-- Check the route between Yeshwanthpur and Hosur . Trains can't come from YPR to SBC and move towards BNC. It should enter the Mysore Line and then LR should be done. So take it through Banaswadi.
-- Remove halts at Tumkur, Birur, and Harihara
-- Add halt at Davanagere