Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Dec 13, 2017 11:03:28 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Dec 13, 2017 11:03:28 IST

Blog Entry# 2793973
Posted: Nov 20 2017 (20:25)

2 Responses
Last Response: Nov 21 2017 (20:11)
  
★  Info Update
0 Followers
1216 views
Nov 20 2017 (20:25)   HSR/Hisar Junction (6 PFs)

हिसार जंक्शन~   1235 blog posts   11 correct pred (58% accurate)
Entry# 2793973            Tags   Past Edits
Projects and their current status for Hisar Jn !
1> RE-HSR-JHL-LDH Electrification

i) Rewari-Manhru : Poles have been erected all over stretch while Rewari-Kosli stretch has been energized and commissioned
...
more...
ii) Manheru-Hisar : Poles have been erected till Hisar yard and wiring has been done till mentioned location.TSS work is slowly moving
iii) Hisar-Jakhal : Poles have been erected on total stretch and TSS is about to complete as there has been a notice come out from RVNL to energize the section with 25KV
iv) Jakhal-Dhuri-Ludhiana : This section has been put on halt as division comes with its objection in front of RVNL as Division have not changed the signals from Semaphores to MACLS
2> Hisar-Bathinda-SOG Electrification
Foundations has been constructed till Sirsa and continuing with good pace and also poles are being erected.
3> Coach Care Complex,Hisar
This project will be completed in three phases where Phase one work for CCC is about to complete which includes civil and mechanical work for washing line and Sick line shed.
4> Lift and Escalator on PF 1 and 4
Lift structure i.e. Civil work has been completed where as lift work is moving in slow pace
5> New F.O.B from PF 1 to PF 6
Work has been alloted and yet to be start

  
1021 views
Nov 21 2017 (18:35)
The Rail Mail™*^~   48030 blog posts   18568 correct pred (69% accurate)
Re# 2793973-1            Tags   Past Edits
Bhiwani Rohtak kab energize ho rha hai?

  
934 views
Nov 21 2017 (20:11)
हिसार जंक्शन~   1235 blog posts   11 correct pred (58% accurate)
Re# 2793973-2            Tags   Past Edits
Poles have been erected to entire stretch but wiring work is pending though TSS work being done with good pace

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Dec 23
Trains with ARP 15 Dep on: Thu Dec 28
Trains with ARP 30 Dep on: Fri Jan 12
Trains with ARP 120 Dep on: Thu Apr 12

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.