Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Wed May 1 00:06:09 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 4486521
Posted: Nov 12 2019 (21:42)

16 Responses
Last Response: Nov 22 2019 (16:51)
General Travel
8783 views
16

★★
Nov 12 2019 (21:42)   GDG/Gadag Junction (3 PFs) | UBL/WDP-4D/40517
SrinivasPappu~
SrinivasPappu~   4461 blog posts
Entry# 4486521            Tags   Past Edits
Window Trial Inspection Special led by UBL WDP4D Twins Departs Gadag Jn
Date : 08-11-2019 . It was an unexpected capture and this train went towards Solapur Side
click here
Translate to English
Translate to Hindi

12 Posts

3627 views
0

Nov 21 2019 (23:34)
Irshad13~
Irshad13~   8101 blog posts
Re# 4486521-13              
Yes deepak i know this and I discussed same plan some months back on IRI. From beginning itself when they stopped Hubli double line from Binkadkatti side at Gadag outer on left side that time I guess they take that line to join present single line of Gadag Hubli and new double line they join to Gadag Bijapur line and two new lines they construct for Gadag Hotgi doubling.. You are 100 % right and I said u previous also that Gadag Yard and outer works will be last part to complete Hubli Hospet doubling as they have to plan about Gadag Hotgi doubling also and it will be good if they consider Gadag yalavigi new line planning from now itself by leaving some space on Hospet side outer of Gadag.. Still Gadag New Bypass line and New Station on Bijapur route to join bypass line and lot of works are...
more...
pending which takes lot of time. Their priority is now to construct atleast one new line and make it as Gadag Bijapur line and present Line to join Hubli doubling line by which they can commission doubling of Binkadkatti Harlapur..

Translate to English
Translate to Hindi

3230 views
1

Nov 21 2019 (23:45)
Irshad13~
Irshad13~   8101 blog posts
Re# 4486521-14              
Yes good video.. Thanks for sharing.. Yup for better arrival and departing of trains 4 tracks are necessarily needed.. They have lot or space on Bijapur line side compared to another side so such plan they implementing.. I can even see new FOB extended on another side of PF 2-3 considering of future New PF 4-5 by demolishing those Railway offices, that old SCR YDM loco shed walls, over head water tank and big sad thing is cutting those trees ЁЯМ▓ЁЯМ│ЁЯМ┤ which are very old and I use to see them in my childhood at the age of 6 to 7 years.. Everything has changed except those old trees which are my memorable moments.. Railways should not cut them but instead plan PF in such a way to include then in between new PF 4-5.
Translate to English
Translate to Hindi

3402 views
0

Nov 21 2019 (23:53)
Irshad13~
Irshad13~   8101 blog posts
Re# 4486521-15              
Also one thing I observed in your video that new line which u covered will run until passing ROB up to km 55 and after that they stop it. So I think that is new Bypass line which going to join Bijapur line with new small station on Gadag Bijapur line. And present line on which train was running will join to Present single line of Bijapur and one more double line on another side which u not covered will join to present single line of Gadag Hubli.. Like this 4 outer lines get ready and also one bypass line.. They left still much gap between ROB considering future plans of new lines pass below ROB..
Translate to English
Translate to Hindi

3337 views
0

Nov 22 2019 (10:52)
DeepakUlli~
DeepakUlli~   2929 blog posts
Re# 4486521-16              
GDG 4-5 PFs plan ??? ..Good if this happens . .. look like commissing of Binkadakati -GDG doubling takes still some time instead of waiting for it at least they should do CRS for Harlapur -GDG doubling.. also UBL by pass line will be part of UBL-HPT doubilng or GDG -HG doubling ? if it is ubl part it will done quickily i think if it is HG part will be delayed..
Translate to English
Translate to Hindi

3257 views
1

Nov 22 2019 (16:51)
Irshad13~
Irshad13~   8101 blog posts
Re# 4486521-17              
1. New PF plan for GDG was done long back for that those Railway offices will be demolished. But i think still it will take more time to construct.
2. Yes they should atleast Commission Gadag Harlapur stretch but may be still they have some works left at Gadag outer towards Hospet.
3.UBL bypass already done up to that ROB after ROB that line diverts towards Bijapur line so for that a small station to be constructed on GDG HG line which will take still more time..
Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy