the old rakes are sent to main repairs and the old coaches are sent back by them and the coaches after POH will be running in MAS Route and only 8% of the coaches has returned back. PGT and TVC cannot say anything since everything is in the hands of SR. Said to me by the Chief Mechanical Engineer ( Coach Depot TVC)