Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Jul 24, 2017 18:20:12 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Jul 24, 2017 18:20:12 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Page#    297824 Blog Entries  next>>
  
Rail News
0 Followers
0 views
Today (14:44)   Superfast trains 95% times delayed; CAG report

Jayashree   36979 news posts
Entry# 2361709   News Entry# 309368         Tags   Past Edits
Superfast trains which are expected to run at an average speed of 55km/hr, are delayed 95% times, CAG's investigation.
The CAG’s investigation shows that the ‘superfast’ trains are delayed almost 95% times. Supertrains are expected to run at an average speed of 55km/hr. But most express trains don’t seem to run at that speed.
The North Central Railway(NCR) and South Central Railway(SCR) have levied ₹11.17 crore from its passengers through superfast train bookings.
According
...
more...
to the statistics between 2013-14 to 2015-16 in NCR and SCR, these trains reach their destination late between 13.48% and 95.17% of the days on which they ran. In total, 21 superfast trains were delayed for 3,000 days out of 16,804 days because they failed to attain the ‘superfast’ speed for which they are being charged extra for long distances.
Currently, there are no as such policies by which the railways will refund money to passengers automatically for delays. They only provide the refund if a person files a ticket deposit against reservation (TDR) against a train delayed for more than three hours.
Agra divisional commercial manager Sanchit Tyagi on delay trains said, “There are scores of factors which lead to trains not achieving their superfast speed, thus causing delays. Some the prominent factors are the maintenance of tracks, signal glitches, emergency brakes and accidents which contribute in the late operations of railways.”

  
0 views
Today (18:20)
Pankaj   12 blog posts
Re# 2361709-1            Tags   Past Edits
The train no. 12541/12542 LTT GKP SF EXP. everyday reached the our destination on an Average "2 HOURS LATE"...
Train no. 12597 /12598 CSTM GKP JANSADHARAN SF EXP.
IS NEVER REACHED TO THE ON TIME IN OUR DESTINATION....
This train 12597 everytime reached the MUMBAI CST "2 TO 4 HOURS" LATE...
&
...
more...
IN RETURN THE TRAIN 12598 everytime reached the Gorakhpur Jn. "6 to 8 Hours" late...
plzzz CAG do something.....
  
★★  Rail Fanning
0 Followers
1852 views
Jun 04 2017 (19:17)   16345/Netravati Express (PT) | TNU/Tirunettur (1 PFs) | ED/WAP-4/22729

ALLP RailFan~   1132 blog posts
Entry# 2307293            Tags   Past Edits
Behind The Metro ...She is Cruising towards Venice of East 16345 LTT - TVC Nethravati Express behind ED WAP 4 22729
Departure: Today @ 15:35
63228/Mughalsarai -Patna MEMU
Trip# 113404    Traveller: siddharthanand82^~    Linked PNR Entry# 2361640
Class:
From: MGS/Mughal Sarai Junction
To: DNR/Danapur
9 wishes
HJ bro😂😂 HJ HJ HJSid HJ HJ HJ HJ HJ
Blog  Time-Table

24 posts - Today - are hidden. Click to open.

24 posts are hidden. Click to open.

  
49 views
Today (17:59)
siddharthanand82^~   11246 blog posts   478 correct pred (78% accurate)
Re# 2361640-30            Tags   Past Edits
ZNA/Zamania 4 km<-->2 km DRV/Darauli: 1h 23m late
90 kph

  
40 views
Today (18:02)
siddharthanand82^~   11246 blog posts   478 correct pred (78% accurate)
Re# 2361640-31            Tags   Past Edits
at DRV/Darauli: 1h 22m late
Arrived

  
34 views
Today (18:03)
siddharthanand82^~   11246 blog posts   478 correct pred (78% accurate)
Re# 2361640-32            Tags   Past Edits
at DRV/Darauli: 1h 23m late
Departed

  
18 views
Today (18:14)
siddharthanand82^~   11246 blog posts   478 correct pred (78% accurate)
Re# 2361640-33            Tags   Past Edits
at DLN/Dildarnagar Junction: 1h 24m late
Arrived

  
5 views
Today (18:19)
siddharthanand82^~   11246 blog posts   478 correct pred (78% accurate)
Re# 2361640-34            Tags   Past Edits
at DLN/Dildarnagar Junction: 1h 29m late
13484 Farakka arrived with LKO WDP4D 40302
TRIP HAS ENDED.
Blog  Time-Table

6 posts - Sat Jul 22, 2017 - are hidden. Click to open.

75 posts - Today - are hidden. Click to open.

  
And now here Departs my train
Next station &Halt is Bhilwara
10more kms to go....

  
Crossing river Kothari
After heavy rain from last 3 days
River started flowing

  
Arrived 4minutes late


  
TRIP HAS ENDED.
Trip ended
Arrived BHL On 06:16 pm
  
★  General Travel
0 Followers
151 views
Today (15:39)   12324/Anand Vihar (T) - Howrah SF Express | ALD/Allahabad Junction (10 PFs) | HWH/WAP-7/30478

Completed 1 year in IRI~   1793 blog posts   164 correct pred (69% accurate)
Entry# 2361553            Tags   Past Edits
Rarest of Rare. Failed HWH HOG WAP7 rescued by HWH WAP7! And Crossing with Failed BGKT WDG4+WAG7 CNB!
Credit-AST INDIAN railways
Locos
12559 BGKT WDG4
30478 HWH HOG WAP7
30204
...
more...
HWH WAP7
CNB WAG7
Page#    297824 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Aug 3
Trains with ARP 15 Dep on: Tue Aug 8
Trains with ARP 30 Dep on: Wed Aug 23
Trains with ARP 120 Dep on: Tue Nov 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.