Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Aug 20, 2017 15:42:26 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Aug 20, 2017 15:42:26 IST

Blog Entry# 1955091  
Posted: Aug 08 2016 (09:35)

1 Responses
Last Response: Aug 08 2016 (09:35)
  
Rail News
0 Followers
460 views
New/Special Trains
Aug 06 2016 (08:46)   Suresh Prabhu’s Indian Railways looks to cash in on speed; here’s how
 

For Better Managed Indian Railways~   948 news posts
Entry# 1955091   News Entry# 276153         Tags   Past Edits
Suresh Prabhu turned around the populist logic of launching new trains in every rail budget by announcing new types of trains—Humsafar, Utkrisht Double-decker Air-conditioned Yatri (UDAY), Gatimaan and Tejas
Suresh Prabhu turned around the populist logic of launching new trains in every rail budget by announcing new types of trains—Humsafar, Utkrisht Double-decker Air-conditioned Yatri (UDAY), Gatimaan and Tejas—in this year’s railway Budget. Prabhu’s decision comes at a time when the purchasing power has improved and more people today prefer to fly, rather than take a train thanks to competitive airfares. So, it makes sense to launch faster trains that offer a greater degree of comfort to passengers, at a higher price. As if all that was not enough, there are the Suvidha
...
more...
trains where the base fares match the tatkal rates and prices will rise dynamically with every 20% increase in bookings with a cap at three times the tatkal rate. That’s smart as passengers start paying more for faster trains, it would over time help revive the fortunes of the Indian Railways where the operating ratio—operating expenses as a percentage of revenues—at 90.2% is expected to rise to 92% this year on an increased wage and pension bill after the Seventh Pay Commission award.
Most new trains that Prabhu plans will cater to short-distance travel. However, the railways is testing out Spain’s high-speed, lightweight Talgo train it expects to cover the 1,384- kilometres Delhi-Mumbai stretch in 12 hours against the current 15 hours 42 minutes. Humsafar, a totally 3AC train will make its debut in end-August while Tejas—with Executive Class and Chair Car coaches—that will have 22 features including entertainment screens for all passengers, water level indicators in bio-vaccum toilets, wi-fi and Braille displays is expected to make its debut in December. As things stand, fares on Tejas trains are likely to be 30% higher than on regular trains. Already higher fares have begun to kick in on the Gatimaan Express that covers the 188 kilometres Hazrat Nizamuddin-Agra Cantonment stretch in 100 minutes. Gatimaan charges R755 for a chair car seat (including R181 for catering), which is 47% more than the R515 (R90) that the Bhopal Shatabdi charges for a 117 minute run and more than double the R370 that the Taj Express charges for a 162 minute ride between the two cities. As more such trains are introduced, the demand for faster transport between cities will increase. But, unlike in the past, the Railways could end up being net gainers as revenues rise sharply.

  
965 views
Aug 08 2016 (09:35)
For Better Managed Indian Railways~   1933 blog posts
Re# 1955091-1            Tags   Past Edits
Unless there is drastic reduction in journey times as compared to Rajdhani/ Shatabdi trains, people are not going to pay significant premium for cosmetic changes or little more facilities. Tejas/ Humsafar/ UDAY etc are the ventures that are aimed for generating additional profits where as Antyoday trains will further bleed the IRlys due to higher cost than already over-subsidised general coaches.
Tejas/ Humsafar/ UDAY etc are the ventures that are aimed for generating additional profits where as Antyoday trains will further bleed the IRlys much more than ordinary coach jansadharan trains due to higher cost than already over-subsidised general coaches.
Unless
...
more...
there is drastic reduction in journey times as compared to Rajdhani/ Shatabdi trains, people are not going to pay appreciable premium for cosmetic changes or little more facilities. Poor occupancy of Gatiman is a recent example.
What significant facility Tejas can provide over the Gatiman is difficult to imagine. Tejas appears to be a rebranded shatabdi with some cosmetic addons and same speed 130kmph (and journey time). Why people will pay much higher is difficult to believe.
Garib rath was downward extrapolation (of fares) of Rajdhani ACIII class, where as Humsafar shall be upward extrapolation. Speed potential of all the 3 is same, so shall be journey times.
UDAY is just like acDD chair car trains which are not so successful even during day journey, its success during night journey is any body’s guess. Not a single DD runs with full length 24ICF or 21/22 LHB coaches.
Unless IRlys really go SHS i.e. 200kmph and drastically reduce the journey times, the concept of premium trains cannot work through Indian network. Only opportunity is on tourist destinations esp. involving foreign touristswho will be ready to pay extra for such cosmetic facilities ,which are they accustomed of. Tejas doing Mum-Ahm, NDLS CNB/LKO/ASR in 3-4 hours with higher fares will be a success rather than the current one with cosmetic changes only. Similarly Humsafar doing NDLS-BCT/HWH in 10 hrs.
The better option to earn more revenue is to charge for actual facilities with justification by creating appropriate classes of coaches/trains instead of continue plethora of trains like rajdhani, duronto, shatabdi, GR, Yuva, SK, Jan Shatabdi, Rajya Rani, Jansadharan, AC express, ac DD express etc in addition to standard S/F, M/E, Passenger.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Aug 30
Trains with ARP 15 Dep on: Mon Sep 4
Trains with ARP 30 Dep on: Tue Sep 19
Trains with ARP 120 Dep on: Mon Dec 18

  
  

Rail News

  • अब स्टेशन परिसर से ही प्लेटफार्म पर पहुंचेंगे यात्री  News Entry# 312403
    by: amishkumar48~  Today (14:55)


    भागलपुर। अब स्टेशन के अंदर प्रवेश किए बिना ही सभी प्लेटफार्मो पर पहुंचना संभव होगा। यात्री स्टेशन परिसर से ही एक से छह नंबर प्लेटफार्म पर आ और जा सकेंगे। इसके लिए स्टेशन के पूर्वी छोर के रेल ओवरब्रिज का विस्तार सर्कुलेटिंग एरिया (बाहर) की तरफ किया जाएगा। रेल ओवरब्रिज विस्तार...
  • रेलकर्मियों ने ही काटी थी पटरी, जोड़ने से पहले ही आ गई ट्रेन  News Entry# 312402
    by: ☆गोंडा इलेक्ट्रिक शेङ ■☆*^~  Today (14:53)


    यूपी के खतौली में शनिवार शाम बड़ा रेल हादसा हुआ. ट्रेन के कई डिब्बे पटरी से उतर गए. हादसे के बाद शुरुआती जांच में सिस्टम की घोर लापरवाही सामने आ रही है. इस बीच हादसे से जुड़ा एक ऑडियो सामने आया है. इस ऑडियो क्लिप में घटनास्थल से कुछ दूरी पर...
  • प्लेटफार्म पर लगेंगी स्वचालित सीढि़यां  News Entry# 312401
    by: amishkumar48~  Today (14:50)


    भागलपुर। डीआरएम ने निरीक्षण के क्रम में कहा कि जंक्शन के दो प्लेटफार्म पर स्वचालित सीढि़यां (एसक्लेटर) लगाने की कवायद जल्द शुरू कर दी जाएगी। इसके लिए मंत्रालय से स्वीकृति मिल गई है। निविदा की प्रक्रिया शीघ्र ही शुरू की जाएगी। स्वच्छता पखवाड़ा पर पहुंचे डीआरएम ने प्लेटफॉर्म पर बायो टॉयलेट...
  • 5 வருடங்களில் 586 ரயில் விபத்துகள்  News Entry# 312400
    by: sGs*^~  Today (14:37)


    கடந்த 5 ஆண்டுகளில் 586 ரயில் விபத்துகள் ஏற்பட்டுள்ளன. அதில் 53 சதவீதம் தடம்புரண்டு விபத்துக்குள்ளானது தெரியவந்தள்ளது.
    உ.பி., மாநிலம் முசாபர் நகரில் உத்கர் எக்ஸ்பிரஸ் ரயிலின் 14 பெட்டிகள்...
  • Rail connectivity unlikely before Aug 28  News Entry# 312399
    by: Biplob Kagyung~  Today (14:35)


    GUWAHATI, Aug 19 - Although restoration work is going on, many locations in the NF Railway network – like in Kishanganj, Katihar and Araria districts of Bihar – remain breached, and according to railway engineers, full connectivity cannot be restored before August 28.
    To...

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.