Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Apr 27 06:55:15 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 2052027
Posted: Nov 07 2016 (20:01)

4 Responses
Last Response: Nov 07 2016 (20:32)
Info Update
9384 views
2

Nov 07 2016 (20:01)   GHY/Guwahati (7 PFs)
guest
Entry# 2052027            Tags  
The 10-year ordeal Saraighat Bridge to open on 1st January’17
Link:click here
The long running construction of the Rs 346 crore, one-storey new Saraighat Bridge over the Brahmaputra River is to be completed by 31st December. The bridge, which will connect the river’s south and north banks, is expected to reduce the pressure of traffic on the existing Saraighat Bridge. The flyover at Jalukbari will touch the approach of the bridge and the existing roads. Currently, commuters travelling on the snarl-ridden stretch from Jalukbari to the existing two-lane Saraighat Bridge are facing a
...
more...
harrowing time. As stated by sources the problem will be solved from 1st January.
The construction activities of the bridge started in 2006 and because of numerous problems, it took Gammon India, the construction company engaged in the project, ten solid years to complete the construction. This is so far the longest single girder bridge in the country with a length of around 1,493 metres.
Contd......

Translate to English
Translate to Hindi

5025 views
0

Nov 07 2016 (20:03)guest
Re# 2052027-1              
@2052027-0  @guest
Obstacles faced in the initial stages

The implementation of the proposed bridge took over a year to initiate due to several hurdles and precautionary measures that had to be considered during the planning of the bridge. Construction of a new major bridge so close to an existing bridge was a very difficult task as far as sinking of the wells was concerned. Moreover, it has been constructed only 50 to 60 metres downstream of the existing Saraighat Bridge.
...
more...

Besides, an operating oil pipeline also runs very close to two new wells of the new bridge. Oil India Ltd. (OIL) had expressed inability to shift the pipeline considering many factors, including cost and time. However, all the problems arising out of such factors were handled successfully but consumed due amount of time that stretched close to two years.

According to reliable sources the design was made by IIT, Delhi and SPAN but there was a mistake in the design of the bridge which was later handed over to Mott Mc Donald Company Pvt. Ltd. for redesigning. “The total length of the bridge is 1,493.58 metres and comprises of a single girder which should otherwise have 13 girders. The cantilever construction method that has been used will form the continuous girder. The speciality of the bridge is that it is 50 to 60 metres downstream from the existing Saraighat Bridge and there is only a 24-metre gap between the two bridges which can be risky. But with the new technique and special protection the risk had been mitigated,” a highly placed source informed G Plus.

It was also mentioned that floods and high currents reduced the working period for the construction of the bridge considerably. Every year, the working period was reduced to only about six to seven months due to such factors.

Originally, only the main bridge and the grade separator were considered while planning the project. But later on, additional work of signal-free crossing at Jalukbari point was also added to the original scope of work as well as a flyover at the junction point of the road from Hajo. These increased the cost of the project considerably compared to what was estimated originally.

Now, while the major works related with the project are completed, railings, crash barriers, mastic, bituminous carpeting of the main bridge and flyovers, earth work and pavement works in the process of completion.

Rainfall activities during August and September last prevented the laying of bituminous carpet over the girders. Rains also hampered construction of the approach road and earthwork, sources said. The NHAI also faced problems of land acquisition, obtaining forest and environment clearances and shifting of public utilities like telephone and electricity poles which added to the delay in construction of the bridge.
Contd.....

Translate to English
Translate to Hindi

5167 views
0

Nov 07 2016 (20:05)guest
Re# 2052027-2              
@2052027-1  @guest
Construction minutiae

The bridge will be able to bear the highest prescribed load as per the Indian Road Congress specification. When asked to explain the uniqueness in its construction, sources said this bridge is made of a single girder, which is resting on eleven wells and two pile foundations on high bank – one on each of the banks of the Brahmaputra.
...
more...

When asked to explain the technique applied in constructing this single girder, sources said the girder was initially constructed as cantilever girders from each pier and then all ends of the girders were joined together to produce a continuous girder, sources said.

A common way to construct concrete cantilever spans is to counterbalance each cantilever arm with another cantilever arm projecting in the opposite direction, forming a balanced cantilever; when they are attached to a solid foundation, the counter balancing arms are called anchor arms. Thus, in a bridge built on two foundation piers, there are four cantilever arms, two of which span the obstacle, and two anchor arms which extend away from the obstacle. Because of the need for more strength at the balanced cantilever’s supports, the bridge superstructure often takes the form of towers above the foundation piers.

“The DPR suggested that there would be a reinforce earth in the main carriageway from grid separator to the approach which can be risky with the high seismic force. Therefore, shock transmission units have been fixed to block the seismic force. The design also suggested that the well should go up to -11 levels which is not safe and we decided to take it to -16 levels,” the source added.

The remaining work of reeling and crash bearer will be completed before 31st December including layering the bridge with bitumen. One of the most important features is that the Jalukbari Rotary will be signal free and will have interconnecting flyovers, one underpass and sleep road. The signal free crossing means that the vehicles coming from all the four directions will not collide with one another and can run in their own direction without having to halt. “A signal-free crossing has also been set up where there are three loops and ramps. The vehicles passing from each side can pass through the loop without hampering the traffic at any time,” the source added.

After the construction of this project, a major missing link in the state will be eliminated. Places like Baihata Chariali, Sipajhar, Mangaldai and a few others will become satellite townships of Guwahati, reducing the pressure on the city itself. Besides, a new green Guwahati can be created in the north bank housing an additional population of two lakhs with provisions of green industrial, commercial, educational and IT hubs that will make the city ready for the Act East Policy.
Contd....

Translate to English
Translate to Hindi

5298 views
0

Nov 07 2016 (20:05)guest
Re# 2052027-3              
@2052027-2  @guest
Construction time-frames elsewhere in India
Bandra-Worli Sea Link cost Rs. 16 billion bridge, is officially called Rajiv Gandhi Sea Link and was built by the Hindustan Construction Company. Construction began in 2000 and the first 4 of the 8 lanes were opened to the public on 30th June, 2009. All eight lanes were opened on 24th March, 2010.
Mahatma Gandhi Setu - the longest river bridge in India. Over the river Ganges it connects Patna to Hajipur. The construction of the 5,750-metre bridge began in 1972 and was inaugurated in May 1982.
Chatrapati
...
more...
Shivaji Maharaj Bridge in Nashik, Dwarka - 2nd longest road bridge in India. Construction began on 4th January, 2010 the 6.1 km bridge was approved by Atal Bihari Vajpayee in 2002 and was opened on 14th June 2013.
Vidyasagar Setu in Kolkata - the longest cable-stayed bridge in India. Links Kolkata with Howrah. Total length 823 metres, Vidyasagar Setu is the longest cable–stayed bridge in India. Construction began on 3rd July 1979, and the bridge was commissioned on 10th October 1992.
New Yamuna Bridge in Allahabad - 3rd longest cable-stayed bridge in India. Construction of the 260 metres bridge began in 2000 and was ready by the end of 2004.

Translate to English
Translate to Hindi

5202 views
0

Nov 07 2016 (20:32)guest
Re# 2052027-4              
@2052027-0  @guest
In The Pic You can see Red Hot LHB Train on the Old n Gold Mighty Saraighat Rail n Road Bridge but Which one of these
12235/36 DBRG Rajdhani
12435/36 DBRG Rajdhani
12423/24 DBRG Rajdhani
12519/20
...
more...
KYQ LTT AC Express
12551/52 KYQ YPR AC Express
Leave out
KYQ BGKT Express
KYQ SVDK Express
Which one of these is in the Pic

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy