Trip Start Date: Today
Sudden acceleration boht jldi MPS attain kriЁЯШН
Dep bti 07 10
On Trip
Late: 29m late
RJMA/Rajomajra 3.3 km<--->2.6 km DUI/Dhuri Junction
Speed: 88 km/h
Doublig work is in full swing , RUBs under construction all the way
On Trip
Late: 31m late
CTW/Chhintanwala 3.4 km<--->4.2 km KKRL/Kakrala
Speed: 97 km/h
10 din pehle kuchh doubling work ni ho rha tha CTW pe ab fencing bhi ho gai and they are levelling now
On Trip
Late: 24m late
@ PTA/Patiala
Halted
Reached
Spotted at Platform#: 1