I feel all trains on sbc or ypr to hsra route should have a minute's stop at crlm. High time stations like crlm and anekal road are utilised to decrease the dependency on sbc or ypr. Similarly, crlm shud get minimum two more platforms, connecting buses, waitong room , railway announcement system plus platforms able to accommodate 24 coach trains. This line may be taken up for doubling in the near future. Though slower now, nearer route to sa, ed