Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jul 26, 2017 02:35:58 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jul 26, 2017 02:35:58 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Blog Posts by rajannair1975
Page#    3 Blog Entries  
  
★  General Travel
0 Followers
2486 views
Jun 23 2015 (19:04)   12431/Thiruvananathapuram Central - Hazrat Nizamuddin Rajdhani Express
 

rajannair1975   5 blog posts
Entry# 1522005            Tags   Past Edits
TVC Rajdhani Food is very bad. Tea is very pathetic. Monsoon timetable 2nd day lunch also very pathetic. date : 20th June 2015. i had traveling last week from TVC to NZM but i am very unhappy condition of the train. please see the food condition in the train.
Lunch photo @ Rajdhani 2nd day.

6 posts - Tue Jun 23, 2015

1 posts - Wed Jun 24, 2015

  
825 views
Jun 24 2015 (10:40)
rajannair1975   5 blog posts
Re# 1522005-8            Tags   Past Edits
Only Dal and Biryani

  
1143 views
Jun 24 2015 (10:50)
rajannair1975   5 blog posts
Re# 1522005-9            Tags   Past Edits
Railway serve everyone "Only Dal and Biryani"............

  
1163 views
Jun 24 2015 (11:06)
Sudeesh~   1735 blog posts
Re# 1522005-10            Tags   Past Edits
Nowadays 12431/32 is becoming really pathetic in terms of food and cleanliness. The quality of food is become worse day by day and there is nobody to check or to maintain the quality. Last time when i travelled the same thing happened and i gone to pantry car and complained about the same. After that also nothing happened. Rather than that the pantry staff used to demand tips when we are reaching our destination.
In this case the lunch served is not an extra one as the schedule of the train has changed due to monsoon time table. So they have to serve us the proper lunch and also evening tea and snacks. These things are happening because of the game
...
more...
by NR officials and the Pantry Contractor.
The least maintained Raj is TVC Raj

  
1219 views
Jun 24 2015 (14:45)
brandonbuffard^~   11460 blog posts   6225 correct pred (68% accurate)
Re# 1522005-11            Tags   Past Edits
even in radhani exp...

  
989 views
Jun 24 2015 (18:16)
Er AC*^~   6503 blog posts   55712 correct pred (72% accurate)
Re# 1522005-12            Tags   Past Edits
Generally, while such types of trains run late, on behalf of Railways/ IRCTC we are provided with complementary lunch/ dinner....in those cases, only daal-chaval/roti along with pickle are provided....not vegetables....thus I am asking.....

1 posts are hidden.
TRIP HAS ENDED.
Blog  Time-Table

  
1140 views
May 23 2015 (18:52)
KMonIRI*^~   3777 blog posts   63757 correct pred (74% accurate)
Re# 1479822-1            Tags   Past Edits
Train Status TRAIN CANCELLED
Chart NOT Prepared
  
General Travel
0 Followers
851 views
May 04 2013 (13:47)   12432/Hazrat Nizamuddin - Thiruvananthapuram Central Rajdhani Express
 

rajannair1975   5 blog posts
Entry# 742404            Tags   Past Edits
The Konkan Railway – Facts and Figures
The Konkan Railway is a 738 km long single line non-electrified Broad Gauge Railway with design speed is for 160 kilometers/hour, though no trains run that fast on this line. The fastest train on the line is the H.Nizamuddin – Thiruvananthapuram Rajdhani Express which touches 110 kmph on some stretches. The main locomotives doing duty on the line are the WDP4, the WDG4, WDM3A, WDM3D, WDP3A, the WDM2 and its variants. The line has 59 stations with a depot at Verna and yards at Madgaon. It has 91 tunnels totaling 83 kilometers with the longest tunnel being the Karbude tunnel at 5.6 kilometers long. It has 1998 bridges (179 major bridges and 1819 minor bridges)
...
more...
spanning rivers, streams and other waterbodies including the Mandovi, Zuari and Sharavati rivers. The bridge across the Sharavati is also the Konkan’s longest at 2085.4 m. The Konkan Railway also boasts of the 64 meter tall Panval Nadi Viaduct near Ratnagiri, the second highest bridge in Asia, a visible example of the ingenuity of the line and the dedication of the builders. It connects two hills and has 12 spans and10 pillars, 6 of which are taller than the Qutub Minar! If you want comparisons, here is one of he pillars as seen where it meets the ground. The train leaves a tunnel, runs straight onto the viaduct which then runs right into the next tunnel! The KR route closely follows the NH-17 and the alignment seems to be chosen to be near the highway at all times. No point on the Konkan Railway track is more than 22 kilometers away from the highway, and on an average the line is within two to five kilometers of the highway. It crosses the highway at numerous points. (The NH-17 is no less a driver’s delight. Watch out for those trucks and Volvos though)
The track passes though a geologically sensitive region with heavy rainfall and frequent landslides, floods etc, so disruptions in service during the monsoons are commonplace even with all the technologically superior safety checks in place. In fact, KR is the only railways in India with a “monsoon timetable” for the monsoon months when trains are run at reduced speed and possibly during the daytime with increased caution due to the volatile nature of the terrain. Sadly, there have been two fatal accidents on the line, once in 2003 when a holiday special derailed after a landslide fell on it killing 51 and once in 2004 when the Matsyagandha Express derailed after hitting boulders which fell on the track killing 14. Every year during monsoons some issue happens on the line and services get suspended with trains getting rerouted.
Page#    3 Blog Entries  

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Aug 5
Trains with ARP 15 Dep on: Thu Aug 10
Trains with ARP 30 Dep on: Fri Aug 25
Trains with ARP 120 Dep on: Thu Nov 23

  
  

Rail News

  • पीएम जी, रोजाना चलवाइए बापूधाम एक्सप्रेस  News Entry# 309488
    by: Varuna Express  Yesterday (23:54)


    वाराणसी : 'प्रधानमंत्री जी, हम लोग काशीवासी हैं। काशी को गोरखपुर, कप्तानगंज, बगहा, मोतिहारी और मुजफ्फरपुर को जोड़ने वाली एक ही ट्रेन बापूधाम एक्सप्रेस है। इस पर सवार होकर हजारों मरीज पूर्वाचल के एम्स बीएचयू के लिए आते हैं। यह ट्रेन सप्ताह में तीन दिन चलने के कारण जनता को अपार...
  • बारिश से डूबी पटरियों पर उतराया रेलवे का प्रबंधन  News Entry# 309487
    by: Varuna Express  Yesterday (23:47)


    वाराणसी : कैंट स्टेशन की ड्रेनेज व सफाई व्यवस्था की सोमवार की झमाझम बरसात ने ऐसी थाह ली कि पानी में डूबी पटरियों पर रेलवे का प्रबंधन उतरा उठा। प्लेटफार्म एक से पांच तक की रेल पटरियां बारिश के पानी में डूब गई। जलजमाव से परेशान यात्रियों ने रेलवे की लचर...
  • इटावा से मैनपुरी होते हुए फर्रुखाबाद तक चलेंगी ट्रेनें  News Entry# 309486
    by: Rkschauhan~  Yesterday (23:37)


    रेलवे के इलाहाबाद मंडल के डीआरएम पंकज झा ने शुक्रवार को टूंडला से शिकोहाबाद, फर्रुखाबाद, मैनपुरी रेलवे स्टेशनों का निरीक्षण किया। इसके बाद वे स्पेशल ट्रेन से इटावा पहुंचे। यहां पत्रकार वार्ता में उन्होंने बताया कि इटावा से मैनपुरी होते हुए फर्रुखाबाद तक ट्रेनें जल्द चलाई जाएंगी। इस पर विचार चल...
  • GST to raise Metro construction cost in Kolkata | The Indian Express  News Entry# 309485
    by: IR no more Safe^~  Yesterday (23:11)


    The Goods and Services Tax (GST), which subsumed all indirect taxes and was implemented from July one this year, is likely to raise the construction cost of East-West Metro being constructed by Kolkata Metro Rail Corporation (KMRC). KMRC managing director, Satish Kumar said “GST will definitely raise the construction cost. But...
  • Work on Mahakaran stn to start on Wednesday | Kolkata News - Times of India  News Entry# 309484
    by: IR no more Safe^~  Yesterday (23:09)


    Kolkata: The Mahakaran station site is likely to be handed over to Kolkata Metro Rail Corporation (KMRC), the executing agency of East-West Metro, on Tuesday evening. The process of cordoning off the site for the construction of the station will start on Wednesday.
    "There...

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.