Yes that is the exact same thing that I am trying to say here that Sumitra Tai and Nagesh Namjoshi Ji never care about the type of demand and availability of slots for trains they just demanded trains and make them approved by hook or crook that leads to these poorly time tabled or bad route trains. They were so high on ego that they never considered the technical limitations of some of the demands like Amarkantak, Nanda Devi, Chambal etc they just ask for extension as if Indore has 20 platforms and 6 main lines in its vicinity. The only good trains I can remeber Indore got in those times are Indb-Kcvl, Indb-Uhp, Indb-Ypr and Indb-Dee. Rest all trains are very under performing. I know that Indore needs a train to Raipur but for that asking the extension of Amarkantak is just ignorance towards the passenger of Bhopal. For that...
more... the best that we can do is introduce a new Superfast train between Indore/Dadn-BSP via BPL,ET,MML,NIR,BTC,G,R it will be very successful and can cover so many demands in 1 go
Indore to Raipur connection along with MML-NIR-BTC section to Bhopal as well as Indore, no need of separate trains for this section which is in demand right now.
It will act as alternative of Amarkantak and Narmada for passengers of Bpl-Jbp sectionand will shed down some load from these trains, and for saving time for 3 LRs IR can operate this with Push-Pull arrangement this will also benefit in covering the ghat/elevated sections of BPL-ET, MML-NIR-BTC too.