Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Sep 23, 2017 11:14:55 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Sep 23, 2017 11:14:55 IST

Blog Entry# 1976956  
Posted: Aug 31 2016 (11:24)

26 Responses
Last Response: Sep 01 2016 (14:16)
  
Rail News
0 Followers
3229 views
IR AffairsSR/Southern  -  
Aug 31 2016 (11:12)   Weak tracks force railway to introduce speed curbs
 

Hareesh Mangalam*^~   1190 news posts
Entry# 1976956   News Entry# 278646         Tags   Past Edits
Trains To Be Delayed, 238 Danger Spots
In a development that could severely impact the Onam rush, trains in the state will be delayed by at least 30 minutes each in view of the speed restrictions imposed for track repair works. It has come to light that tracks have to be replacedrenewed in at least 238 spots in the state and the works will take months.
Senior divisional commercial manager V C Sudheesh told reporters here on Tuesday that speed restrictions had been imposed at many points after the Karukutty train derailment on
...
more...
Sunday morning. Sources, meanwhile, said there were also chances of trains getting delayed by an hour, particularly during night and early morning.
“A preliminary investi gation has found that the derailment was caused by the delay in repairing the track at the spot. It has already been reported that tracks in at least 202 spots in Thiruvananthapuram railway division alone fall under the immediate removal category , which means they have to be replaced or renewed within three days. Else, the maximum speed at these spots will be restricted to 30kmph,“ a senior officer said.
It's learnt that these include over a hundred spots on the Shoranur Jn-Ernakulam stretch. There are 36 such spots in the Palakkad division. Sources said the decision to impose speed restrictions was taken by section engineers. We have been complaining about the poor condition of tracks for the past many years but there had no action from the higher-ups. A majority of these tracks are overused,“ said an official from the engineering department.
The All-India Railway Engineers Federation, meanwhile, alleged that it was the laxity of higher-ups in removing the flawed track that led to the Karukutty derailment. It said a senior section engineer was suspended from service to put the responsibility on junior-level officers. It also alleged that higher officials normally desisted from imposing speed restrictions to maintain punctuality, putting people's lives in danger.
Engineers have warned of more tragedies if immediate repairs are not taken.“At least 155km rails and related paraphernalia are required to be replaced. We will require months to complete the task but there is no other way,“ a senior engineer said.

21 posts - Wed Aug 31, 2016

  
1063 views
Aug 31 2016 (22:59)
One Mail~   5221 blog posts   1469 correct pred (71% accurate)
Re# 1976956-22            Tags   Past Edits
Not sure about that, trains like 12601 and MAQ ICE, reached 1hr late at MAQ, in that 1hour, 30 min been was added between SRR-MAQ section. As told before, Parasu, only 20min was added in that section. So not exactly sure whether it is because of TSR or other issue.
May be if someone travels in that section, it will give better idea. NTES can't be treated blindly, they might say train has reached on time, when it was late by 30min

  
1600 views
Sep 01 2016 (02:11)
selvamssm*^~   4743 blog posts   38 correct pred (49% accurate)
Re# 1976956-23            Tags   Past Edits
Funds needed for doing this work. Funds has to be released by IR.

  
1383 views
Sep 01 2016 (07:35)
6 Years of IRI*^~   9872 blog posts   497 correct pred (74% accurate)
Re# 1976956-24            Tags   Past Edits
Not exactly true. Even now SR gets 52kg rails instead of 60kg . MAS division completed 140 trials in its main routes but no funds were released later. There is a lack of man power , BBQ yard alone has 300 men shortage

  
1320 views
Sep 01 2016 (08:53)
Rail Fanning~   2755 blog posts
Re# 1976956-26            Tags   Past Edits
Agree that the toilet waste is also contributing badly in damaging tracks, but the introduction of bio toilets has also in fact affected travel inside trains with more stink, blocked loos, careless travellers throwing waste etc.
So there needs to be some way to balance both. There is no doubt that traffic has increased and resources deployed by railways is very less

  
1207 views
Sep 01 2016 (14:16)
One Mail~   5221 blog posts   1469 correct pred (71% accurate)
Re# 1976956-29            Tags   Past Edits
Blockage is mainly caused by travelers who threw away things in it. Unless, travelers are not made to understand, nothing can be done regarding this

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Oct 3
Trains with ARP 15 Dep on: Sun Oct 8
Trains with ARP 30 Dep on: Mon Oct 23
Trains with ARP 120 Dep on: Sun Jan 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2409730
    Sep 15 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.