Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Bookmarks
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  

Mumbai Local - RailFanning nirvana.

Full Site Search
  Full Site Search  
FmT LIVE - Follow my Trip with me... LIVE
 
Sun Oct 24 11:43:42 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips/Spottings
Login
Post PNRAdvanced Search

Blog Entry# 4630547
Posted: May 18 2020 (23:40)

21 Responses
Last Response: May 21 2020 (19:04)
Info Update
★★★
May 18 2020 (23:40)   DDU/Pt. DD Upadhyaya Junction (Mughalsarai) (8 PFs) | SRE/WAG-12B/60027
🙏🚩 जय जय भैरवी असुर भयावनी 🚩🙏
KhagariaJn^~   55657 blog posts
Entry# 4630547            Tags   Past Edits
ELF Madhepura (Bihar) Made First WAG12B (12000 HP) loco operation started on DDU division today. The train departed from DDU with WAG/12B-60027 at 14:08 hrs in long haul formation for DDU-BRWD section of DDU and DHN divisions of ECR.

________________________________________________

The
...
more...
much-awaited WAG-12 locomotive has been commissioned into revenue service by the Indian Railways. A long-haul train was worked by this locomotive in Mughalsarai division. The locomotive has been allocated a block of road numbers starting from 60000 onwards.

Based on the Prima Kz8A platform, the Alstom manufactured locomotive is primarily meant for service on the Eastern Dedicated Freight Corridor (EDFC). However, with the DFC not commissioned fully yet, the WAG-12 will operate on the IR network.

WAG-12 has two variants; The first model was the WAG-12A, of which only one unit has been manufactured. This design experienced issues with ride quality, which resulted in major modifications to the suspension and the bogies.

The final design, now known as WAG-12B, has been approved by the Indian Railways. This design is now heading for serial production at the new factory set up at Madhepura in Bihar.

________________________________________________

⏩ Technical Specifications of the WAG-12B

🔹️ Axial Arrangement :- Bo-Bo (For each of two units)

🔹️ Number of Axles :- 8

🔹️ Mass of Locomotive :- 180 Tons [Upgradeable to 200 Tons]

🔹️ Length :- 19,200 mm per unit ; 38,400 mm total length

🔹️ Centre-To-Centre Distance Between Bogies :- 10,200 mm

🔹️ Maximum Speed :- 100 km/h [Upgradeable to 120 km/h]

🔹️ Continuous Speed :- 60 km/h

🔹️ Max Load Haulage :- 6,300 tons, 1:150 Gradient, 60 kph for 25 Ton Per Axle Variant

🔹️ OHE Voltage :- Nominal: 22.5 kV, 50 Hz

Maximum: 31 kV

Minimum: 17 kV

🔹️ Traction Power (Continuous Rating) :- 9,000 kW (12,069 hp approx)

🔹️bMax Starting TE at 25t Axle Load / 22.5t Axle Load :- 785 kN / 705 kN

🔹️ Braking Effort :- 563 kN

🔹️Max Braking Effort :- 79.315 kN per motor

🔹️ Stopping Distance :- 900 metres: 100 kph to 0 kph

🔹️ Remote Multiple Unit Operations :- Yes, 2 Locomotives

🔹️ Traction Motor :- Asynchronous, Nose Suspended

🔹️ Maximum RPM :- 2,711

________________________________________________

⏩ New Features on the WAG-12

1️⃣ Two units (A and B) permanently coupled to each other. Both units only have cabs on the outward-facing ends.

2️⃣ Both units will be controlled from the working cab.

3️⃣ While both units will be provided with one pantograph each. However, only one pantograph will be raised at a time and will feed power to both the units through a high-tension overhead link.

4️⃣ Both units have been provided with a toilet for the crew.

5️⃣ The units are connected to each other through a vestibule and gangway.

6️⃣ A major departure from existing designs of locomotives is that high voltage apparatus like the vacuum circuit breaker is now inside the body of the locomotive in a special cubicle. The roof of the locomotive is almost empty except for the pantograph.

7️⃣ This locomotive has a larger wheel diameter, compared to other freight locomotives in service on the IR.

8️⃣ This locomotive also features the much-awaited ‘Brake Blending’ facility. If regenerative braking (AKA electric or Electro-Dynamic brake) is applied and found insufficient, a proportionate quantum of the pneumatic brake is applied simultaneously by the locomotive.

9️⃣ To improve reliability, almost all hardware switches and controls are replicated on the DDU (Driver Display Unit). Thus, several functions can also be controlled using ‘Soft Keys’.

🔟 A dehumidifier for air intake ensures that only dry air is used for cooling and ventilation systems. This will improve equipment life and insulation.

1️⃣1️⃣ An automatic flap system regulates the entry of air into the locomotive’s ventilation system and ensures uniform flow in various conditions.

1️⃣2️⃣ Tube drive equipped with self-aligning roller bearings for better suspension.

________________________________________________

⏩ Differences Between WAG-12A and WAG-12B

Limitations of the original WAG-12 design resulted in modifications and the WAG-12B variant. Here are the key differences between both types.

(WAG 12 / WAG 12 B)

1️⃣ Total Length :- 35,000 mm / 38,400 mm

2️⃣ Bogie Design :- Flat solebar / Gooseneck or handlebar shaped solebar

3️⃣ Traction link coupling between the bogie and body :- Below the driving cab / Turned around and now provided in the middle of the body

4️⃣ Center to center distance between the bogies :- Lower (8,500 mm) / Higher (10,200 mm)

________________________________________________

Article Link :-

click here

________________________________________________

Picture Source :- click here

click here

/news/post/407830

click here

click here

/news/post/408571

click here
click here
Others are from Twitter Pvt.

13 Public Posts - Tue May 19, 2020

5 Public Posts - Wed May 20, 2020

3 Public Posts - Thu May 21, 2020

COVID-19

ONLY COVID-19 Specials are running.
As Corona cases are increasing rapidly, Members are advised to TAKE extra CARE these days.
1. AVOID going outdoors even if lockdown is easing.
2. ALWAYS wear a MASK when OUTDOORS.
3. Wash hands frequently. Do NOT touch your face.


REMEMBER: PREVENTION is the ONLY Option. There is NO CURE.

Leading Polls

Top Trending Posts

5101182 ★★★ 33MeghaSyam^~
5101792 ★★★ 39eXplorerDKG^~
5045530 ★★★ 53tanu1995^~
4270789 ★★ 22IrfSda94~
5097338 ★★★ 24SBC~
5101937  10BangaloreMail^~
5100523 ★★★ 104moderator^~
5101989 ★★ 13Hrishi7987^~
5025120 ★★ 21IrfSda94~
5097579 ★★ 18Sandeepkc
4018531 ★★★ 46IrfSda94~
3980295 ★★★ 36IrfSda94~
5090283 ★★★ 28Deepanjan~
5101205  9ayushkamal^~
5101695 ★★ 13Prometheus~
5101402 ★★ 12Vaibhav^~
5101977  8Hrishi7987^~
5101078  7Gokul_Bas~
5101894  9SairajShankar~
5101655  7Pradeepkulkarni~
5101529  7rohanpaul^~
5101550  9AshwanAchu~
5100491 ★★ 15Kamlesh telang~
5102087  6Prometheus~
5100177 ★★ 14RamganjMandi^~
5101932  6SSPOs~
5101381  6Haryanvi~
5101756  8RKrishnan^~
5101846 ★★★ 38railfan^~

Rail News

New Trains

Site Announcements

  • Entry# 5093784
    Oct 13 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
  • Entry# 4785432
    Nov 21 2020 (02:51AM)


    We are unifying the Bookmark scheme for Blogs & PNRs. Previously, we had different systems of "Followed Blogs", "PNR History", "My PNR Posts", "My PNR Post Predictions", "Stamp Alerts", etc. which were somewhat confusing. Hereafter: For PNRs: 1. You may add ANY PNR to your bookmarks through the "Add Bookmark" link in the...
  • Entry# 4680754
    Aug 03 2020 (10:10PM)


    In the next few days, we shall introduce a "Personal Gallery". This will consist of your own personal pics - no restrictions. You can upload any number of pics to your personal gallery - with with or without trains. This personal gallery will be part of your Member Profile. Thanks.
  • Entry# 4671643
    Jul 18 2020 (11:53PM)


    As our Topics & Quiz section gains popularity, the following change will be made to Quizzes. Starting tomorrow, we shall not reveal the names of people who answered correctly/incorrectly. You will still know how many answered the quiz and the percentage of wrong/right responses. But ONLY the person who answered will know...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy