Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Oct 19, 2017 22:12:40 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Oct 19, 2017 22:12:40 IST

Blog Entry# 1121902
Posted: Jun 03 2014 (17:29)

No Responses Yet
  
06
Train Tip
Speed/Punctuality
0 Followers
3749 views
Jun 03 2014 (17:29)   22677/Yesvantpur - Kochuveli AC SF Express

monitvm   88 blog posts
Entry# 1121902            Tags   Past Edits
16561- 10-April-2014 KJM-KCVL
It was really a bad start to summer, following is the report
16561 arrived in KJM around 4:20 with Wap 22626, only 4 vacant berths in 1A, 13 in 2A and 40 in 3A.. Managed to board all my 6 luggage which include 2 laptops and one bag for each person. Noticed that our berths were filled up 4 luggage, one very big bag and 3 big bags and we hardly had space to push our luggage down, the lady in 35 and 36 as seen in the chart below
...
more...
was refusing to vacate the bags saying train is not your property and on, I complained to TTE he was also helpless. Even the regular attenders in this train also could not do anything as the lady was behaving extremely bad especially with my wife which I was forced record in my cell phone. She was behaving badly with even other passengers especially 2 very old ladies in next bay whom she abused with extremely bad words.
Finally running staff called me to PC and thru I think walky talky they contacted Bangarapet and arranged for police, and the whole issue was solved in about 15 mts Also the train had a halt of more than 20 mts in Bangarapet. Police people surrounded the coach.555 Also TTE and running staff asked me to move to a different place for some time as the lady was using extremely provoking words.
Initially 2 you youths travelling to Sabrimala refused to shift to A2 as they were not comfortable with lady behavior and finally at Bangarapet they agreed only because she was removed to different berths after discussions with TTE, running staff etc. Finally when I was shifted to A3 (31-34) with the help of attenders, also fresh bedding was given to us. Later after 15mts I came back to pick up my younger son's water bottle which we forgot to take from A2, could see 2 TTEs and an attender having heated debate with that lady.
Train was delayed by an hour in Salem, there was a halt of 40 mts in Tiruppatur bypass for 2 trains to pass and 20 mts halt at Samalpatti, till Coimbatore delay was around 40 mts and arrived in KCVL around 6:25 AM. Our coach A3 was Rajdhani liveried 13052, A2 10072 and A1 11055. H1 and PC were regular coaches 10005 and 10804

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Oct 29
Trains with ARP 15 Dep on: Fri Nov 3
Trains with ARP 30 Dep on: Sat Nov 18
Trains with ARP 120 Dep on: Fri Feb 16

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.