Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Jul 28, 2017 08:31:31 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Jul 28, 2017 08:31:31 IST

Blog Entry# 2051442  
Posted: Nov 07 2016 (12:54)

12 Responses
Last Response: Nov 21 2016 (22:18)
  
General Travel
0 Followers
4578 views
Nov 07 2016 (12:54)   16590/Rani Chennamma Express

Waiting for UBL MAQ exp~   2193 blog posts   738 correct pred (70% accurate)
Entry# 2051442            Tags   Past Edits
Shocking updates by NTES !!!! I travelled in RC from UBL to SBC, it actually arrived SBC at 7:25, but NTES shows as 6:55; 30mins shift in arrival !!!
Though it ran well till ASK, then was made to stop at some station for 15mins to let a Goods train cross, then it halted at BAW for 15mins, YPR outer for 10mins, took 1hr 30mins from TK to YPR.

1 posts - Sun Nov 20, 2016

6 posts - Mon Nov 21, 2016

  
3046 views
Nov 21 2016 (21:49)
puneethpd   1398 blog posts   10 correct pred (91% accurate)
Re# 2051442-8            Tags   Past Edits
Nope ..I dint ask abt YPR tk..I meant between tumkur and arsikere isit completed

  
3028 views
Nov 21 2016 (21:51)
sbc15~   586 blog posts   224 correct pred (65% accurate)
Re# 2051442-9            Tags   Past Edits
Nope.. long way to go

  
2291 views
Nov 21 2016 (22:05)
Waiting for UBL MAQ exp~   2193 blog posts   738 correct pred (70% accurate)
Re# 2051442-10            Tags   Past Edits
At YPR Pf-2 is the main line towards SBC, Pf-3 is the main line while coming from SBC.

  
2977 views
Nov 21 2016 (22:09)
puneethpd   1398 blog posts   10 correct pred (91% accurate)
Re# 2051442-11            Tags   Past Edits
Thanks.. dats D problem then..if that is completed then travel distance between SBC ask can be covered in 2 hrs instead of 3 hrs n.more which is taking now

  
2792 views
Nov 21 2016 (22:18)
Waiting for UBL MAQ exp~   2193 blog posts   738 correct pred (70% accurate)
Re# 2051442-12            Tags   Past Edits
Yes, TK-ASK has become a bottle-neck in this route. The main reason for Harihar-YPR-Harihar ICE to have such a high run time & bad timings is because of too many crossings it has in this 100Km section.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Aug 7
Trains with ARP 15 Dep on: Sat Aug 12
Trains with ARP 30 Dep on: Sun Aug 27
Trains with ARP 120 Dep on: Sat Nov 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.