Was waiting for that only In DDU-PNBE 🙂
I think if this train was in ECR it would have got LHB long back but it's UBL division in SWR is yet to LHBfy a single train.
By topping up diesel engine between LKO-AY-LKO, 107 km ka kya matlab hai ki lucknow se ayodhya phir se diesel engine attached hoga.
Top up mein eloco ko band karke uske aage diesel loco ko attach kiya jayega