What i thought with this train, the same is proposed in IRTTC 2020.
TT is revised and this train will run at 130kmph between PRYJ and ALJN with reduced stops. (Stops at FTP, CNB,ETW,TDL,ALJN rest all same as before between ALJN and DDN)
4 LHB coaches required with 12 coaches each.
Total 16 hrs time will be elapsed between PRYJ and DDN now....
more... And 17hrs 10 min between DDN and PRYJ.