Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Sep 26 01:46:12 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Description/Uses/Merits of this ΣChain
MUMBAI BANDRA TERMINUS MUMBAI DIBRUGARH

16992/Σ MUMBAI BANDRA TERMINUS MUMBAI DIBRUGARH ΣChain


Created: Oct 23 2013 (16:20) by pcyadav^~

Change Departure Station:
Change Arrival Station:

11
PNR    Forum    Time-Table    Availability    Fare Chart    Trips    Gallery    

ΣChain Blog

Page#    Showing 1 to 5 of 1142 blog entries  next>>
Rail News
12525 views
0

IR Affairs
NER/North Eastern
Sep 19 (00:56)   Gonda Train Accident: Engineering Department Blamed, Keyman Dismissed for Revealing Technical Glitch

Ehtram Husain~   10630 news posts
Entry# 6194345         Tags   Past Edits
Gonda Train Accident: गोंडा रेल हादसे से पहले लाइन में तकनीकी गड़बड़ी बताने वाला कीमैन बर्खास्त, रेल आवास वापस करने का निर्देश

A preliminary investigation report into the Gonda train accident has revealed that the accident was caused by a fault in the railway line. The Commissioner of Railway Safety (CRS) released this report after a thorough 50-day investigation. The report blames the engineering department for the track malfunction and the operational department...
more...
for negligence. Before the accident, a junior engineer had informed the keyman about a technical glitch in the railway line between Motigunj and Jhilahi stations. This conversation was recorded and shared on social media, leading to the keyman's dismissal by the railway administration. The keyman has been dismissed from service for revealing this information to the media without proper authorization, though some believe the dismissal was an attempt to cover up negligence by higher officials. The CRS report also criticizes the operational department, claiming the station master did not react swiftly enough to take control of the situation.

Gonda train accident ki primary jaanch report mein khulasa hua hai ki accident rail line mein khami ke karan hua tha. Railway Safety Commissioner (CRS) ne 50 dinon ki gahan jaanch ke baad yeh report jaari ki hai. Report mein engineering department ko jimmedar theraate hue kaha gaya hai ki track...
more...
mein gadbadi thi. Saath hi parichalan department ko bhi laaparvahi ke liye jimmedar theraaya gaya hai. Gonda train accident se pehle hi, junior engineer ne Motigunj-Jhilahi station ke beech rail line mein technical gadbadi bataana railway ke keyman ko bhaari pad gaya hai. Internet media par keyman aur junior engineer ke beech baat-chit ka audio prasarit hone se khaar khaye railway prashasan ne keyman Aasne ko barakast kar diya. Saath hi saare rail sampatti aur rail aawas waapas karne ka disha-nirdesh jaari kar diya hai. Keyman ki barakastgi ko lekar karmachari sangathanon mein rosh hai. CRS report mein yeh bhi bataya gaya hai ki station master ne train ko control mein lene mein jaldi nahin dikhayi.
Info Update
177641 views
1

Apr 01 2023 (21:45)   19037/Avadh Express (PT) | BDTS/Mumbai Bandra Terminus (7 PFs)
guest
Entry# 5682331            Tags   Past Edits
Please Add HA-1 Coach In The Train Coach Composition From 01 April 2023 From BDTS
Translate to English
Translate to Hindi
General Travel
191007 views
13

★★
Dec 26 2023 (13:07)   19037/Avadh Express (PT)
guest
Entry# 5923189            Tags   Past Edits
4 compliments
Useful _/\_:sleeper udao garibo ko hatao yojna Useful _/\_:I'm used to it
If you have to make reserv class to "general" class then dn't take money for reservation???how ladies can go to washrooms in this situation?? Very bad experience in 19037 avadh express there is more then 250 peoples in 65 seats of sleeper class...
Translate to English
Translate to Hindi

17 Posts

111491 views
2

Dec 26 2023 (21:39)
SekarMadras~
SekarMadras~   936 blog posts
Re# 5923189-18              
1 compliments
Agree
@5923189-17  @guest
click here

Yes see the above.
Translate to English
Translate to Hindi

114461 views
2

Dec 26 2023 (22:08)
Mridul^~
Mridul^~   47222 blog posts
Re# 5923189-19              
Even revenue will increase if they will convert all GS coaches into 2S.

They say that Sleeper and GS coaches are loss making then why they do not allot 50% of seats in these coaches in dynamic pricing so that cost can be recovered with high fare.

Airplanes
...
more...
can never be a preferred mode of travelling inside dense populated country like India.

Allowing high GNWL is not a problem of IRCTC because it is upto passengers if they want to donate cancellation charges to Indian Railways but IF just like COVIDD days, they ensure that ticketless passengers or fully waitlisted passengers cannot enter station premises then issue can be resolved.

UR coaches should be present only in MEMU/EMU/DEMU and Passenger trains.

Translate to English
Translate to Hindi

112745 views
0

Dec 26 2023 (22:49)
SaurabhDubey^~
SaurabhDubey^~   30388 blog posts
Re# 5923189-20              
No, you misread my post. I am mentioning about local trains running with ordinary fare pre covid times. Now when they are running with M/E fare(nearly twice of ordinary fare0 with same TT under the garb of Express special, where is the 43% subsidy now.
Translate to English
Translate to Hindi

105561 views
2

Dec 27 2023 (02:50)
LHB_for_18047~
LHB_for_18047~   11187 blog posts
Re# 5923189-21              
Certainly airplanes can be a preferred mode for transport in India atleast for long distance travels as more and more airports do come up. And it's these long distance trains which mostly face overcrowding and terrible delay problems.
GNWL is definitely a problem of IRCTC in my opinion just because people keep on booking does not mean they should allow it. While it's agreeable that most Indians lack basic civic sense as they see it as their right to travel irrespective of the fact that they are illegally entering the reserved coaches with non confirmed tickets and are causing nuisance to the ones travelling with confirmed tickets. But here Railways have the responsibility to ensure that the confirmed ticket holders have
...
more...
a safe secure and comfortable journey so it's their responsibility to see to it that only confirmed ticket holders travel and for RPF to control around 100 unauthorised people in a single coach would be too much it's an uncivilized mob out there who can even throw the on duty officer out of the moving train. So better Railways restrict them while booking itself. Unreserved passengers can be almost completely avoided by reserving the GS class in M/E and SF trains (which some months you only had suggested) second half of the WL crowd problem can be tackled by reducing the WL allowed in the first place. Then more RPF should also be hired with proper training in crowd management.
Thus almost non existent UR crowd in Exp and SF trains, reduced WL passengers and increased RPF can definitely be useful in largely solving the overcrowding issue.
With this one issue will definitely be largely overcome but the second most prevalent issue of long distance trains running indefinitely late I don't know if it can ever be solved as day by day more and trains are being added on the already saturated railway tracks where even sometimes getting maintenance blocks is highly difficult (mentioned in the CAG report).

Translate to English
Translate to Hindi

95731 views
0

Dec 27 2023 (10:32)
StarcAndRussellWillDefeat
StarcAndRussellWillDefeat   1680 blog posts
Re# 5923189-22              
@5923189-0  @guest
Gareeb India, Bhkhari India is the slogan of this govt.
Translate to English
Translate to Hindi
General Travel
216106 views
48

★★★
Dec 02 2019 (12:37)   19037/Avadh Express (PT) | BDTS/Mumbai Bandra Terminus (7 PFs) | BRC/WAP-7/39030
AbdulRehman^~
AbdulRehman^~   12229 blog posts
Entry# 4503230            Tags   Past Edits
1 compliments
Great
Brand New LHB Rake Bandra Terminus Gorakhpur Avadh Express Standing On Pf-5 Bandra Terminus
Translate to English
Translate to Hindi

10 Posts

177737 views
1

Dec 02 2019 (21:18)
SakshamMaheshwa^~
SakshamMaheshwa^~   37037 blog posts
Re# 4503230-11              
Mind blowing Captures Brother 😍😍😍💖💖
Translate to English
Translate to Hindi

178876 views
1

Dec 02 2019 (21:38)
AbhishekVivek^~
AbhishekVivek^~   35637 blog posts
Re# 4503230-12              
Beautiful Pics 😍
Translate to English
Translate to Hindi

174761 views
1

Dec 03 2019 (11:04)
Piyush~
Piyush~   7026 blog posts
Re# 4503230-13              
Beautiful clicks 👍😊😊
Translate to English
Translate to Hindi

175834 views
2

Dec 03 2019 (17:55)
TheDarkLord
TheDarkLord   10267 blog posts
Re# 4503230-14              
It's raining LHB for MFP's trains. First Sapt, then Jansadharan and now Avadh.
Translate to English
Translate to Hindi

178061 views
0

Dec 03 2019 (19:00)
Brahman^~
Brahman^~   10924 blog posts
Re# 4503230-15              
Filhal k liye Nai mila MFP awadh ko Lhb
3 rake Lhb kar k sirf GKP wale awadh ki lhb diya
Translate to English
Translate to Hindi
Rail News
28570 views
0

Major Accidents/Disruptions
NER/North Eastern
Sep 14 (15:39)   Gonda-Gorakhpur Train Derailment: Trackman Dismissed After Audio Goes Viral

Ehtram Husain~   10630 news posts
Entry# 6190147         Tags   Past Edits
लापरवाही की पोल खोलने वाले पर कार्रवाई,चंडीगढ़-डिब्रूगढ़ सुपरफास्ट ट्रेन हादसे में कीमैन बर्खास्त

On July 18th, a Chandīgarh-Dibrugarh Superfast train derailed near Pikaura village between Motiganj and Jhilahi stations on the Gonda-Gorakhpur rail line. The accident resulted in the deaths of four passengers and injuries to 33 others. Following the incident, an audio recording of the trackman, Asne, went viral. Subsequently, the railway administration...
more...
took action and dismissed Asne from his position on Friday.

18 July ko Gonda-Gorakhpur rail line pe Motiganj aur Jhilahi station ke beech Pikaura village ke paas Chandīgarh-Dibrugarh Superfast train derail ho gayi thi. Is accident mein 4 passengers ki death aur 33 log injured ho gaye the. Accident ke baad trackman, Asne ka audio viral hua tha. Railway administration ne...
more...
Friday ko action lete hue Asne ko job se dismiss kar diya.

More Posts
Page#    Showing 1 to 5 of 1142 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy