Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Bookmark
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Wed Dec 19 10:58:20 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips
Login
Feedback
PostPost Trn TipPost Stn TipAdvanced Search
Filters:

Page#    444198 Blog Entries  next>>
  
General Travel
0 Followers
2389 views
Oct 22 (00:04)   KDGI/Kudgi (1 PFs)

Salaam Rocky Bhai~   5838 blog posts   371 correct pred (60% accurate)
Entry# 3925539            Tags   Past Edits
Today I saw works of second siding of NTPC Kudgi plant which going towards Bijapur side until now I only saw Elevated siding which is on Gadag side so in future I think coal rakes coming from Gadag side can use this new siding towards bijapur and coal rakes coming from Hotgi side use Elevated siding which is on Gadag side.. I saw it from far so I didn't able to take pics..

  
846 views
Dec 02 (12:01)
Salaam Rocky Bhai~   5838 blog posts   371 correct pred (60% accurate)
Re# 3925539-2            Tags   Past Edits
For the second siding which i saw near Kudgi for NTPC STPP Kudgi its being executed by Konkan railways whose total lenght is measured as 11.650km
Konkan Railway Corporation Limited is the Project Management Consultant
(PMC) to M/s. NTPC Limited and whereas M/s. NTPC Limited is the Owner
(Client).
...
more...
The route length of the siding is approximately
11.650 kms. The total track length of the siding including 15 loop lines is
approximately 48.00 kms. The NTPC In-plant yard starts from Chainage
3/800 to 7/800 (total length = 4.00 kms) and width of the yard is
approximately 400 mtrs which is having 23 lines yard and in Stage-I, 15 loop
lines will be constructed but Earthwork will be done for 23 lines yard.
Maximum Earthwork of this siding is coming in this In-plant yard with
maximum cutting depth of approximately 10 mtrs and maximum filling of
approximately 14 mtrs and this may vary.
complete details can be looked into this link @ click here
Source: Google

  
115 views
Yesterday (20:14)
BijapurBulls2Titles~   5566 blog posts   363 correct pred (69% accurate)
Re# 3925539-3            Tags   Past Edits
I too saw this last time during deepavali. So Kudgi station will be like perfect 'K' type juncture, freights from either side can directly enter NTPC plant

  
0 views
Today (10:57)
Salaam Rocky Bhai~   5838 blog posts   371 correct pred (60% accurate)
Re# 3925539-4            Tags   Past Edits
Yup i think they did two sidings as one for frieghts entering from Bijapur side over elevated curvy siding and another in construction for freights coming from Gadag side to enter plant. But even they may use on as enterance and another one as exit of freight rakes.
  
General Travel
0 Followers
0 views
Today (10:54)   52458/Shimla - Kalka Passenger

nishantbnglr   58 blog posts   3 correct pred (75% accurate)
Entry# 4122521            Tags   Past Edits
Recently i had booked for 2 tickets in SML KLK PASS 52458, for my trip in feb 2019, via IRCTC.
Class: FC ( FIRSR CLASS ).
STATUS : CNF/F1/7/NO CHOICE
CNF/F1/8/WINDOW SIDE
I
...
more...
was going through post for this train. Some members have posted regarding only 6 seats for this class!!
Pls help.
1. Can anyone pls pls povide a picture / seat map diagram for this class in this train.
2. Is this FC caoch same as sml klk express?
3. Will there be rush of people in FC also?
Some post said there is toilet in FC. If so is not a coupe cabin kind off first class.
I m totally confused now.
Dear members, anyone who has traveled in this train kindly guide me in this regards.
Awaiting valuable reply.
  
Rail Fanning
0 Followers
1953 views
★★★
Dec 17 (12:42)   TATA/WAP-7/39011

Somanko^~   17258 blog posts   13597 correct pred (95% accurate)
Entry# 4115313            Tags   Past Edits
1 compliments
Superb Pics Somanko..
Finally..... DLMW made TATANAGAR WAP7 39011 arrived at TATA. A small recap of my Journey to TATA. I last visited TATA relatives in September so it was nearly around 3 months I last visited. Yesterday we had a Pre Christmas Programme so I reached home very late and fell asleep. I had to get up at 3:50 in the morning, get ready and avail some bus by 5 am to reach Howrah latest by 6 am to avail Ispat. Alarm was set at 3:45 but when I woke up I saw it was 5:11 already. So immediately brushed my teeth and got ready for the station. When I stepped out I saw no Yellow Taxis so took an auto and then got hold of an Uber as Uber was less too due to the rain which started last night in Kolkata. The Uber Driver drove quit fast and dropped me at...
more...
Howrah at 6:20 am. If my reservation was made in BBN Janshatabdi I would surely miss it but was lucky to book in Ispat. Now I had a plan that to visit ELS/ETS at TATA to have some glimpses of some WAP7 37XXX but it was my sheer luck that when Ispat was waiting at TATA outer Vikas informed me that 39011 is at the station. I was waiting the signal to be yellow so Ispat reaches before 39011 goes somewhere else. When I get off Vikas was there at the PF for me and then we both went to meet 39011. So after a hasty start everything ended well. My first meeting with Vikas after several attempts and getting to see 39011. It is very cold here at Jamshedpur plus raining heavily. See picture 2 you will understand how much it was and still raining here.
Some other pictures as well. Steel Express was late at KGP by more than 20 minutes it was with SRC WAP 7 30601 and one Antyodaya EOG. Some WAG9Hi of TATA with freight at TATA outer.

13 Public Posts - Mon Dec 17, 2018

  
582 views
Dec 17 (22:14)
Somanko^~   17258 blog posts   13597 correct pred (95% accurate)
Re# 4115313-14            Tags   Past Edits
Today I am very satisfied with my Captures. Specially capturing it from the front.

  
356 views
Today (00:14)
SP Sharma^~   1579 blog posts   2966 correct pred (86% accurate)
Re# 4115313-15            Tags   Past Edits
BRAND NEW WAP-7 TATA #39011 NEW SERIES 😍

  
64 views
Today (10:32)
Salaam Rocky Bhai~   5838 blog posts   371 correct pred (60% accurate)
Re# 4115313-16            Tags   Past Edits
1 compliments
Yes I enjoyed a lot
I enjoyed lot reading your blog and your efforts to capture 39011 TATA WAP7 in this heavy rainy day. Hope even you enjoyed your cold and rainy day nicely..

  
49 views
Today (10:34)
JBP ET OHE OMG 😲   696 blog posts
Re# 4115313-17            Tags   Past Edits
No it’s normal am 92 type

  
0 views
Today (10:57)
Shaurya117^~   3796 blog posts   17435 correct pred (80% accurate)
Re# 4115313-18            Tags   Past Edits
Maybe idk.
But the pantograph arm (the rear one) seems unusually long in pic 1.
  
General Travel
0 Followers
1247 views
★★★
Dec 16 (18:11)   12650/Karnataka Sampark Kranti Express (Via Kacheguda) (PT) | GTL/Guntakal Junction (6 PFs) | KJM/WDG-3A

vishnudattagtl~   309 blog posts
Entry# 4113022            Tags   Past Edits
Route diverted !
12650 H Nizamuddin - Yeshwantpur Karnataka Sampark Kranti Express led by KjM WDG3A Twins Curves at speed !
Video link :- click here

  
630 views
Dec 17 (13:10)
Vinay Bharadwaj*^~   6252 blog posts   984 correct pred (74% accurate)
Re# 4113022-1            Tags   Past Edits
Awesome capture... Loved it :)
  
Info Update
0 Followers
2358 views
Dec 17 (07:51)   DVG/Davangere (2 PFs)

🚂 Vijayanagara Express 🚂~   1137 blog posts
Entry# 4114413            Tags   Past Edits
Highlights of yesterdays function at DVG
1.Toluhunase-mayakonda double line opened.
2.ubl -jrudoubling will be completed in 2021.
3.on Jan 22nd foundation function for DVG New RS will take place 11cr for New building construction + 4cr for 2nd entrance total 15 cr ..
4.extension
...
more...
of HRR-KTY pass train upto HPt by march 2019 agreed by SWR GM : mp DVG.
5. KTY -CTA NL likely get scrap due to non profitable line report by RB.
6.ashok theater ROB decision will be taken by DVG dc.

12 Public Posts - Mon Dec 17, 2018

9 Public Posts - Yesterday

  
248 views
Yesterday (18:26)
16023 💎 Malgudi Express 💎 16024^~   2448 blog posts   119 correct pred (59% accurate)
Re# 4114413-23            Tags   Past Edits
Atleast after doubling a demu must be introduced from gdg to dwr with frequency of every 15 to 20 mins from morning 6am to 10 am and from evening 5pm to 8 pm in both the directions.

  
221 views
Yesterday (18:33)
Salaam Rocky Bhai~   5838 blog posts   371 correct pred (60% accurate)
Re# 4114413-24            Tags   Past Edits
Initially just required one demu now which can decongest Express trains Reserved class coaches as lot of seasonal pass holders travel in these coaches from Gadag to Hubli in haripriya ,Amravati,Hampi,Amaravti(17726) exp daily. and their is Only one pass train morning that also get late to reach UBL as it made to wait at UBL outer often for PF constraints at UBL early morning so ppl prefer Exp trains to reach early.If they start DEMU like at 7am early morning and reach UBL atleast at 8.10/8.15am then it will be helpful for all season pass holders..

  
190 views
Yesterday (18:37)
Salaam Rocky Bhai~   5838 blog posts   371 correct pred (60% accurate)
Re# 4114413-25            Tags   Past Edits
At Evening they have DWR-SUR pass train depart DWR at 5.45pm and arrive UBL at 6.30pm and GDG at 8.15/8.30pm which is enough for pax but need some more coaches as it will be full from Hubli-Annigeri as lot of Labours use this train to come back Annigeri.

  
150 views
Yesterday (18:45)
Salaam Rocky Bhai~   5838 blog posts   371 correct pred (60% accurate)
Re# 4114413-26            Tags   Past Edits
Their is one train BZA-UBL pass which arrive GDG on early morning at 3.30am which was used to stop for one-half an hours at GDG as many railway departmental ppl use to travel in that train to reach their offices early morning. Some ppl took railway quarters at GDG and their work at Hubli divisional office and some other offices so for such ppl railways made that convinient timing but after its RSA with UBL-SBC train they making train to reach UBL early and it became uncomfortable for ppl but now they using SC-UBL exp which use to arrive GDG Before time around 5.30-5.45am and depart GDG around 6/6.10 to arrive UBL early but not before 7.30am which again delay for office goers but they are adjusting with it..

  
34 views
Today (10:47)
gurudatharao~   303 blog posts   4 correct pred (50% accurate)
Re# 4114413-27            Tags   Past Edits
The track doubling between Tolahunse and Mayakonda is completed and opened for traffic about a week back. But, in the time table of Hubli-Bengaluru trains (under tracks) it is still being shown as 'under construction'. I think it is not yet updated.
Page#    444198 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Dec 29
Trains with ARP 15 Dep on: Thu Jan 3
Trains with ARP 30 Dep on: Fri Jan 18
Trains with ARP 120 Dep on: Thu Apr 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4073462
    Dec 06 (12:50PM)


    There are some minor changes to the PNR Forum: 1. The main PNR feed will only show UN-predicted (by you) PNRs which are coming in. However, if there are replies, the PNR will show and will bubble to the top. Once you predict the PNR, it will go away from the main...
  • Entry# 4003283
    Nov 14 2018 (11:24AM)


    This is an advance notice of a new feature that will be introduced within the next couple of days. The feature is called "Spottings". . 1. Any time you see a train ANYWHERE - while railfanning, while travelling in a train, while visiting a station, seeing someone off, receiving someone, while your train...
  • Entry# 3710716
    Aug 14 2018 (11:04AM)


    This is regarding the appointment of Monitors. For TLMs, we require a minimum of 1000 Confirmed TLs. For FMs, we require members to promise to abide by the guidelines and be free of controversies. For other Monitors, we require the member to be in good standing. . However, "eligibility" does NOT always mean...
  • Entry# 3645007
    Jul 20 2018 (03:28PM)


    This is an advance notice of an upcoming change: 1. We shall be removing the Login/Forum section from the RailCal app as it is cumbersome, buggy and lacking in features. . 2. We shall soon be introducing a dedicated app called "Rail Messenger" for both Android and iOS, for all blogging/messaging purposes. The app...
  • Entry# 3644431
    Jul 20 2018 (12:42PM)


    The following changes are being made: 1. To restore the fun back to PNR Predictions, PNR Predictions will NOT be hidden anymore. PNR Predictions by members can be seen by ALL, before and after Charting. New members often look towards our expert predictors for hints, and we are reinstanting that. . 2. To better...
  • Entry# 3601043
    Jul 04 2018 (12:36PM)


    @all: While we do nominally allow multiple IDs, these multiple IDs are NOT allowed to engage in misuse and "mischief". Voting multiple times in the same poll using multiple IDs, rating each other IDs' blogs using multiple IDs, etc. are classified as "gross misuse". . This is an advance notice that some of the...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy