Not a serious issue. Pretty much all new designs fail the initial tests. The initial WAP7 designs were failures. The WAG7/ WAP4 locos went through many redesigns before they became successful. Its quite common with any new technology. Given that this is the first time ever that IR is using twin-unit locos, this is not surprising.