The train has a very limited change over time at LTT, so SCR has deployed an on-board cleaning staff for this train. They clean the whole train regularly. Even sleeper class was neat and clean. But the rake was bit old. My coach was 2007-08 made. Charging socket were 2 in number present in each sleeper bogie.
Water filling was not done at LTT , so from LTT-SUR it was a very limited water supply. Water filling was done at solapur.