Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  

Tamil Nadu Express - தங்களை அன்புடன் வரவேற்கிறது - Swaroop Kutti

Full Site Search
  Full Site Search  
 
Fri Aug 14 17:40:08 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Topics
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Advanced Search
<<prev entry    next entry>>
News Entry# 412952
Jul 03 (01:40) Third railway coaching terminal commissioned in Bengaluru (www.outlookindia.com)
SWR/South Western
0 Followers
10392 views

News Entry# 412952  Blog Entry# 4661339   
  Past Edits
This is a new feature showing past edits to this News Post.
Third railway coaching terminal commissioned in Bengaluru
Bengaluru, July 3 (IANS) The South Western Railway (SWR) has commissioned the Rs 240 crore third coaching terminal at Baiyyappanahalli in the city''s eastern suburb for starting passengers trains, an official said on Thursday.
"The third terminal will decongest the main station in the city centre and the Yesvantpur station in the northern suburb, as many passenger trains will be operated from Baiyappanahalli station," the Bengaluru division official told IANS here.
With
...
more...
increasing number of trains from all routes arriving or departing at short intervals, especially during the morning and night peak hours, platforms at the first two terminals have been unable to regulate their movements.
"Though all passengers trains have been suspended since the Covid-induced lockdown was enforced on March 25 and was extended further, testing of the yard was completed in the absence of traffic on the tracks," the official said.
The centrally air-conditioned third terminal will enable the zonal railway to operate more trains to Chennai and Mumbai regions from October 30.
"The yard has been remodelled with 18 lines, enabling us to operate 8 passenger trains from 7 platforms and have 6 stabling lines, 3 pit lines and1 spare for future pit line," said the official.
The existing Baiyappanahalli Yard is remodeled by providing 18 lines. The new station will have 8 passenger lines with 7 Platforms, 6 stabling lines, 3 pit lines, and a line for a future pit line.
The terminal will also have 5 loco bay lines, 1 track machine siding, 1 sick line, 1 shunting neck, 1 parcel siding, 1 inspection car siding and 2 short stabling lines for more capacity for simultaneous operation of arriving and departing trains from Chennai and Mumbai towards Hubballi in the state''s northwest region up to Goa.
All the lines are provided with starter, calling on and shunt signals to facilitate flexibility in operation. The yard is fully electrified with 25kv electrification.
--IANS

Rail News
7408 views
Jul 04 (16:21)
irifan2015
irifan2015   954 blog posts
Re# 4661339-1            Tags   Past Edits
MAS VSG, MAS UBL, PDY DR, TEN DR can get diverted via third terminal. This will make YPR platforms free for a proper Mumbai Bangalore super fast train.

Also, LTT CBE via third terminal can free SBC platforms in peak hours. A proper SBC to CBE or PGT overnight train can be thought of.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy