Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Sat Apr 21, 2018 00:28:10 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback

Blog Entry# 3206987
Posted: Mar 15 2018 (20:59)

16 Responses
Last Response: Mar 17 2018 (11:16)
  
Quiz
0 Followers
1487 views
15 votes
Mar 15 2018 (20:59)  

ksaravind37~   157 blog posts   2 correct pred (100% accurate)
Entry# 3206987            Tags   Past Edits
Generally new railway lines are constructed and are electrified at a later stage . Are there any lines which are electrified as and when they are built ?
( I dont know the answer )
ENDED
Yes . Give answer in comments87%13
No13%2

5 posts - Thu Mar 15, 2018

6 posts - Fri Mar 16, 2018

  
602 views
Mar 16 2018 (15:20)
Ban Neutrino Sterlite Allow Cauvery Save TN🙏~   3676 blog posts   24 correct pred (67% accurate)
Re# 3206987-13            Tags   Past Edits
But gc done in parallel with efication

  
613 views
Mar 16 2018 (15:37)
Saurabh®~   5039 blog posts   49 correct pred (72% accurate)
Re# 3206987-14            Tags   Past Edits
jbp nir gc

  
423 views
Mar 16 2018 (19:03)
Bina Jn~   2348 blog posts
Re# 3206987-15            Tags   Past Edits
Ab jitne bhi NL/GC ka kaam ho rha hai unme line install kerne ke sath sath electrification bhi kiya ja rha hai

  
310 views
Mar 16 2018 (22:22)
☆~   284 blog posts   1 correct pred (50% accurate)
Re# 3206987-16            Tags   Past Edits
LDH - sanehwal - sas nagar mohali - chandigarh
And
Udhampur - katra
Were electrified just after track building.

  
279 views
Mar 17 2018 (11:16)
HOG WAM4 WAP1~   3687 blog posts
Re# 3206987-17            Tags   Past Edits
MSB-VLCY MRTS line, MSB-TBM suburban lines. Both of these lines were electrified during their construction itself, and right from the day of inauguration, electric trains were operating on the lines. Some parts of the Mumbai suburban network were also electrified right from construction.
While many GC/NL projects are now being electrified during construction, the electrification is not necessarily compulsory for the route, and these new lines will start operating even if the electrification is not completed. Suburban lines are pretty much the only ones for which the electrification is an integral part of the construction.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue May 1
Trains with ARP 15 Dep on: Sun May 6
Trains with ARP 30 Dep on: Mon May 21
Trains with ARP 120 Dep on: Sun Aug 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.