Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Sat Apr 21, 2018 02:26:47 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback

Blog Entry# 3181506
Posted: Mar 08 2018 (02:24)

9 Responses
Last Response: Mar 16 2018 (19:33)
  
Poll
0 Followers
1467 views
21 votes
Mar 08 2018 (02:24)  

16229🔹Mysuru↔️Varanasi Express🔹16230^~   3922 blog posts   16 correct pred (94% accurate)
Entry# 3181506            Tags   Past Edits
According to you which of the following SCR new line project must be completed as early as possible. If you opt for more than one project, vote for one of the projects and comment other projects.
Rail connectivity to Amaravati0%0
Kadapa - Bengaluru43%9
Proddatur - Cumbum0%0
Nadikudi - Srikalahasti19%4
Kotipalli - Narsapur0%0
Gudur - Durgarajapatnam0%0
Obulavaripalli - Krishnapatnam via Venkatachalam14%3
Bhadrachalam - Kovvur14%3
Bhadrachalam - Kondapalli0%0
Manuguru - Ramagundam0%0
Nalgonda - Macherla0%0
Akanapet - Medak0%0
Devarkadra - Krishna via Jaklair0%0
Manoharabad - Kothapalli0%0
Telapur - Ramachandrapuram0%0
All the above10%2
Other opinion / project - Please comment0%0

4 posts - Thu Mar 08, 2018

  
672 views
Mar 08 2018 (17:20)
Goundamani   640 blog posts
Re# 3181506-9            Tags   Past Edits
Devarkadra - Krishna via Jaklair will be completed first.

  
452 views
Mar 08 2018 (21:07)
mnj777~   385 blog posts   13 correct pred (82% accurate)
Re# 3181506-10            Tags   Past Edits
Bro I'm from mining background I understand pollution problem but it's not about pollution alone, thick forests are being chopped down for various reasons which includes polavaram in the area. And dependence on coal is going down.

  
326 views
Mar 09 2018 (11:19)
BDCR KOVVUR New Line~   176 blog posts   7386 correct pred (69% accurate)
Re# 3181506-11            Tags   Past Edits
One thing needs to understand is.. These are not thick/dense forest.. Polavaram and this rail route are two different directions and two different things.. Most important thing is Railways/governament can develop forests much on the near by areas while lying this route..
Most importantly it will reduce distance between SC/KZJ to VSKP/HWH. acts as a 2nd route in that area and removes congestion/loco reverse problem in BZA. It will give needed connectivity for tribal and industrail areas of khammam and godavari distrcits, which is lesser known to world..
Another thing is while having
...
more...
a highway through that route, why cann't a railway route be made, As this helps a lot to eco system than a highway..

  
186 views
Mar 16 2018 (17:13)
vinit182459   61 blog posts
Re# 3181506-12            Tags   Past Edits
Present loading and unloading coal by scr in ramagundam regoin is 6cr per day. Still railway is neglecting the manuguru-ramagundam line. Defenately it will boost the areas between rajamundry and ramagundam.

  
223 views
Mar 16 2018 (19:33)
mnj777~   385 blog posts   13 correct pred (82% accurate)
Re# 3181506-13            Tags   Past Edits
Manuguru rdm will be good, because it's coal belt. Rjy side financial ga viable but ecological ga forests pothai kada bro

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue May 1
Trains with ARP 15 Dep on: Sun May 6
Trains with ARP 30 Dep on: Mon May 21
Trains with ARP 120 Dep on: Sun Aug 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.