There is also a possibility of diverting Mannai express via TVR, and splitting it as MS/MQ and MS/VLKN at TVR itself. Once the train reaches TVR from MS, VLKN slip will be detached, MQ slip will proceed and another Loco will pull the VLKN slip on the opposite direction.