Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Dec 11, 2017 15:20:30 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Dec 11, 2017 15:20:30 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Page#    346183 Blog Entries  next>>
  
★  Rail Fanning
0 Followers
136 views
Today (13:57)   22644/Patna - Ernakulam SF Express (via Visakhapatnam) (PT) | ERS/Ernakulam Junction (South) (6 PFs) | RPM/WAP-7(I)/30561

ALLP RailFan~   1356 blog posts
Entry# 2876663            Tags   Past Edits
RPM WAP 7i 30561 at its last leg of moment under Slight down pour arriving it's Destination ERS With 22644 PNBE- ERS Superfast Express ( Via Asansol, Chennai Central)
  
LHB rake for LTT - Faizabad Exp.. Dep LTT with LHB rake today.. Railfans please spot..!

1 posts - Today

  
RSA partner with Jnaneshwari/Samarsata Exp

  
agar 2 hi LHB rakes hai fir alternate hoga LHB ICF LHB..
3 lhb ho gaye ab ye lhb leke hi jayegi..

  
10 views
Today (15:16)
12649⭐️ KSK ⭐️12650^~   14235 blog posts   4141 correct pred (68% accurate)
Re# 2876988-4            Tags   Past Edits
3rd rake ka notification nahi aya SECR ka?

  
2 views
Today (15:18)
About to Reach 5K blogs^~   4987 blog posts   7292 correct pred (80% accurate)
Re# 2876988-5            Tags   Past Edits
Jaruri nahi har baar notification aaye
CR ne ek baar bhi notification nai diya

  
0 views
Today (15:19)
12649⭐️ KSK ⭐️12650^~   14235 blog posts   4141 correct pred (68% accurate)
Re# 2876988-6            Tags   Past Edits
SECR ne dono times diya tha isliye pucha.......shayad LTT-FD SECR se pass nahi hoti isliye nahi aya notification.....
  
Very Rare Capture : Never Seen before...
***** Diverted Train *****
GZB WAP4 Hauling 11078 Jammu Tawi - Pune Jhelum Express Arriving and Standing at PF3 of Aligarh Junction ALJN !!!

  
116 views
Today (14:44)
K K   22151 blog posts   21493 correct pred (67% accurate)
Re# 2876863-2            Tags   Past Edits
Thanks suhaib bhai.....in sb ke liye..

  
112 views
Today (14:44)
K K   22151 blog posts   21493 correct pred (67% accurate)
Re# 2876863-4            Tags   Past Edits
Aise mauke nhi chor skte hm log na..aap ho ya mai ya saif bhai..kisi na kisi ko toh lena hi tha..

  
58 views
Today (15:00)
22317 SDAH JAT HS 22318^~   26918 blog posts   103780 correct pred (76% accurate)
Re# 2876863-5            Tags   Past Edits
halt lia tha pf pe ya slow speed pe skip ?

  
11 views
Today (15:15)
Aligarh Smart City ©️~   946 blog posts   475 correct pred (77% accurate)
Re# 2876863-6            Tags   Past Edits
Bilkul bhai.... Yeh sb ka credit apko hi jaata h.... 😀😀😀

  
10 views
Today (15:16)
Aligarh Smart City ©️~   946 blog posts   475 correct pred (77% accurate)
Re# 2876863-7            Tags   Past Edits
Bhai Halt tha.....
  
Rail News
0 Followers
13 views
New Facilities/Technology
Today (13:42)   Speeding up Mission Raftaar -Governance Now

22317 SDAH JAT HS 22318^~   318 news posts
Entry# 2877031   News Entry# 324391         Tags   Past Edits
The Indian Railways’ Mission Raftaar, a project to increase the speed of trains on busy routes to reduce travel time, is finally picking up pace. Keeping in mind the 2019 Lok Sabha elections, railways minister Piyush Goyal has asked officials in his ministry to fast-track several rail projects, including Mission Raftar, to woo the passengers.
Introduced in the rail budget 2016-17, Mission Raftaar aims to offer semi-high-speed trains to passengers by running trains at a speed of 160-200 kmph in select corridors of the country. The project has been approved recently by the Niti Aayog and the extended board of the railways. However, it is still awaiting a clearance from the cabinet. In April 2016, the ministry had set up a
...
more...
mobility directorate to initiate measures for increasing the speed of trains.

The railways has chosen nine corridors where trains are proposed to run between 160 kmph and 200 kmph. They are: Delhi-Agra, Delhi-Chandigarh, Delhi-Kanpur, Nagpur-Bilaspur, Chennai-Bengaluru-Mysore, Mumbai-Goa, Mumbai-Ahmedabad, Chennai-Hyderabad and Nagpur-Secunderabad. These are the principal routes of the Indian Railways as they carry 58 percent of freight and 52 percent of passenger traffic with a share of only 15 percent of the total rail network.

At present, the average speed of goods trains is 25-27 kmph. The average speed of mail and superfast trains is around 55 kmph, while the average speed of premium trains like the Rajdhanis and the Shatabdis is 80-85 kmph.
To realise the dream of Mission Raftaar, the Indian Railways need to double the average speed of freight trains and increase the average speed of superfast express trains by 25 kmph in the next five years, which is not an easy task.

Many former railway board officials also believe that it would be an uphill task for the railways. The major challenges, according to them, would be to re-strengthen the old railway bridges, introduce an ultra-modern and expensive signalling system and fencing identified corridors.

Sunil Kumar, former additional member, railway board (IT) and advisor safety, says, “There are three things required for a semi-high-speed network: defect-less tracks, signalling and rolling stocks.”

A former chairman of the railway board (CRB), on condition of anonymity, told Governance Now that the German LHB coaches and locomotives, which the railways possess, are fit for 160 kmph operations. “The only problem is the old bridges, which are 100 years old. Trespassing is a major cause of concern. If trains run at a speed of 160-200 kmph, there should be no trespassing and the route should be fully fenced,” he says. Trespassing can be prevented by constructing road over -ridges, road under-bridges and underpasses, which is going to be an expensive affair.

A railway official agrees but says for trains to run at 160 kmph a modern signalling system, train protection and warning system (TPWS), as used in the Gatimaan Express, is also needed.

Moreover, the curvature of tracks is another problem to run the trains at such high speeds, feels SK Vij, former member (engineering), railway board.
“For running trains at 160 kmph, the ultrasonic flaw detection mechanism has to be very good. Huge investment will be required to have a modern signalling system, defect-free tracks and training of manpower,” says Sunil Kumar.

The construction of fencing is also not going to be cheap. It requires Rs 80 lakh per kilometre or Rs 400 crore for 500 km to build the fence along the chosen tracks.

But a senior official from the mobility directorate says that the expenditure for semi-high-speed train project would be less than the high speed network and metro system. “It would require around Rs200 crore per km for the high speed rail network and for the metro, it is Rs 150 crore. Compare Mission Raftaar with the other ambitious projects like the high-speed rail, it requires only Rs 8-9 crore per km,” he says.

For implementing such a big project thorough, planning is needed. The speed of trains cannot be increased in one go. China started upgrading its rail network in a phased manner since 1992. Because of its meticulous planning the country now has a high-speed rail network of over 20,000 km. “In India, one project is announced after another; and the railways is not able to prioritise the projects on which it should work first,” says the former CRB.

“The average speed of Chinese railways used to be lesser than the Indian Railways around two-three decades back but they gradually increased the speeds from 100 kmph to 160 kmph. Then to 200-250 kmph and finally built the high-speed rail network at 300-350 kmph,” he adds.
Furthermore, there is mix traffic in India, which means passenger and freight trains run on the same tracks. “It is now that the government is focusing on upgrading the speed of a select few trains. Many important trains are not able to run on their maximum speed because of the freight movement on the same track. The dedicated freight corridor, which is being built, would reduce the load on the tracks and facilitate faster movement of express trains,” says the former CRB.

Technical expertise for Mission Raftaar is also a big hindrance for the Indian Railways. “We have the rolling stocks which can run at 160 kmph but when it comes to operating the trains at 200 kmph we do not have the desired technical expertise. The Indian Railways has foreign collaborations for the 200 kmph project. But it would be possible only when we get the report from the concerned teams,” says the official from the mobility directorate. As of now the mandate is to increase the speed to 160 kmph provided the maximum travel shall not exceed to more than 12 hours.

SK Vij, on the other hand, believes that the railways should first try to increase the average speed of passenger and freight trains before contemplating to operate trains at 160 kmph. “We should not pursue higher maximum speeds on the existing network. Raising average speeds of both goods and coaching trains will generate capacity and revenues,” he says.

While Kumar feels that if the railways work meticulously it will be able to run the trains at 160 kmph within three years. “Keeping the existing traffic in mind, the railways should be able to make at least 200-300 km of tracks fit for 160-kmph operations every year,” he says.
Currently, the railways’ main focus is on two major routes – Delhi-Mumbai (1,400 km) and Delhi-Howrah (1,447 kms) – where trains would run at 160 kmph. At present, the Delhi-Mumbai Rajdhani runs at an average speed of 88 kmph and Delhi-Howrah Rajdhani at 86 kmphp.

The sanctioned project cost of Delhi-Mumbai corridor is Rs 11,189 crore and for Delhi-Howrah it is Rs 7,000 crore. The centre will bear the entire expenditure for these routes. The mobility directorate official says that the work would start immediately once the cabinet gives its go ahead.

Another route where the feasibility study is being carried out is Chennai-Bengaluru-Mysore. Here, the Chinese are conducting the study, which is fully funded by them. On this route, trains would run at 160 kmph. Since, it is a hilly terrain and has sharp curves, trains cannot run at 200 kmph here.

France’s state-owned railway company, SNCF, is carrying out the feasibility study of the Delhi-Chandigarh (243 km) route where trains are proposed to run at 200 kmph. SNCF is submitting its report to the Indian Railways on November 27, and it would be examined by the railway board and the research designs and standards organisation (RDSO). SNFC bagged the Rs 19.6 crore contract for the feasibility study in December 2015 on an equal cost sharing basis between the two countries.

The feasibility study for the Nagpur-Secunderabad (581 kms) route, where trains are proposed to run at 200 kmph, was started in June this year. It is expected to be completed by June 2019. The cost of the study is Rs 59 crore and would be equally shared by India and Russia.

Similarly, a joint declaration has been signed with Germany to prepare the feasibility report for the Chennai-Kazipet route to run trains at 200 kmph. The study is yet to start.

A railway official says that except for the Mumbai-Goa and Nagpur-Bilaspur corridors, all the other proposed routes have been touched upon for speed upgradation.

vishwas@governancenow.com
(The article apperas in December 15, 2017 issue)

  
17 views
Today (15:14)
12301HowrahRajdhaniTheGod~   2263 blog posts   1 correct pred (100% accurate)
Re# 2877031-1            Tags   Past Edits
Stop this non sense mission raftar -- see speed of all trains.
  
★  General Travel
0 Followers
838 views
Today (08:47)   01664/Bhopal Habibganj - Hubballi Special Fare Special | HBJ/Bhopal HabibGanj (5 PFs)

Arpan Pal   1329 blog posts   3 correct pred (56% accurate)
Entry# 2875576            Tags   Past Edits
News of Special train between Habibganj and Hubbali from 15th December.
PC: DB Bhopal Edition 11/12/2017.

23 posts - Today

  
41 views
Today (15:08)
12649⭐️ KSK ⭐️12650^~   14235 blog posts   4141 correct pred (68% accurate)
Re# 2875576-29            Tags   Past Edits
Actually demand is only for Pune, maybe there is parking issue at PUNE so they extended it to UBL......most pax boarding from HBJ/ET will get down at PUNE...from PUNE it will be like PUNE-UBL Intercity.....I don't think many people boarding this train from HBJ will travel beyond PUNE...
Also extension to VSG/GDG is not possible beause of less TAT at UBL
And if it doesn't go via PUNE (and takes MMR-SUR-GDG route), then it won't be successful

  
31 views
Today (15:11)
Vistadome for Dudhsagar~   4574 blog posts   332 correct pred (69% accurate)
Re# 2875576-30            Tags   Past Edits
Thought same, no parking at Pune, so somewhere they have to extend, it's a welcome train, at-least it will remove some load from KSK between Bpl and Ubl.

  
28 views
Today (15:12)
12649⭐️ KSK ⭐️12650^~   14235 blog posts   4141 correct pred (68% accurate)
Re# 2875576-31            Tags   Past Edits
I think Kolhapur was better destination. On same day KSK is there for UBL pax....

  
22 views
Today (15:13)
Arpan Pal   1329 blog posts   3 correct pred (56% accurate)
Re# 2875576-32            Tags   Past Edits
Yes but since it is most probably going to have RSA with 01661/62 Hbj-Puri-Hbj. It cannot return to Habibganj from Vsg on given day. That is also the reason why it is not going till YPR instead of having huge demand to Banglore.

  
16 views
Today (15:14)
Vistadome for Dudhsagar~   4574 blog posts   332 correct pred (69% accurate)
Re# 2875576-33            Tags   Past Edits
KSK also running pack between Pune-Ubl-Ypr for this month. From Ubl pax can get few options to go Ypr/Sbc, so this can act as good supplement train
Page#    346183 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Dec 21
Trains with ARP 15 Dep on: Tue Dec 26
Trains with ARP 30 Dep on: Wed Jan 10
Trains with ARP 120 Dep on: Tue Apr 10

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.