The SBC-JTJ route has enough sheds nearby to provide loco links ( AJJ, ED, RPM) and the north bound route will be mostly served by LGD ( when it is fully electrified). Within SWR, better to have an ELS at UBL or ASK, as these routes have lesser frequency of interstate services and will mostly have to rely on SWR's own locos for links.