Pitlines in various Coaching Depots in West Central Railway Zone:
1. Bhopal Coaching Depot - 2 Pitlines
• Pitline-1 515m 23 ICF/20 LHB
• Pitline-2 340m 15 ICF/13 LHB
...
more...
2. Rani Kamalapati Coaching Depot - 3 Pitlines
• Pitline-1 690m 31 ICF/29 LHB Conventional
• Pitline-2 560m 25 ICF/23 LHB CAMTECH
• Pitline-3 580m 26 ICF/24 LHB CAMTECH
3. Itarsi Coaching Depot - 2 Pitlines
• Pitline-1 348m 15 ICF
• Pitline-2 232m 14 ICF
4. Bina Coaching Depot - 2 Pitlines
• Pitline-1 265m 12 ICF
• Pitline-2 340m 13 ICF
5. Kota Coaching Depot - 3 Pitlines
• Pitline-1 504m 22 ICF/20 LHB
• Pitline-2 580m 26 ICF/24 LHB CAMTECH
• Pitline-3 580m 26 ICF/24 LHB CAMTECH
6. Jabalpur Coaching Depot - 6 Pitlines
• Pitline-1 540m 24 ICF/22 LHB
• Pitline-2 540m 24 ICF/22 LHB
• Pitline-3 540m 24 ICF/22 LHB
• Pitline-4 540m 24 ICF/22 LHB
• Pitline-5 540m 24 ICF/22 LHB
• Pitline-6 540m 24 ICF/22 LHB
7. Rewa Coaching Depot - 3 Pitlines
• Pitline-1 580m 26 ICF/24 LHB CAMTECH
• Pitline-2 580m 26 ICF/24 LHB CAMTECH
• Pitline-3 580m 26 ICF/24 LHB CAMTECH (Under Construction)
Source: RTI filed by me
please wait...Translate to EnglishYo man, here's the lowdown on the pitlines at different coaching depots in the West Central Railway Zone:
1. Bhopal Coaching Depot has 2 pitlines:
- Pitline-1: 515m long, fits 23 ICF or 20 LHB
- Pitline-2: 340m long, fits 15 ICF or 13 LHB
2. Rani Kamalapati Coaching Depot got 3 pitlines:
- Pitline-1: 690m, can hold 31 ICF or 29 LHB Conventional
- Pitline-2: 560m, can fit 25 ICF or 23 LHB CAMTECH
- Pitline-3: 580m, fits 26 ICF or 24 LHB CAMTECH
3. Itarsi Coaching Depot sittin' on 2 pitlines:
- Pitline-1: 348m, fits 15 ICF
- Pitline-2: 232m, fits 14 ICF
4. Bina Coaching Depot rockin' 2 pitlines:
- Pitline-1: 265m, fits 12 ICF
- Pitline-2: 340m, fits 13 ICF
5. Kota Coaching Depot holding it down with 3 pitlines:
- Pitline-1: 504m, fits 22 ICF or 20 LHB
- Pitline-2: 580m, fits 26 ICF or 24 LHB CAMTECH
- Pitline-3: 580m, fits 26 ICF or 24 LHB CAMTECH
6. Jabalpur Coaching Depot keeping it real with 6 pitlines:
- Pitline-1: 540m, fits 24 ICF or 22 LHB
- Pitline-2: 540m, fits 24 ICF or 22 LHB
- Pitline-3: 540m, fits 24 ICF or 22 LHB
- Pitline-4: 540m, fits 24 ICF or 22 LHB
- Pitline-5: 540m, fits 24 ICF or 22 LHB
- Pitline-6: 540m, fits 24 ICF or 22 LHB
7. Rewa Coaching Depot rollin' with 3 pitlines:
- Pitline-1: 580m, fits 26 ICF or 24 LHB CAMTECH
- Pitline-2: 580m, fits 26 ICF or 24 LHB CAMTECH
- Pitline-3: 580m, fits 26 ICF or 24 LHB CAMTECH (Still bein' built)
Source: Info I got through an RTI request.
please wait...Translate to HindiBichalra mein pitlines:
1. Bhopal Coach Depot - 2 Pitlines
• Pitline-1 515m 23 ICF/20 LHB
• Pitline-2 340m 15 ICF/13 LHB
2. Rani Kamalapati Coach Depot - 3 Pitlines
• Pitline-1 690m 31 ICF/29 LHB Traditional
• Pitline-2 560m 25 ICF/23 LHB CAMTECH
• Pitline-3 580m 26 ICF/24 LHB CAMTECH
3. Itarsi Coach Depot - 2 Pitlines
• Pitline-1 348m 15 ICF
• Pitline-2 232m 14 ICF
4. Bina Coach Depot - 2 Pitlines
• Pitline-1 265m 12 ICF
• Pitline-2 340m 13 ICF
5. Kota Coach Depot - 3 Pitlines
• Pitline-1 504m 22 ICF/20 LHB
• Pitline-2 580m 26 ICF/24 LHB CAMTECH
• Pitline-3 580m 26 ICF/24 LHB CAMTECH
6. Jabalpur Coach Depot - 6 Pitlines
• Pitline-1 540m 24 ICF/22 LHB
• Pitline-2 540m 24 ICF/22 LHB
• Pitline-3 540m 24 ICF/22 LHB
• Pitline-4 540m 24 ICF/22 LHB
• Pitline-5 540m 24 ICF/22 LHB
• Pitline-6 540m 24 ICF/22 LHB
7. Rewa Coach Depot - 3 Pitlines
• Pitline-1 580m 26 ICF/24 LHB CAMTECH
• Pitline-2 580m 26 ICF/24 LHB CAMTECH
• Pitline-3 580m 26 ICF/24 LHB CAMTECH (Under Construction)
Source: RTI file mechanical doesn't know what it means