Forum Super Search
Posting Date From:
Posting Date To:
Train Type:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Full Site Search
Sun Mar 18, 2018 15:58:07 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Mar 18, 2018 15:58:07 IST

Blog Entry# 2951608
Posted: Dec 30 2017 (03:49)

1 Responses
Last Response: Dec 30 2017 (11:15)
★★  Rail Fanning
Dec 30 2017 (03:49)   19713/Jaipur - Secunderabad Express | NAVI/New Amravati (1 PFs)

awes khan*^~   51538 blog posts   2185 correct pred (78% accurate)
Entry# 2951608            Tags   Past Edits
New Amravati - Nandgaon Peth Amravati MIDC 23km single electric line joining Narkher -New Amravati - Badnera Jn route.
Video was taken from 19713 Jaipur - Secundaraba Express.
Date - 27th May 2013 17:55 (On time)
This line was started in 2013. After 7 months of this video, freight trains are running with electric loco on Badnera- New Amravati - Walgaon - MIDC section.
Official date of electrification of this section is 11 december 2013. Nandgaon MIDC is located in eastern part of Amravati city. Now this 5 star Amravati industrial area are connected with Railway line as well as Amravati - Nagpur Expressway (National Highway No 6). Terminating station of this branch line is Ratan Tata Thermal power Plant, located in east Amravati.
In this freight terminating yard total 12 Goods train can be park at a time. In this 23km section one passing station is located at 12km from Walgaon station. Vitthalapur station has 2 loop line and 1 mainline for crossing and overtakes of freight.
Two Byepass chord line is present for avoiding reversal at Walgaon station. Freight coming from Badnera side can directly take this route without touching Walgaon station. Similarly freight coming from Narkher side can also take this route from another byepass line without touching Walgaon station.
This was my first video on YouTube channel. Thanks for watching.

Dec 30 2017 (11:15)
nankit0507~   1228 blog posts   79 correct pred (62% accurate)
Re# 2951608-1            Tags   Past Edits
Yes that yard will be used by Mega industries like one is thermal plant, textile park, Bharat Dynamics Missile unit, Patanjali Food processing plant, and many other are there. Great work done there.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Mar 28
Trains with ARP 15 Dep on: Mon Apr 2
Trains with ARP 30 Dep on: Tue Apr 17
Trains with ARP 120 Dep on: Mon Jul 16


Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)

    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)

    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)

    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)

    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)

    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)

    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom

Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.