Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Nov 24, 2017 20:41:22 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Nov 24, 2017 20:41:22 IST

Blog Entry# 1956260
Posted: Aug 09 2016 (12:02)

1 Responses
Last Response: Aug 09 2016 (12:02)
  
The first air-conditioned local for Mumbai's suburban network, currently being tested at Central Railway's (CR) Kurla car shed, is turning out to be a disaster. The rake, which cost Rs54 crore to build, will require another few crores as it will have to be fitted with an inductor to control the undesirable "harmonics" in the rake.
Harmonics is an electrical term for spurious signals that create disturbances in electrical signals and can end up damaging control mechanisms and other software in the train.
According to sources, the order for an inductor has already
...
more...
been placed with the Netherlands-based firm Strukton Rail, which helped Indian power major Bharat Heavy Electricals Limited (BHEL) build the Train Control and Management System (TCMS) for the AC rake.
"The harmonics was playing havoc with the product and several functions of the train were not responding properly to TCMS commands. This included the doors, air-conditioning, voltage and so on. Every trick was tried to reduce these harmonics. It was finally decided that setting an extra inductor for the train was the only choice. It is a costly affair but there is no other choice," said a top-ranking railway official.
According to officials, if the inductor arrives by the end of August, dynamic trials – testing on tracks in real-time – can be carried out by the middle of September. Dynamic trials are expected to take at least till the end of November.
"It is possible that the rake will be commissioned only in the fag end of the year or may be in early 2017. It has lost a lot of time," said the official.
The rake was supposed to cost Rs43 crore when the layout was approved by the railway ministry in March 2014. It was finally finished two years later at a cost of Rs54 crore – a sizable 25 per cent increase in the construction cost. It arrived in Mumbai on April 5 and has been stabled at the Kurla car shed.

  
1758 views
Aug 09 2016 (12:02)
aakudev   32 blog posts   48 correct pred (70% accurate)
Re# 1956260-1            Tags   Past Edits
I think this is really a laid back attitude costing crores of rupees. Harmonics is a common term, should have been tested in the first place. End of the day public has to pay for the loss and delay through expensive tickets.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Dec 4
Trains with ARP 15 Dep on: Sat Dec 9
Trains with ARP 30 Dep on: Sun Dec 24
Trains with ARP 120 Dep on: Sat Mar 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.