Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Sep 24, 2017 19:44:42 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Sep 24, 2017 19:44:42 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Page#    307865 Blog Entries  next>>
Departure: Today @ 16:35
12555/Gorakhdham SF Express (PT)
Trip# 115763    Traveller: The Rail Mail™*^~    Linked PNR Entry# 2397232
Class: 2nd Sitting - 2S
From: GKP/Gorakhpur Junction
To: LKO/Lucknow Charbagh NR
9 wishes
HJ HJ :) HJ HJ HJ HJ HJ HJ HJ am sir enjoy the ride of NER Kin
Train Status: 27m late
Last Update: at GD/Gonda Junction @ Today (19:42)
Next Station: GDK/Gonda Kachahri
Next Halt: BBK/Barabanki Junction


Blog  Time-Table

21 posts - Today - are hidden. Click to open.

  
74 views
Today (18:45)
IR no more Safe^~   24580 blog posts   101018 correct pred (75% accurate)
Re# 2397232-22            Tags   Past Edits
cc ko update kariye.

  
39 views
Today (19:20)
lets two unite into one   342 blog posts
Re# 2397232-23            Tags   Past Edits
LKO se koi connecting train h kya h am Sir

  
10 views
Today (19:42)
The Rail Mail™*^~   47145 blog posts   18548 correct pred (69% accurate)
Re# 2397232-24            Tags   Past Edits
at GD/Gonda Junction
Arrived... 7 min early.

  
0 views
Today (19:44)
The Rail Mail™*^~   47145 blog posts   18548 correct pred (69% accurate)
Re# 2397232-25            Tags   Past Edits
haan lko ac.

  
0 views
Today (19:44)
The Rail Mail™*^~   47145 blog posts   18548 correct pred (69% accurate)
Re# 2397232-26            Tags   Past Edits
ndls pe lc band h isliye kaafi din se dloco h.
Departure: Today @ 17:30
22461/Shri Shakti AC Express
Trip# 117577    Traveller: ❤श्री माता वैष्णो देवी कटड़ा❤^~    Linked PNR Entry# 2417824
Class: AC 2-tier - 2A
From: NDLS/New Delhi
To: SVDK/Shri Mata Vaishno Devi Katra
20 wishes
HJ HJ HJ Jai Mata Di शुभ यात्रा HJ HJ bhai HJ jai Mata Di HJ HJ Happy Journey.JAY MATA DI! HJ bro HJ HJ HJ जय माता दी Jai mata di .HJ HJ HJ HJ KK bhai HJ
Train Status: 41m late
Last Update: at GRA/Gharaunda @ Today (19:41)
Next Station: BZJT/Bazida Jatan
Next Halt: UMB/Ambala Cantt. Junction


Blog  Time-Table

106 posts - Today - are hidden. Click to open.


  
39 views
Today (19:32)
❤श्री माता वैष्णो देवी कटड़ा❤^~   17796 blog posts   21226 correct pred (67% accurate)
Re# 2417824-110            Tags   Past Edits
KFU/Kohand 1 km<-->4 km GRA/Gharaunda: 36m late
Stopped

  
23 views
Today (19:35)
❤श्री माता वैष्णो देवी कटड़ा❤^~   17796 blog posts   21226 correct pred (67% accurate)
Re# 2417824-111            Tags   Past Edits
KFU/Kohand 1 km<-->3 km GRA/Gharaunda: 38m late
Agains stopped and departed

  
Skipping

  
For you !
  
Spotted 12398 with HOG PORTS
#HOG_ENABLED_RAKE

3 posts - Today

  
Wahi lag raha hai
waise aajkal GZBP7 week me 2 se 3 baar aajaraha hai
aur avi GZB / MGS P4 mil raha hai
ho sakta hai CNB se GZB link hoga

  
Ye v ho Sakta hai!!

  
147 views
Today (10:42)
IR no more Safe^~   24580 blog posts   101018 correct pred (75% accurate)
Re# 2417689-7            Tags   Past Edits
fotos dalo . :)

  
114 views
Today (11:41)
▶ECR⭐ पू म रे डब्ल्यू ए पी 7 गोमो ⭐ECR◽◀~   14633 blog posts   1229 correct pred (79% accurate)
Re# 2417689-8            Tags   Past Edits
1 compliments
ok.
Photos nahi liya dono EOG se aluminum sheets unload ho raha tha
nxt tym try karunga

  
** Itarsi - Jabalpur Electrification Detailed Update **
1. Itarsi- Pipariya (67 KMS): Double Electric Line. Electric locos already plying.
2. Pipariya-Salichauka Road (36 KMS):- Poles erected. Clippers installed. Catenary along with contact wire installed. Tightening done. Work at stations done. (Completed)
3. Salichauka Road - Bohani (27 KMS):- Poles erected. Clippers installed. Catenary wire along with contact wire installed, except in few patches.
...
more...
Tightening still needs to be done. Masts at Gadarwara are erected and clippers are yet to be installed. (60 % Completed)
4. Bohani - Narsinghpur (31 KMS) :- Poles erected. Clippers installed. Catenary along with contact wire installed. Tightening done. Work at stations done. (Completed)
5. Narsinghpur - Bheraghat (62 KMS):- Poles erected. Clippers installed. Catenary along with contact wire installed. Tightening done. Work at stations done. (Completed)
__________________________________________________ __________________________________________________ ____________________________
In other words, just a small patch of 27 KMS bw SCKR and BHN is under construction. It's just a one month work. Apart from that everything is done. Major work left is Electrifying Jabalpur City, PFs and Yard. It'll take arounf 2 months or so, I guess. According to me, November could mark the entry of E-locos in JBP is work goes at decent pace.
#ETALDElectrification
#JBPNews
P.S: Apologies for the poor quality of pics. I was not feeling like going out and taking pictures while doorplating. So I took the pictures from inside.
  
Rail Fanning
0 Followers
89 views
Today (18:07)   02265/Sealdah - Anand Vihar Special Fare Puja AC Special | BNXR/Bidhan Nagar Road (4 PFs) | MGS/WAG-7/27339

DJ™^~   15658 blog posts   185575 correct pred (77% accurate)
Entry# 2418215            Tags   Past Edits
Shrill honking MGS waggie speeding through BNXR leading 02265 SDAH-ANVT AC Puja Special
.
Video Link: click here
Don't forget to subscribe: click here
Page#    307865 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Oct 4
Trains with ARP 15 Dep on: Mon Oct 9
Trains with ARP 30 Dep on: Tue Oct 24
Trains with ARP 120 Dep on: Mon Jan 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2409730
    Sep 15 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.