Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Dec 16, 2017 16:56:42 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Dec 16, 2017 16:56:42 IST

Blog Entry# 2789903
Posted: Nov 19 2017 (20:34)

No Responses Yet
  
Info Update
0 Followers
497 views
Nov 19 2017 (20:34)   KGP/Kharagpur Junction (12 PFs)

Tushar Shandilya^~   4686 blog posts   9822 correct pred (72% accurate)
Entry# 2789903            Tags   Past Edits
SUCCESSFUL COMPLETION OF KHARAGPUR YARD MODIFICATION & COMMISSIONING OF NEW ELECTRONIC INTERLOCKING SYSTEM AT KHARAGPUR STATION AHEAD OF SCHEDULE TIME
The yard modification of Kharagpur and commissioning of New Electronic Interlocking System at Kharagpur Station of South Eastern Railway has been successfully completed with the reconnection of all signal gears with all block instruments at 18.15 hours. This is being so completed 1 hr 45 mints well ahead of target time i.e. 20.00 hrs today on 19th November, 2017.
Normal train services with the new signaling system have been resumed
...
more...
at 18.45 hrs. First goods train passed on signal operated from new control panel. The successful completion of entire work has been possible ahead of scheduled time only because of efficient deployment of a band of dedicated work force, proper planning and untiring efforts of staff and officers.
With the modification of Kharagpur Yard and commissioning of Electronic Interlocking System at Kharagpur Station the following benefits to railway operations and to the passengers will be made available which are as follows:
• Enhancing the number of routes from 423 to 800 thereby increasing fluidity.
• Ease of reception of freight trains to Kharagpur Yard thereby reducing transit time.
• Quicker implementation of Accident support system by enabling direct dispatch of Accident Relief Medical train/Van and Crane.
• Better fluidity due to commissioning of auto signalling between Kharagpur–Jakpur-Kharagpur.
• Adding two Platforms at Kharagpur station thereby enhancing passenger train handling capacity.
• Enhanced passage between Kharagpur-Gokulpur thereby easing train operation on Kharagpur-Midnapur route.
• Faster movement from/towards Howrah due to connectivity of 3rd line with Kharagpur yard.
Shortly Passenger Services will resume and will pass through this new signaling system.
Railway Administration expresses sincere thanks to the commuters for extending patience and co-operation to complete this modernization work successfully before schedule.
…………………
Source-Offical Facebook page of SER

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Dec 26
Trains with ARP 15 Dep on: Sun Dec 31
Trains with ARP 30 Dep on: Mon Jan 15
Trains with ARP 120 Dep on: Sun Apr 15

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.