur.
2 ) Additional DEMU rakes at Gondia – Total 20 rakes & additional shed
3 )
...
more...
Bio-diesel – Deployment, stocking & use on locos.
4 ) 140T brake down crane at Nainpur
5 ) 140T brake down crane at Gevra Road
6 ) Pit wheel lathe at Gondia for DEMU tyre turning
7 ) Coaching terminals at Raigarh,Durg, Gondia, Korba ,Naya Raipur.
8 ) Training centre for LHB coaches
9 ) POH facility for 20 DEMU rakes at Itwari / Kalumna
10) Freight examination facilities at Dongargarh.
SUMMARY:
A vision document 2020 is prepared for Mechanical Department of SECR. The document outlines needs of the Mechanical Department in order to maintain different types of rolling stock to high level of availability, reliability and safety.
1.0INTRODUCTION:
Due to increase in growth of passenger and freight traffic, there is need to plan for the future requirements of rolling stock for SECR including development of facilities and infrastructure for their maintenance in order to keep the rolling stock in good fettle. Accordingly, this vision document has been prepared considering 4 sections viz. Diesel Locos & DEMUs, Coaching, Freight and Workshops.
2.0DIESEL LOCOMOTIVES and DEMUS:
2.1New Diesel Shed for 150 High Horse Power Locos:
New diesel shed is planned to be set up at
Raipurto home 50 HHP locos. This shed will be further expanded to hold 150 HHP locos before 2020. It is planned that these locos shall visit new EMD shed
Raipur once in 90 days and therefore could be of service anywhere in Indiain the interim period.
2.2 Modification in NG diesel shed, Motibagh for 50 HHP locos:
With the reduction in NG services due to gauge conversion, the requirement of NG diesel locos based at Motibagh diesel shed will reduce. The shed is being extended to accommodate 15 board gauge diesel locomotives. Thus the skill of the existing work force shall be utilized for maintenance of broad gauge HHP locos. By 2020, it is proposed that the shed will be further modified to home 50 HHP locos. It is planned that these locos shall visit Motibagh diesel shed once in 90 days and therefore could be of service anywhere in Indiain the interim period.
2.3 Additional DEMU rakes at Gondia –Total 20 rakes & additional shed:
Presently 7 DEMU rakes are based at Gondia. There are large number of main line coaching trains with short journey being used for commuter services. In order to release these coaches for overnight train journeys, about 20 additional rakes of DEMUs will be required over SECR. Hence planning needs to be done for additional infrastructure to home these rakes for maintenance. Also provision of storage facilities and material procurement planning needs to be done.
2.4 Conversion of NG passenger services to DEMU:
With gauge conversion in Nagpur region and Raipur region, there will be further requirement of DEMU services until the entire area is electrified. Presently the bare holding of main line coaches in SECR is inadequate in non-electrified section after gauge conversion from NG to BG.
2.5Bio-diesel –Deployment, stocking & use on locos.
A bio-diesel plant is being set up at
Raipur by Indian Railway Organization for Alternate Fuels (IROAF). This is adjacent to new HHP diesel loco shed under construction. This will supply bio-diesel directly across the boundary wall to the fuel installation in the new HHP shed at
Raipur. In addition, procurement of bio-diesel is done through Stores Orgn of SECR for 10% blending with fuel for diesel loco use. Due to depletion in natural fuel oil resources, it is essential to pursue the development and usage of bio-diesel further to approximately 15% blending with fuel.
2.6 New NG locos for maintaining NG service for next ten years till 2025.
As gauge conversion will take another 10 years due to paucity of funds in plan head, it is essential to keep the narrow gauge services in SECR operational for about 10 years. Therefore, it is essential that at least 5 new narrow gauge locos are manufactured under RSP due to aging of the fleet and codal life getting over of large number of locos.
2.7 AESS proposal in RSP:
To have control on fuel consumption, it will be useful to provide Automatic Engine Start & Shutdown (AESS) device in all the locos. It is expected that fuel consumption will come down by 5%. This needs to be planned for main line as well as shunting locos, as well as narrow gauge locos.
2.8Training centre for WDG4 locos:
With induction of HHP locomotives and phasing out of Alco locomotives, it is necessary that training is given at all levels to shed staff as well as running staff, on HHP loco systems, their functioning, maintenance, and operation. Provision of simulator in new EMD diesel shed and development of training modules for the same needs to be organized for LP/ALPs.
2.9140T brake down crane at Gevra Road:
With the construction of new lines from Gevra in 3 directions (East, West & North) these will be need for additional new 140 T brake down crane to be homed at Gevra Road. This 140T brake down crane should be planned for procurement before 2020.
2.10140 T brake down crane at Nainpur:
Due to vast gauge conversion of narrow gauge network in Nagpur division, a 140 T brake down crane will need to be based at Nainpur by 2025.
2.11Training centre for 140 T crane:
Brake down cranes of 140 T capacity involve new technology and thus one training centre needs to be developed in SECR in Bhilai area to educate staff on all aspects of theoretical and practical training in operation and maintenance of 140 T brake down crane.
2.12 Unit Exchange spares for locos:
We need to plan for unit exchange spares (UES) for HHP locomotives and DEMUs so that ineffective percentage targets can be reduced further and availability of HHP locos and DEMUs increased. The concept shall be that components, assemblies and subassemblies shall be replaced at the time of major schedule of locos and DEMUs so that such rolling stock can be released quickly for traffic use. The removed components shall be separately sent for maintenance without hold up of rolling stock from where it is removed. Likewise, adequate unit exchange spares of important components needs to be maintained for 140 T brake down cranes so that the reliability and availability of the same is effectiveness at times of accidents.
2.13Pit wheel lathe at Gondia for DEMU tyre turning. Presently, tyre turning of full DEMU rake is done at Bhilai Electric Loco shed as there is no in-situ tyre turning facility available for DEMU rakes. With the growth in the fleet of DEMU rakes, it is essential to have a under flow pit wheel lathe at Gondia, over which the whole DEMU can pass and tyre turning be done for the full rake.
3.0 Coaching
3.1 Coaching terminals at Raigarh, Gondia, Korba Naya Raipur.
New trains are to be started from Raigarh, Gondia, Korba and Naya Raipur. Hence primary maintenance for these trains shall have to be done at new full-fledged coach maintenance depots at these stations. These are likely to home ICF type coaches. these terminals will need to cater to linen management through mechanized laundries and will require planning for mechanized cleaning of coaches at these depots as well as OBHS for the trains originating at these stations. Sick line and spare maintenance coach lines as well as lines for stabling of rakes after pit examination will also be required at these depots.
3.2 LHB coaching terminal at Uslapur/BSP:
About 80 LHB coaches shall be received at Bilaspur within two years. 12 coaches have already been arrived. It is essential to have a separate coach maintenance terminal for maintenance of LHB coaches. This can be planned in the land between Bilaspur goods shed and existing coach maintenance depot. These coaches will need to go to workshop for IOH as well as POH. Therefore, it is necessary to nominate workshops for these activities as presently there is no plan for developing workshop facilities for LHB in SECR.
3.3 Training centre for LHB coaches:
A training school can also be developed near the LHB coach maintenance terminal. This school shall be utilized to impart knowledge on design, construction, maintenance and operation of LHB coaches. It would be desirable to have cut section models for training purposes.
3.4 BOOT laundry of 6 T capacity:
At the present level of growth of passenger services as well as increase in number of coaches of existing trains, there will be at least 6% per year growth in number of coaches homed in SECR. Thus on today’s date, even with through departmental mechanized laundries at Bilaspur and Durg, each of 1 Ton capacity per shift, there is immediate requirement for a 6 Ton mechanized laundry on BOOT pattern to be commissioned in two years time at Bilaspur. Therefore, we need to process now and tender for the same in 2014 itself. This would take care of coaching services of Bilaspur division only. There will be additional demand for BOOT type laundry at NGP/SECR after gauge conversion.
3.5 NGP coaching depot:
After Narrow Gauge conversion to broad gauge, trains originating and terminating at Nagpur/SECR shall need primary and secondary maintenance as well as preventive maintenance schedules i.e. A, B, C for the coaches homed at Nagpur, SECR. There is already an existing coaching depot at Nagpur, CR and this is being shifted by Central Railway authorities to Ajni. Therefore, it can be planned that the existing coach maintenance depot at Nagpur Central Railway be taken over and developed by SECR for broad gauge coach maintenance after gauge conversion of Chindwara-Nagpur-Nagbhir line.
3.6 New NG coaches for maintaining NG service for next ten years till 2025.
As gauge conversion will take another 10 years due to paucity of funds in plan head, it is essential to keep the narrow gauge services in SECR operational for about 10 years. Therefore, it is essential that at least 20 new narrow gauge coaches are manufactured immediately under RSP due to aging of the fleet and codal life getting over of large number of coaches.
3.7 Unit Exchange spares for coaches:
We need to plan for unit exchange spares (UES) for coaches so that ineffective percentage targets can be reduced furthers and availability of coaches is increased. The concept shall be that components, assemblies and subassemblies shall be replaced at the time of major schedule of coaches so that such rolling stock can be released quickly for traffic use. The removed components shall be separately sent for maintenance without hold up of rolling stock from where it is removed.
4.0 Freight :
4.1Enhancement of ROH capacity:
The target of ROH for SECR has been enhanced in this financial year to 815 wagons per month. Out of this, the target for Bilaspur is 250 wagons and for PP yard Bhilai is 565 wagons per month. By the year 2020, it is planned to develop the infrastructure further for carrying ROH of 700 wagons per month at PP yard Bhilai and 400 wagons per month at BCN depot, Bilaspur. Material planning for stainless steel wagons (BOXNHL, BCNHL) as well as increase in budgetary provision for shift for maintenance from Mild Steel wagons to stainless steel wagons needs to be planned.
4.2Facilities for maintenance of 52 EUR rakes:
Railway Board has asked SECR to do primary maintenance of all EUR rakes of Indian Railways. Presently, the maintenance of existing 13 EUR rakes is done at BMY, Raipur division. Demand from Engineering Directorate of Railway Board is to develop a total of 52 EUR rakes at Bhilai for Engineering Deptt. of Indian Railways. Covered facilities will be required to be enhanced suitably at BMY. Furthermore, atleast two stabling lines and to more train examination lines will be required to be developed at BMY. This expenditure needs to be planned from PH -31.
4.3Unit Exchange spares for freight stock:
We need to plan for Unit Exchange Spares (UES) for freight stock including 52 EUR rakes so that ineffective percentage targets can be reduced further and availability is increased. The concept shall be that components, assemblies and subassemblies shall be replaced at the time of major schedule of freight stock so that such rolling stock can be released quickly for traffic use. The removed components shall be separately sent for maintenance without hold up of rolling stock from where it is removed. Material planning for maintenance of freight stock as well as increase in budgetary provision for these wagons needs to be planned.
4.4Freight examination facilities at Coal empty Yard, Bhilai:
3 lines have been laid at coal empty yard adjacent to PP yard. These lines shall be used for train examination due to the additional output expected from Bhilai Steel Plant. These three lines shall be commissioned very soon. It is expected that one train per shift shall be offered in this yard initially for CC examination (Primary maintenance examination). Hence, it is necessary to set up facilities including paved pathways between all the three lines for easy movement of men and materials. At least one gang of 8 staff in each shift for train examination needs to be created for this new activity. Suitable augmentation of EAC of materials as well as revenue budget for maintenance is required to be done.
4.5Premium examination facility at MXA:
Two lines are being laid at Marauda of Raipur division. Pathways need to be developed for examination of trains in these two lines. It is expected that one train per day shall be offered for premium examination at this new yard. At least one gang of 8 staff in day shift is required to be created for this new activity. Suitable material planning as well as budget provision for maintenance to be done, once this activity is started.
4.6Freight examination facility at DGG:
Due to increase in number of freight trains in SECR system as well as the expected increase in freight traffic due to gauge conversion in Nagpur division, it is necessary to develop freight examination facilities at Dongargarh. Earlier Railway Board had sanctioned development of facilities for freight examination at Gondia. However, operational constraints and change in pattern of traffic it has been desired by Operating Deptt. that the freight examination facilities be shifted to DGG. There is also shortage of lines at Gondia due to which this facility is required to be set up at DGG.
4.7Facilities for closing doors of BOBRN wagons at BRJN:
Presently empty BOBRN rakes are received at BRJN from BXQ and SEBD of ECoR via Jharsuguda road. These rakes cross both up and down lines and door closing is done at LJKR. Thereafter, they again cross both up and down lines for being placed at BOCM- 1,2,3,4,5. Thus complete train operation comes to a standstill on both main lines during such movements. It is, therefore, proposed to nominate one line for door closing activity in BOCM so that rakes from JSGR can come directly via up line to BOCM for door closing, without cutting across both up and down lines. Two pathways are required to be put on both sides of the nominated line each of width 2.5 metres so that mobile van can run on these pathways for movement of men and materials for closing doors as well as minor repairs to doors of BOBRN. This facility will result in increased line capacity.
4.8Rehabilitation of wagons at BMY –one thousand per year:
Facilities have been developed at BMY for midlife rehabilitation of BOXN wagons as well as for rebuilding of BOXN wagons. Approximately 700 wagons per year are being attended at BMY at present. Due to increase in the carrying capacity and wear and tear and damages to wagon sides and floor of large number of wagons, it is necessary to plan for rehabilitation of 1000 wagons per year. For this, additional funds will be required for contract work under PU -32 in revenue. Also it is necessary to strengthen contact management of these works at BMY.
5.0Workshop :
5.1 Increased in POH capacity of WRS to 500 wagons p.m.:
Presently WRS/R is doing POH of about 375 wagons per month. It is seen that wagons are having very heavy damages and requires average of 600 man hours of work for POH. There is need to improve upon the infrastructure and productivity through mechanization in order to tackle the increased work load per wagon. Also there are 2 to 3 rakes waiting at Raipurat any time for POH. WRS/Raipur also does POH of wagons for ECoR. Therefore, it is necessary to increase out turn capacity of POH of WRS/R to about 500 wagons per month.
5.2 MIB WS BG coaching POH 70 p.m.:
Presently, there is no coaching workshop in SECR for doing POH of SECR coaches. Hence coaches of SECR are sent to Perumbur, Kharagpur, Hubli, Matunga etc. for POH. It is not only time consuming but also some coaches do not come back to SECR. Railway Board has sanctioned setting up of BG coach POH facilities at MIBW/NGP for doing POH of 27 non-AC coaches per month. The detailed estimate has been sanctioned. This facility needs to be developed by the year 2017.
5.3 POH facility for 20 DEMU rakes at Itwari/Kalumna:
Presently, DEMU rakes are sent to Perumbur and Charbagh for POH. This is time consuming and locomotives are required to take the rakes for POH to shops. As there will be increased in DEMU rakes homed in SECR. It is essential to develop POH facilities in SECR itself. Suitable site is Itwari or Kalumna.
5.4 Unit exchange spares for coaches, wagons, locos at workshops:
We need to plan for Unit Exchange Spares (UES) for coaches, wagons, locos at workshops so that ineffective percentage targets can be reduced further and availability of rolling stock is increased. The concept shall be that components, assemblies and subassemblies shall be replaced at the time of POH of rolling stock so that such rolling stock can be released quickly for traffic use. The removed components shall be separately sent for maintenance without hold up of rolling stock from where it is removed.
6.0 CONCLUSION :
The above are some thought by the author for developments on SECR, which will result in improved availability and reliability of rolling stock and will generate will generate increased revenue in passenger and freight traffic.
  
General Travel
0 Followers
328 views
Today (11:56)   JNU/Jaunpur Junction (5 PFs)

jnufaisaljop~   268 blog posts
Entry# 2387254            Tags   Past Edits
जौनपुर रेलवे स्टेशन उत्तर रेलवे के लखनऊ डिवीजन अंतर्गत उपेक्षित है। क्योंकि इनसे लखनऊ चारबाग़ सही से नही सम्भल पा रहा है। जहां स्वच्छता का अभाव है।

6 posts - Today

  
183 views
Today (13:42)
Animesh Talukdar   81 blog posts
Re# 2387254-7            Tags   Past Edits
jaunpur apne jagah sahi hai. varanasi jaise international level wala station lucknow division me khush rahe sakta hai to jaunpur kya cheez hai.
jaha hai thik hai.

  
132 views
Today (14:53)
12952 नई दिल्ली मुंबई राजधानी द किंग~   8058 blog posts   359 correct pred (78% accurate)
Re# 2387254-8            Tags   Past Edits
Bilkul same aise hi Bareilly jaise high standard A1 category ka station Moradabad jiska kbud ka A category ke undar me rahta h.
Lekin yaha JNU me 8 linea kya ho vai inko to JNU district ko alag zone declare karwana h.

  
117 views
Today (15:07)
Spamming TL by Single updates must be banned^~   84552 blog posts   5303 correct pred (78% accurate)
Re# 2387254-10            Tags   Past Edits
Koi baat nahi...

  
46 views
Today (17:40)
jnufaisaljop~   268 blog posts
Re# 2387254-11            Tags   Past Edits
जौनपुर उत्तर प्रदेश एक अकेला जनपद है जहां से आठ बड़ी लाइन निकलती है। और इलाहाबाद से 7 मथुरा कानपुर से 6 वाराणसी लखनऊ आगरा मोरादाबाद से 5BG लाइन निकलती है।

  
14 views
Today (18:30)
12952 नई दिल्ली मुंबई राजधानी द किंग~   8058 blog posts   359 correct pred (78% accurate)
Re# 2387254-12            Tags   Past Edits
yaha to mujhe aisa koi station nahi dikh raha jisme se 8 lines nikal rahi ho. kyo apna majak udwate ho IRI me.Pahle ye batao ki age kya tumhari.
Page#    318404 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Sep 1
Trains with ARP 15 Dep on: Wed Sep 6
Trains with ARP 30 Dep on: Thu Sep 21
Trains with ARP 120 Dep on: Wed Dec 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.